Job Info for 0508-03-114

County: CHAMBERS Highway: SH 73 Date: 06/05/2024 (5 months ago) Engineer's Estimate: $29,860,309 Control Number: 0508-03-114
Project: F 2B24(200) District: BEAUMONT Time: 180 WORKING DAYS Type: SURFACING/ROADWAY RESTORATION
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $29,860,308.88
TEXAS MATERIALS GROUP, INC.   $23,585,947.62 1
-21.01% | -$6,274,361.26
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC   $26,048,017.60 2
-12.77% | -$3,812,291.28
10.44% | $2,462,069.98
Subcontractor Percentage Amount
SEMPER STRIPING LLC 1.58% $372,657.97
ROSELL HUMPHREY TRUCKING COMPANY 0.98% $231,142.29
AMERICAN REMEDIATION OPTIONS, INC. 0.58% $136,798.50
PROFESSIONAL TRAFFIC CONTROL LLC 0.23% $54,247.68
KINGZ INDUSTRIAL LLC 0.05% $11,792.97
Total: 3.42% $806,639.41

Bid Items

Items: 37, 0 filtered
CHAMBERS SH 73  |  BEAUMONT  |  0508-03-114  |  06/05/2024  |  $29,860,309  |  F 2B24(200)  |  SURF/ROADWAY RESTOR  |  180 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TEXAS MATERIALS GROUP, INC. VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
134 6004 BACKFILL (TY A OR B) STA 2,122.240 $200.000 $291.000 $373.930
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 188,644.000 $1.000 $0.300 $0.450
168 6001 VEGETATIVE WATERING MG 1,588.000 $35.000 $34.000 $11.370
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 21,120.000 $66.000 $73.000 $70.640
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 14,358.000 $4.150 $5.750 $4.670
354 6041 PLANE ASPH CONC PAV (1.5") SY 21,120.000 $2.100 $1.800 $2.320
500 6001 MOBILIZATION LS 1.000 $2,000,000.000 $1,000,000.000 $1,834,860.140
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 $3,500.000 $3,600.000 $38,473.230
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 400.000 $6.900 $6.000 $7.430
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 400.000 $1.000 $2.000 $1.580
530 6004 DRIVEWAYS (CONC) SY 54.000 $120.000 $390.000 $341.040
530 6011 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY 8,205.000 $70.000 $36.500 $23.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 414,578.000 $0.390 $0.060 $0.170
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 21.000 $790.000 $530.000 $524.100
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 98.000 $994.500 $550.000 $575.590
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $1,006.000 $750.000 $795.600
644 6076 REMOVE SM RD SN SUP&AM EA 120.000 $120.000 $95.000 $73.890
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 9,670.000 $1.760 $0.750 $1.100
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 350.000 $2.100 $0.750 $2.180
666 6017 REFL PAV MRK TY I (W)6"(DOT)(090MIL) LF 882.000 $1.230 $1.800 $1.760
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 21,502.000 $1.400 $0.600 $1.110
666 6305 RE PM W/RET REQ TY I (W)6"(BRK)(090MIL) LF 53,080.000 $0.700 $0.500 $0.920
666 6308 RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) LF 206,778.000 $0.700 $0.450 $0.800
666 6320 RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) LF 212,224.000 $0.700 $0.450 $0.800
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 228.000 $16.000 $12.500 $0.800
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 129.000 $250.000 $170.000 $277.380
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 129.000 $304.000 $235.000 $413.800
668 6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 336.000 $44.000 $55.000 $58.940
668 6108 PREFAB PAV MRK TY C (Y) (24") (SLD) LF 3,160.000 $17.000 $12.500 $18.190
672 6009 REFL PAV MRKR TY II-A-A EA 206.000 $5.500 $4.000 $5.630
672 6010 REFL PAV MRKR TY II-C-R EA 3,731.000 $5.500 $4.000 $5.120
3076 6035 D-GR HMA TY-D PG64-22 TON 45,296.000 $170.000 $125.000 $123.240
3076 6066 TACK COAT GAL 17,097.000 $5.000 $3.600 $8.410
3077 6033 SP MIXES SP-C SAC-A PG76-22 TON 97,800.000 $165.000 $137.000 $146.500
3077 6075 TACK COAT GAL 53,345.000 $5.000 $3.600 $3.320
6185 6002 TMA (STATIONARY) DAY 151.000 $246.000 $250.000 $292.930
6185 6005 TMA (MOBILE OPERATION) DAY 20.000 $265.000 $430.000 $292.930
Totals: $29,860,308.88 $23,585,947.62 $26,048,017.60