REMOVING CONC (DRIVEWAYS)
|
SY
|
475.000
|
$20.000
|
$16.500
|
$15.000
|
$13.500
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
481.300
|
$20.000
|
$16.500
|
$5.000
|
$10.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,887.500
|
$10.000
|
$8.800
|
$9.000
|
$10.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
360.000
|
$15.000
|
$33.910
|
$12.000
|
$22.000
|
|
|
BACKFILL (TY C)
|
STA
|
525.000
|
$300.000
|
$540.260
|
$350.000
|
$205.000
|
|
|
BLADING
|
STA
|
60.000
|
$150.000
|
$58.360
|
$600.000
|
$255.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
39,395.000
|
$0.200
|
$0.130
|
$0.140
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
11,528.000
|
$0.200
|
$0.110
|
$0.110
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
11,528.000
|
$0.200
|
$0.110
|
$0.110
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
695.000
|
$10.000
|
$61.740
|
$12.000
|
$1.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
4,328.000
|
$4.000
|
$9.640
|
$6.000
|
$5.000
|
|
|
ASPH (TIER II)
|
GAL
|
29,954.000
|
$4.000
|
$4.030
|
$4.000
|
$4.000
|
|
|
AGGR(TY-B GR-3 SAC-A)
|
CY
|
534.000
|
$110.000
|
$252.960
|
$90.000
|
$145.000
|
|
|
SUPERPAVE MIXTURES SP-C PG76-22
|
TON
|
25,524.000
|
$135.000
|
$111.210
|
$107.000
|
$110.000
|
|
|
SUPERPAVE MIXTURES SP-D PG76-22
|
TON
|
18,803.000
|
$135.000
|
$112.760
|
$107.000
|
$110.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
6,597.000
|
$50.000
|
$31.830
|
$30.000
|
$40.000
|
|
|
PLANE ASPH CONC PAV (0" TO 5")
|
SY
|
144,154.000
|
$3.000
|
$1.300
|
$2.000
|
$1.900
|
|
|
CL A CONC (CURB OUTLET)(TY II)
|
EA
|
5.000
|
$2,000.000
|
$2,200.000
|
$1,200.000
|
$1,400.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
5.000
|
$350.000
|
$495.000
|
$500.000
|
$740.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
352.000
|
$350.000
|
$467.500
|
$400.000
|
$480.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
100.000
|
$75.000
|
$97.900
|
$88.000
|
$105.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
264.000
|
$50.000
|
$49.500
|
$45.000
|
$45.000
|
|
|
SET (TY I)(S=10 FT)(HW=4FT)(3:1)(C)
|
EA
|
2.000
|
$10,000.000
|
$11,000.000
|
$5,000.000
|
$5,200.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$5,200.000
|
$6,600.000
|
$4,000.000
|
$4,200.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$7,500.000
|
$7,150.000
|
$4,000.000
|
$4,800.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
226.000
|
$700.000
|
$660.000
|
$565.000
|
$615.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$2,000.000
|
$825.000
|
$700.000
|
$750.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,225.000
|
$1,100.000
|
$900.000
|
$950.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,500.000
|
$1,430.000
|
$1,100.000
|
$1,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$2,150.000
|
$2,640.000
|
$2,000.000
|
$1,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,150.000
|
$3,850.000
|
$4,000.000
|
$2,600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
48.000
|
$10.000
|
$16.500
|
$12.000
|
$13.350
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$485,201.740
|
$900,000.000
|
$950,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$3,000.000
|
$2,857.800
|
$8,000.000
|
$9,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
600.000
|
$45.000
|
$26.400
|
$26.000
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
600.000
|
$15.000
|
$8.800
|
$8.000
|
$13.800
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,850.000
|
$3.000
|
$3.300
|
$4.000
|
$3.100
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,850.000
|
$1.000
|
$1.100
|
$1.000
|
$1.200
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
800.000
|
$30.000
|
$18.960
|
$75.000
|
$85.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,600.000
|
$10.000
|
$11.570
|
$10.000
|
$8.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
800.000
|
$15.000
|
$10.380
|
$10.000
|
$9.500
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
481.300
|
$20.000
|
$27.500
|
$30.000
