Job Info for 0508-02-129

County: CHAMBERS Highway: IH 10 Date: 01/04/2024 (10 months ago) Engineer's Estimate: $2,629,218 Control Number: 0508-02-129
Project: C 508-2-129 District: BEAUMONT Time: 44 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,629,217.87
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.   $2,423,889.70 1
-7.81% | -$205,328.17
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC   $2,460,064.62 2
-6.43% | -$169,153.25
1.49% | $36,174.92
TEXAS MATERIALS GROUP, INC.   $2,496,890.40 3
-5.03% | -$132,327.47
3.01% | $73,000.70
1.50% | $36,825.78
Subcontractor Percentage Amount
BATTERSON, LLP 3.23% $78,291.64
KINGZ INDUSTRIAL LLC 1.74% $42,175.68
HAZMAT INTERNATIONAL, INC. 1.14% $27,632.34
SOUTHWEST ENVIRONMENT SERVICES LLC 0.25% $6,059.72
STRIPE LINES, INC. 0.25% $6,059.72
Total: 6.61% $160,219.10

Bid Items

Items: 33, 0 filtered
CHAMBERS IH 10  |  BEAUMONT  |  0508-02-129  |  01/04/2024  |  $2,629,218  |  C 508-2-129  |  REHAB EXIST ROADWAY  |  44 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC TEXAS MATERIALS GROUP, INC.
134 6004 BACKFILL (TY A OR B) STA 587.000 $275.000 $125.000 $182.220 $310.000
164 6025 CELL FBR MLCH SEED(PERM)(URBAN)(SANDY) SY 13,038.000 $0.440 $0.750 $0.770 $0.500
168 6001 VEGETATIVE WATERING MG 23.000 $80.000 $100.000 $395.980 $210.000
351 6006 FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") SY 1,265.000 $147.000 $90.000 $81.420 $113.000
354 6037 PLANE CONC PAV(0" TO 2") SY 45,800.000 $11.220 $2.250 $4.280 $0.100
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 11.000 $800.000 $1,500.000 $512.040 $1,200.000
500 6001 MOBILIZATION LS 1.000 $237,947.910 $240,000.000 $193,014.490 $73,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $3,883.000 $4,000.000 $1,253.460 $1,200.000
514 6013 PERM CTB (F-SHAPE) (TY 1) LF 240.000 $21.150 $210.000 $133.130 $145.000
530 6011 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY 224.000 $70.000 $40.000 $183.900 $170.000
530 6016 DRIVEWAYS (BASE) SY 243.000 $57.700 $60.000 $94.050 $70.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 2.000 $2,165.000 $2,000.000 $3,055.520 $2,800.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 43.000 $623.000 $505.000 $584.540 $750.000
662 6005 WK ZN PAV MRK NON-REMOV (W)6"(BRK) LF 6,980.000 $0.700 $0.400 $0.420 $0.400
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 33,434.000 $0.610 $0.400 $0.390 $0.300
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 31,132.000 $0.330 $0.400 $0.390 $0.350
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 2,069.000 $1.760 $1.000 $1.300 $0.700
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 427.000 $1.120 $1.000 $1.380 $2.000
666 6047 REFL PAV MRK TY I (W)24"(SLD)(090MIL) LF 48.000 $9.400 $6.000 $9.730 $8.000
666 6146 REFL PAV MRK TY I (Y)24"(SLD)(090MIL) LF 782.000 $7.880 $6.000 $6.910 $8.000
666 6305 RE PM W/RET REQ TY I (W)6"(BRK)(090MIL) LF 6,980.000 $0.740 $0.550 $0.830 $0.700
666 6308 RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) LF 33,434.000 $0.580 $0.550 $0.670 $0.600
666 6320 RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) LF 31,132.000 $0.710 $0.550 $0.670 $0.650
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 2.000 $278.000 $250.000 $260.110 $275.000
668 6091 PREFAB PAV MRK TY C (W) (18")(YLD TRI) EA 8.000 $26.000 $38.000 $25.600 $75.000
672 6009 REFL PAV MRKR TY II-A-A EA 334.000 $6.800 $5.750 $5.100 $5.000
672 6010 REFL PAV MRKR TY II-C-R EA 344.000 $4.760 $5.750 $5.100 $5.000
678 6002 PAV SURF PREP FOR MRK (6") LF 3,300.000 $1.000 $0.100 $0.100 $0.050
3080 6007 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 TON 9,067.000 $140.000 $180.000 $171.390 $200.000
3080 6029 TACK COAT GAL 4,731.000 $6.000 $4.000 $7.230 $3.500
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $10,000.000 $7,000.000 $4,017.680 $6,700.000
6185 6002 TMA (STATIONARY) DAY 40.000 $400.000 $180.000 $414.110 $250.000
6185 6005 TMA (MOBILE OPERATION) DAY 4.000 $351.380 $180.000 $414.110 $650.000
Totals: $2,629,217.87 $2,423,889.70 $2,460,064.62 $2,496,890.40