CHAMBERS IH 10 (0508-02-140)

Items: 93

County: CHAMBERS
Length: 0.0000 MILES (3.8264 MILES)
Highway: IH 10
District: BEAUMONT
Control Number: 0508-02-140
DBE Goal: 0.0%
Project: STP 2026(496)MM
Guaranty: $69,000.00
Time: 102 WORKING DAYS
Engineer's Estimate: $3,459,416.41
Date: 07/02/2026 1:00 PM CDT (16 days ago) Changed
Contract Number: 7263037
Type: PREVENTIVE MAINTENANCE
Project ID: A00210045
Contract Type: FEDERAL
Project Description: IH 10 WB FR (END OF CONCRETE SH 99, EAST TO 0.17 MILES EAST OF FM 565) FULL DEPTH BASE REPAIR, AND OVERLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ROBERTO RODRIGUEZ
ROBERTO M RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,459,416.41
Over/Under Est: -3.68% -$127,341.21
Over/Under Est: -3.58% -$123,921.83
Amt Left: 0.1% $3,419.38
Over/Under Est: -1.56% -$54,114.06
Amt Left: 2.2% $73,227.15
Delta: -2.09% -$69,807.77

Bid Items & Bid Tabulations

93 Total 0 of 93
CHAMBERS  |  IH 10  |  BEAUMONT  |  0508-02-140  |  07/02/2026 1:00 PM CDT  |  $3,459,416.41  |  STP 2026(496)MM  |  PREVENT MAINT  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
TEXAS MATERIALS GROUP, INC.
REMOV CONC (MOWSTRIP)
SY 1,297.000 $34.180 $27.000 $15.000 $36.500
EMBANK (FNL)(OC)(TY C)
CY 74.000 $6.000 $100.000 $85.000 $95.300
BACKFILL (TY A OR B)
STA 195.000 $29.000 $125.000 $325.000 $233.300
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 24,750.000 $0.600 $0.500 $0.490 $0.400
VEGETATIVE WATERING
TGL 209.000 $45.000 $30.000 $10.000 $41.000
ASPH (AC-20-5TR)
GAL 20,431.000 $4.000 $4.200 $4.300 $4.100
AGGR (TY-PB OR PL, GR-4)(SAC-A)
CY 437.000 $225.000 $220.000 $173.000 $298.500
D-GR HMA TY-D SAC-A PG76-22 (EXEMPT)
TON 4,682.000 $150.000 $135.000 $136.700 $134.300
TACK COAT
GAL 2,270.000 $3.200 $3.500 $4.500 $4.100
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 6,243.000 $160.000 $217.000 $179.000 $185.000
TACK COAT
GAL 2,270.000 $4.000 $3.500 $4.500 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 3,000.000 $70.000 $42.000 $87.000 $100.400
PLANE ASPH CONC PAV(0" TO 2")
SY 7,313.000 $3.000 $4.000 $1.000 $12.500
PLANE ASPH CONC PAV (1.5")
SY 56,754.000 $3.900 $1.500 $2.450 $1.700
PLANE & TEXT ASPH CONC PAV(0" TO 1.5")
SY 162.000 $3.000 $14.000 $15.500 $10.300
RIPRAP (MOW STRIP)(4 IN)
CY 147.000 $642.000 $850.000 $675.000 $710.400
CLEANING AND SEALING EXISTING JOINTS
LF 1,043.000 $10.000 $7.000 $32.000 $8.500
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 20.000 $787.000 $1,100.000 $900.000 $1,180.000
WINGWALL (PW - 2) (HW=4 FT)
EA 1.000 $12,000.000 $23,000.000 $9,500.000 $13,663.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $2,100.000 $3,000.000 $2,500.000 $2,618.000
REMOV STR (WINGWALL)
EA 1.000 $3,400.000 $2,000.000 $1,500.000 $5,490.000
MOBILIZATION
LS 1.000 $34,290.000 $120,000.000 $210,000.000 $125,990.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $11,800.000 $7,000.000 $4,000.000 $1,308.000
TMA (STATIONARY)
DAY 75.000 $326.000 $350.000 $250.000 $274.000
TMA (MOBILE OPERATION)
DAY 15.000 $158.000 $350.000 $250.000 $457.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 660.000 $20.000 $10.000 $7.000 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 660.000 $6.000 $2.000 $1.000 $1.100
INTERSECTIONS (ACP)
SY 1,944.000 $110.000 $35.000 $35.000 $46.300
DRIVEWAYS (ACP)
SY 1,334.000 $75.000 $30.000 $49.100 $54.300
DRIVEWAYS (BASE)
SY 101.000 $32.000 $70.000 $48.000 $62.400
TURNOUTS (ACP)
SY 77.000 $72.000 $70.000 $78.700 $165.500
MTL W-BEAM GD FEN (TIM POST)
LF 1,800.000 $30.000 $28.000 $25.500 $27.800
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $2,000.000 $2,250.000 $1,950.000 $2,178.000
CONNECTOR PLATE FOR THRIE BEAM
EA 7.000 $997.000 $1,000.000 $650.000 $828.000
REMOVE METAL BEAM GUARD FENCE
LF 1,800.000 $4.000 $3.000 $3.500 $2.800
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000 $250.000 $300.000 $350.000 $272.300
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,500.000 $3,350.000 $3,100.000 $3,212.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 16.000 $5,000.000 $1,100.000 $3,150.000 $980.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 6.000 $250.000 $320.000 $300.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 18.000 $750.000 $690.000 $625.000 $653.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 22.000 $800.000 $775.000 $725.000 $773.100
