PREPARING ROW
|
STA
|
102.500
|
$3,000.000
|
$1,091.960
|
$8,000.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
456.000
|
$8.830
|
$19.050
|
$15.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
12.000
|
$40.000
|
$210.830
|
$100.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
66,831.000
|
$0.600
|
$0.580
|
$0.580
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
66,831.000
|
$0.170
|
$0.100
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
2,138.620
|
$10.000
|
$23.210
|
$12.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
12,776.000
|
$55.010
|
$57.700
|
$65.000
|
|
|
PLANE ASPH CONC PAV (3 1/2")
|
SY
|
164,701.000
|
$2.500
|
$3.140
|
$4.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
24.000
|
$600.000
|
$880.000
|
$600.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$700,000.000
|
$454,471.470
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$6,000.000
|
$21,680.540
|
$90,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
475.000
|
$3.500
|
$3.960
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
475.000
|
$0.800
|
$0.110
|
$1.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
51,170.000
|
$0.500
|
$0.280
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
375.000
|
$30.000
|
$23.470
|
$23.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$45.000
|
$96.450
|
$92.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECT (TY IV)
|
EA
|
2.000
|
$1,155.000
|
$1,540.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
375.000
|
$3.000
|
$2.200
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$175.000
|
$440.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,300.000
|
$3,001.900
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$275.000
|
$275.000
|
$300.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
98.000
|
$30.000
|
$18.810
|
$21.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$680.000
|
$1,052.700
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$785.000
|
$1,052.700
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
1.000
|
$496.080
|
$897.600
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$87.300
|
$114.400
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$35.000
|
$41.800
|
$45.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
101,596.000
|
$0.500
|
$0.440
|
$0.440
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
61,811.000
|
$0.550
|
$0.440
|
$0.440
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
96,246.000
|
$0.500
|
$0.440
|
$0.440
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
277.000
|
$4.500
|
$5.500
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
254.000
|
$4.500
|
$5.500
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
510.000
|
$1.100
|
$4.400
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
510.000
|
$4.000
|
$4.400
|
$5.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
13,689.000
|
$0.500
|
$2.360
|
$1.500
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
2,322.000
|
$0.500
|
$2.360
|
$1.500
|
|
|
PAVEMENT SEALER 10"
|
LF
|
1,975.000
|
$0.720
|
$1.100
|
$1.100
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
1,975.000
|
$20.000
|
$8.800
|
$9.000
|
|
PREFAB PAV MRK TY C (W) (8") (DOT)
|
LF
|
1,067.000
|
$5.310
|
$4.950
|
$5.000
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
5,905.000
|
$5.500
|
$4.400
|
$4.400
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
625.000
|
$20.000
|
$14.850
|
$15.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
13.000
|
$215.000
|
$220.000
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$255.000
|
$275.000
|
$270.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
200.000
|
$45.000
|
$39.270
|
$40.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
627.000
|
$3.750
|
$3.960
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,132.000
|
$4.500
|
$3.630
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
715.000
|
$4.000
|
$3.960
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
72,996.000
|
$0.750
|
$0.720
|
$0.720
|
|
|
NO. OF WORKING DAYS
|
$/D
|
18,573.000
|
$79.000
|
$79.000
|
$69.000
|
|
|
SP MIXES SP-D PG76-22
|
TON
|
20,303.000
|
$150.000
|
$138.550
|
$165.000
|
|
|
TACK COAT
|
GAL
|
22,576.000
|
$4.000
|
$5.360
|
$4.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
11,357.000
|
$160.000
|
$180.170
|
$210.000
|
|
|
TACK COAT
|
GAL
|
10,327.000
|
$4.000
|
$6.200
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$12,526.590
|
$30,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
4,280.000
|
$5.000
|
$6.880
|
$7.000
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
35,150.000
|
$0.750
|
$0.790
|
$0.800
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
8,488.000
|
$0.750
|
$0.830
|
$0.800
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
47,198.000
|
$0.750
|
$0.790
|
$0.800
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
4,400.000
|
$0.630
|
$0.830
|
$0.800
|
|
|
TMA (STATIONARY)
|
DAY
|
79.000
|
$150.000
|
$462.370
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$200.000
|
$840.060
|
$300.000
|
|
Totals: |
$9,212,636.060
|
$9,089,429.450
|
$11,542,295.260
|