Job Info for 0218-03-087

County: CASS Highway: US 59 Date: 02/01/2023 (1 year ago) Engineer's Estimate: $9,212,636 Control Number: 0218-03-087
Project: C 218-3-87 District: ATLANTA Time: 0 X Type: REHABILITATE EXISTING FOUR LANE ROADWAY
HCS
Pay Estimates: 1 | 2 | 3 | 4
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $9,212,636.06
RK HALL, LLC   $9,089,429.45 1
-1.34% | -$123,206.61
EAST TEXAS BRIDGE, INC.   $11,542,295.26 2
25.29% | $2,329,659.20
26.99% | $2,452,865.81

Bid Items

Items: 61, 0 filtered
CASS US 59  |  ATLANTA  |  0218-03-087  |  02/01/2023  |  $9,212,636  |  C 218-3-87  |  REHAB EXIST FOUR LANE ROADWAY  |  0 X
Item code Description Unit Quantity Engineer's Estimate RK HALL, LLC EAST TEXAS BRIDGE, INC.
100 6002 PREPARING ROW STA 102.500 $3,000.000 $1,091.960 $8,000.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 456.000 $8.830 $19.050 $15.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 12.000 $40.000 $210.830 $100.000
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 66,831.000 $0.600 $0.580 $0.580
164 6071 BROADCAST SEED (TEMP)(WARM OR COOL) SY 66,831.000 $0.170 $0.100 $0.100
168 6001 VEGETATIVE WATERING MG 2,138.620 $10.000 $23.210 $12.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 12,776.000 $55.010 $57.700 $65.000
354 6065 PLANE ASPH CONC PAV (3 1/2") SY 164,701.000 $2.500 $3.140 $4.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 24.000 $600.000 $880.000 $600.000
500 6001 MOBILIZATION LS 1.000 $700,000.000 $454,471.470 $1,000,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $6,000.000 $21,680.540 $90,000.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 475.000 $3.500 $3.960 $5.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 475.000 $0.800 $0.110 $1.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 51,170.000 $0.500 $0.280 $0.500
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 375.000 $30.000 $23.470 $23.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 50.000 $45.000 $96.450 $92.000
540 6028 DOWNSTREAM ANCHOR TERMINAL SECT (TY IV) EA 2.000 $1,155.000 $1,540.000 $1,600.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 375.000 $3.000 $2.200 $3.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 2.000 $175.000 $440.000 $500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 $3,300.000 $3,001.900 $3,000.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 2.000 $275.000 $275.000 $300.000
636 6001 ALUMINUM SIGNS (TY A) SF 98.000 $30.000 $18.810 $21.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 2.000 $680.000 $1,052.700 $1,200.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 6.000 $785.000 $1,052.700 $1,200.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 1.000 $496.080 $897.600 $1,200.000
644 6076 REMOVE SM RD SN SUP&AM EA 7.000 $87.300 $114.400 $150.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 6.000 $35.000 $41.800 $45.000
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 101,596.000 $0.500 $0.440 $0.440
662 6035 WK ZN PAV MRK NON-REMOV (Y)6"(BRK) LF 61,811.000 $0.550 $0.440 $0.440
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 96,246.000 $0.500 $0.440 $0.440
662 6048 WK ZN PAV MRK REMOV (REFL) TY I-C EA 277.000 $4.500 $5.500 $5.500
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 254.000 $4.500 $5.500 $5.500
662 6057 WK ZN PAV MRK REMOV (TRAF BTN) TY W LF 510.000 $1.100 $4.400 $5.000
662 6058 WK ZN PAV MRK REMOV (TRAF BTN) TY Y EA 510.000 $4.000 $4.400 $5.000
662 6112 WK ZN PAV MRK SHT TERM RMV (W)(4") LF 13,689.000 $0.500 $2.360 $1.500
662 6113 WK ZN PAV MRK SHT TERM RMV (Y)(4") LF 2,322.000 $0.500 $2.360 $1.500
666 6227 PAVEMENT SEALER 10" LF 1,975.000 $0.720 $1.100 $1.100
668 6010 PREFAB PAV MRK TY B (W)(6")(BRK)CNTST LF 1,975.000 $20.000 $8.800 $9.000
668 6070 PREFAB PAV MRK TY C (W) (8") (DOT) LF 1,067.000 $5.310 $4.950 $5.000
668 6072 PREFAB PAV MRK TY C (W) (8") (SLD) LF 5,905.000 $5.500 $4.400 $4.400
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 625.000 $20.000 $14.850 $15.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 13.000 $215.000 $220.000 $220.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 2.000 $255.000 $275.000 $270.000
668 6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 200.000 $45.000 $39.270 $40.000
672 6007 REFL PAV MRKR TY I-C EA 627.000 $3.750 $3.960 $4.000
672 6009 REFL PAV MRKR TY II-A-A EA 1,132.000 $4.500 $3.630 $4.000
672 6010 REFL PAV MRKR TY II-C-R EA 715.000 $4.000 $3.960 $4.000
677 6002 ELIM EXT PAV MRK & MRKS (6") LF 72,996.000 $0.750 $0.720 $0.720
800 6001 NO. OF WORKING DAYS $/D 18,573.000 $79.000 $79.000 $69.000
3077 6064 SP MIXES SP-D PG76-22 TON 20,303.000 $150.000 $138.550 $165.000
3077 6075 TACK COAT GAL 22,576.000 $4.000 $5.360 $4.000
3080 6007 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 TON 11,357.000 $160.000 $180.170 $210.000
3080 6029 TACK COAT GAL 10,327.000 $4.000 $6.200 $4.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $12,000.000 $12,526.590 $30,000.000
6056 6002 PREFORMED CENTERLINE RUMBLE STRIP LF 4,280.000 $5.000 $6.880 $7.000
6149 6004 REFL PAV MRK AWT (W) 6" (SLD) (100MIL) LF 35,150.000 $0.750 $0.790 $0.800
6149 6005 REFL PAV MRK AWT (W) 6" (BRK) (100MIL) LF 8,488.000 $0.750 $0.830 $0.800
6149 6010 REFL PAV MRK AWT (Y) 6" (SLD) (100MIL) LF 47,198.000 $0.750 $0.790 $0.800
6149 6011 REFL PAV MRK AWT (Y) 6" (BRK) (100MIL) LF 4,400.000 $0.630 $0.830 $0.800
6185 6002 TMA (STATIONARY) DAY 79.000 $150.000 $462.370 $300.000
6185 6005 TMA (MOBILE OPERATION) DAY 10.000 $200.000 $840.060 $300.000
Totals: $9,212,636.06 $9,089,429.45 $11,542,295.26