CASS US 59 (0218-03-087)

Items: 61

County: CASS
Length: N/A
Highway: US 59
District: ATLANTA
Control Number: 0218-03-087
DBE Goal: N/A
Project: C 218-3-87
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $9,212,636.06
Date: 02/01/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING FOUR LANE ROADWAY
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$9,212,636.06
1
$9,089,429.45
Over/Under Est: -1.34% -$123,206.61
$11,542,295.26
Over/Under Est: 25.29% $2,329,659.20
Amt Left: 26.99% $2,452,865.81

Bid Items & Bid Tabulations

61 Total 0 of 61
CASS  |  US 59  |  ATLANTA  |  0218-03-087  |  02/01/2023  |  $9,212,636.06  |  C 218-3-87  |  REHAB EXIST FOUR LANE ROADWAY  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 102.500 $3,000.000 $1,091.960 $8,000.000
REMOVING CONCRETE(MOW STRIP)
LF 456.000 $8.830 $19.050 $15.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 12.000 $40.000 $210.830 $100.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 66,831.000 $0.600 $0.580 $0.580
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 66,831.000 $0.170 $0.100 $0.100
VEGETATIVE WATERING
MG 2,138.620 $10.000 $23.210 $12.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 12,776.000 $55.010 $57.700 $65.000
PLANE ASPH CONC PAV (3 1/2")
SY 164,701.000 $2.500 $3.140 $4.000
RIPRAP (MOW STRIP)(4 IN)
CY 24.000 $600.000 $880.000 $600.000
MOBILIZATION
LS 1.000 $700,000.000 $454,471.470 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,000.000 $21,680.540 $90,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 475.000 $3.500 $3.960 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 475.000 $0.800 $0.110 $1.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 51,170.000 $0.500 $0.280 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 375.000 $30.000 $23.470 $23.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $45.000 $96.450 $92.000
DOWNSTREAM ANCHOR TERMINAL SECT (TY IV)
EA 2.000 $1,155.000 $1,540.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 375.000 $3.000 $2.200 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $175.000 $440.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,300.000 $3,001.900 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $275.000 $275.000 $300.000
ALUMINUM SIGNS (TY A)
SF 98.000 $30.000 $18.810 $21.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $680.000 $1,052.700 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $785.000 $1,052.700 $1,200.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $496.080 $897.600 $1,200.000
REMOVE SM RD SN SUP&AM
EA 7.000 $87.300 $114.400 $150.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $35.000 $41.800 $45.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 101,596.000 $0.500 $0.440 $0.440
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 61,811.000 $0.550 $0.440 $0.440
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 96,246.000 $0.500 $0.440 $0.440
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 277.000 $4.500 $5.500 $5.500
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 254.000 $4.500 $5.500 $5.500
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 510.000 $1.100 $4.400 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 510.000 $4.000 $4.400 $5.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 13,689.000 $0.500 $2.360 $1.500
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 2,322.000 $0.500 $2.360 $1.500
PAVEMENT SEALER 10"
LF 1,975.000 $0.720 $1.100 $1.100
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 1,975.000 $20.000 $8.800 $9.000
PREFAB PAV MRK TY C (W) (8") (DOT)
LF 1,067.000 $5.310 $4.950 $5.000
PREFAB PAV MRK TY C (W) (8") (SLD)
LF 5,905.000 $5.500 $4.400 $4.400
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 625.000 $20.000 $14.850 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 13.000 $215.000 $220.000 $220.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $255.000 $275.000 $270.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 200.000 $45.000 $39.270 $40.000
REFL PAV MRKR TY I-C
EA 627.000 $3.750 $3.960 $4.000
REFL PAV MRKR TY II-A-A
EA 1,132.000 $4.500 $3.630 $4.000
REFL PAV MRKR TY II-C-R
EA 715.000 $4.000 $3.960 $4.000
ELIM EXT PAV MRK & MRKS (6")
LF 72,996.000 $0.750 $0.720 $0.720
NO. OF WORKING DAYS
$/D 18,573.000 $79.000 $79.000 $69.000
SP MIXES SP-D PG76-22
TON 20,303.000 $150.000 $138.550 $165.000
TACK COAT
GAL 22,576.000 $4.000 $5.360 $4.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 11,357.000 $160.000 $180.170 $210.000
TACK COAT
GAL 10,327.000 $4.000 $6.200 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $12,526.590 $30,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 4,280.000 $5.000 $6.880 $7.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 35,150.000 $0.750 $0.790 $0.800
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 8,488.000 $0.750 $0.830 $0.800
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 47,198.000 $0.750 $0.790 $0.800
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
LF 4,400.000 $0.630 $0.830 $0.800
TMA (STATIONARY)
DAY 79.000 $150.000 $462.370 $300.000
TMA (MOBILE OPERATION)
DAY 10.000 $200.000 $840.060 $300.000
Totals: $9,212,636.060 $9,089,429.450 $11,542,295.260