|
$40.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
475.000
|
$100.000
|
$88.000
|
$88.000
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,861.000
|
$75.000
|
$34.500
|
$34.000
|
$31.000
|
|
|
TURNOUTS (ACP)
|
SY
|
1,820.000
|
$75.000
|
$34.500
|
$34.000
|
$33.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
106,186.000
|
$0.200
|
$0.110
|
$0.150
|
$0.140
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
6,568.750
|
$22.000
|
$20.350
|
$21.000
|
$24.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
281.250
|
$75.000
|
$79.200
|
$66.000
|
$94.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$1,595.000
|
$1,800.000
|
$1,660.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,200.500
|
$7.000
|
$2.200
|
$2.500
|
$4.100
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
22.000
|
$200.000
|
$247.500
|
$230.000
|
$120.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$275.000
|
$230.000
|
$240.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
30.000
|
$2,300.000
|
$2,557.500
|
$2,500.000
|
$2,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$8.000
|
$275.000
|
$230.000
|
$240.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$10,000.000
|
$10,835.000
|
$1,000.000
|
$12,800.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,800.000
|
$2,475.000
|
$2,500.000
|
$3,150.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$990.000
|
$600.000
|
$990.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
22.000
|
$200.000
|
$282.720
|
$280.000
|
$300.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$250.000
|
$325.800
|
$320.000
|
$330.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
4.000
|
$500.000
|
$686.390
|
$660.000
|
$615.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
63.000
|
$40.000
|
$67.050
|
$35.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
106,186.000
|
$0.150
|
$0.130
|
$0.130
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
106,186.000
|
$0.150
|
$0.130
|
$0.130
|
$0.130
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,309.000
|
$1.000
|
$1.310
|
$0.850
|
$0.820
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
106,186.000
|
$1.000
|
$1.250
|
$0.700
|
$0.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
460.000
|
$0.500
|
$1.100
|
$1.500
|
$1.100
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
390.000
|
$12.000
|
$14.300
|
$14.000
|
$14.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$200.000
|
$192.500
|
$200.000
|
$190.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$350.000
|
$275.000
|
$300.000
|
$275.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
350.000
|
$12.000
|
$14.300
|
$14.000
|
$14.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
320.000
|
$3.500
|
$3.630
|
$4.000
|
$3.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,654.000
|
$3.500
|
$3.630
|
$4.000
|
$3.600
|
|
|
FOAMED ASPHALT TREAT (10")(DC)
|
SY
|
48,089.000
|
$8.000
|
$9.760
|
$8.000
|
$4.750
|
|
|
ASPHALT BINDER (PG 64-22)
|
GAL
|
163,503.000
|
$5.000
|
$2.620
|
$4.000
|
$4.000
|
|
|
CEMENT
|
TON
|
361.000
|
$140.000
|
$170.930
|
$200.000
|
$165.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$6,800.000
|
$5,128.050
|
$15,000.000
|
$16,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
10,616.000
|
$3.000
|
$3.850
|
$4.000
|
$3.850
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
106,586.000
|
$0.400
|
$0.590
|
$0.600
|
$0.600
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
190.000
|
$0.520
|
$1.100
|
$1.100
|
$1.100
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
106,855.000
|
$0.400
|
$0.590
|
$0.600
|
$0.600
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
9,500.000
|
$0.520
|
$0.660
|
$0.800
|
$0.660
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$4,400.000
|
$39,228.850
|
$25,000.000
|
$20,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2.000
|
$100.000
|
$843.990
|
$1,100.000
|
$1,100.000
|
|
Totals: |
$11,124,878.150
|
$9,147,321.502
|
$9,309,079.670
|
$9,394,350.360
|