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $908.000 $800.000 $850.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,100.000 $950.000 $850.000 $956.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 4.000 $900.000 $900.000 $625.000 $819.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 4.000 $933.000 $950.000 $725.000 $866.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $800.000 $1,400.000 $750.000 $1,236.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $980.000 $1,500.000 $850.000 $1,360.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,000.000 $1,250.000 $950.000 $1,236.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 2.000 $1,166.000 $1,050.000 $775.000 $1,024.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 1.000 $1,095.000 $1,400.000 $850.000 $1,323.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 2.000 $2,555.000 $1,170.000 $950.000 $1,089.000
IN SM RD SN SUP&AM TYS80(1)SB(U-WC)
EA 1.000 $2,000.000 $1,600.000 $1,000.000 $1,574.000
REMOVE SM RD SN SUP&AM
EA 62.000 $9.600 $110.000 $75.000 $104.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 28.000 $49.000 $40.000 $25.000 $39.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
EA 12.000 $5.300 $30.000 $15.000 $27.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 2.000 $110.700 $120.000 $150.000 $114.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 104.000 $44.800 $12.000 $5.000 $11.000
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 37.000 $11.350 $30.000 $50.000 $30.000
INSTL OM SM RD SIGN (1-OM-PW)R
EA 25.000 $20.800 $30.000 $50.000 $30.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 5,050.000 $1.000 $0.300 $0.400 $0.300
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 19,297.000 $1.000 $0.300 $0.400 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 273.000 $1.000 $2.000 $0.500 $0.900
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 6,094.000 $1.000 $0.600 $0.400 $0.500
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 290.000 $3.000 $4.000 $2.000 $2.180
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 16.000 $74.000 $90.000 $50.000 $87.100
WK ZN PAV MRK NON-REMOV (W)(UTURN ARW)
EA 2.000 $114.000 $200.000 $75.000 $164.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 15.000 $80.000 $175.000 $50.000 $109.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 2.000 $39.000 $28.000 $10.000 $27.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 20,527.000 $1.000 $0.300 $0.400 $0.300
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
LF 1,794.000 $2.000 $2.200 $2.000 $2.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,570.000 $1.000 $2.500 $2.000 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,568.000 $2.000 $2.500 $2.000 $0.300
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 273.000 $1.000 $3.000 $2.000 $0.150
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 290.000 $2.000 $5.000 $3.500 $4.400
REFL PAV MRK TY I(W)(ENTR GORE)(090MIL)
EA 11.000 $300.000 $740.000 $500.000 $707.800
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
EA 4.000 $500.000 $900.000 $500.000 $871.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 2.000 $75.000 $70.000 $35.000 $54.500
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 1,794.000 $2.000 $4.400 $3.500 $4.400
RE PM TY II (W) 8" (SLD)
LF 6,094.000 $1.000 $0.600 $0.500 $0.400
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 5,050.000 $1.000 $0.650 $0.750 $0.700
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 19,297.000 $1.000 $0.650 $0.670 $0.700
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 20,527.000 $1.000 $0.650 $0.670 $0.700
PREFAB PM TY C (W)(24")(SLD)
LF 14.000 $10.000 $25.000 $16.000 $21.800
PREFAB PM TY C (W)(ARROW)
EA 16.000 $340.000 $250.000 $250.000 $255.900
PREFAB PM TY C (W)(DBL ARROW)
EA 5.000 $397.000 $450.000 $350.000 $457.400
PREFAB PM TY C (W)(UTURN ARROW)
EA 2.000 $290.000 $430.000 $350.000 $420.000
PREFAB PM TY C (W)(WORD)
EA 15.000 $550.000 $300.000 $275.000 $300.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 2.000 $53.000 $90.000 $25.000 $54.500
REFL PAV MRKR TY II-A-A
EA 25.000 $8.000 $6.500 $5.500 $6.500
REFL PAV MRKR TY II-C-R
EA 372.000 $10.000 $6.500 $5.500 $6.500
FULL - WIDTH MOWING
CYC 2.000 $4,700.000 $5,000.000 $3,500.000 $500.000
LITTER REMOVAL
CYC 2.000 $3,500.000 $1,700.000 $1,500.000 $500.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 2.000 $2,600.000 $3,200.000 $3,500.000 $500.000
Totals: $3,459,416.410 $3,332,075.200 $3,335,494.580 $3,405,302.350
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $20,000.00