PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
150.000
|
$100.000
|
$100.000
|
$150.000
|
$100.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
50.000
|
$1,000.000
|
$250.000
|
$500.000
|
$600.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
20.000
|
$1,500.000
|
$1,100.000
|
$1,000.000
|
$1,650.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
351.000
|
$30.000
|
$29.000
|
$10.000
|
$27.500
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-22")
|
SY
|
8,285.000
|
$6.000
|
$13.000
|
$10.000
|
$14.150
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,844.000
|
$15.000
|
$13.000
|
$20.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
23,095.000
|
$20.000
|
$20.000
|
$17.000
|
$20.000
|
|
|
BLADING
|
HR
|
8.000
|
$350.000
|
$310.000
|
$125.000
|
$322.580
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
AC
|
10.000
|
$900.000
|
$600.000
|
$1,000.000
|
$570.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
1,766.000
|
$2.000
|
$1.800
|
$5.000
|
$2.100
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR4)(12")
|
SY
|
7,052.000
|
$22.000
|
$33.000
|
$30.000
|
$42.000
|
|
|
CEMENT
|
TON
|
77.000
|
$190.000
|
$180.000
|
$200.000
|
$265.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
7,052.000
|
$3.000
|
$5.000
|
$10.000
|
$6.850
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,766.000
|
$5.000
|
$7.000
|
$10.000
|
$6.850
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
918.000
|
$3.750
|
$6.000
|
$10.000
|
$6.550
|
|
|
PLANE ASPH CONC PAV(4" TO 6")
|
SY
|
5,031.000
|
$10.000
|
$4.000
|
$2.500
|
$6.200
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
10,153.000
|
$4.000
|
$3.000
|
$2.000
|
$4.350
|
|
|
CEM STABIL BKFL
|
CY
|
624.000
|
$220.000
|
$200.000
|
$300.000
|
$195.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,346.000
|
$30.000
|
$50.000
|
$20.000
|
$33.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
320.000
|
$120.000
|
$60.000
|
$100.000
|
$67.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,785.000
|
$295.000
|
$170.000
|
$200.000
|
$195.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
150.800
|
$1,300.000
|
$1,300.000
|
$1,250.000
|
$1,120.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
94.800
|
$1,300.000
|
$1,400.000
|
$1,250.000
|
$1,320.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
60.700
|
$1,300.000
|
$1,000.000
|
$1,250.000
|
$1,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
32,760.000
|
$27.000
|
$28.000
|
$30.000
|
$25.350
|
|
|
APPROACH SLAB (HPC)
|
CY
|
167.200
|
$800.000
|
$900.000
|
$1,000.000
|
$700.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
5,268.000
|
$30.000
|
$47.000
|
$30.000
|
$25.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
5,016.000
|
$180.000
|
$146.000
|
$225.000
|
$184.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
194.000
|
$550.000
|
$540.000
|
$600.000
|
$630.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
470.000
|
$250.000
|
$190.000
|
$150.000
|
$200.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
1,388.000
|
$90.000
|
$96.000
|
$125.000
|
$99.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
206.000
|
$140.000
|
$180.000
|
$150.000
|
$210.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
54.000
|
$100.000
|
$120.000
|
$100.000
|
$115.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,250.000
|
$3,000.000
|
$4,000.000
|
$4,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$95,000.000
|
$140,000.000
|
$100,000.000
|
$140,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
1,252.000
|
$20.000
|
$4.000
|
$2.000
|
$6.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$620,000.000
|
$800,000.000
|
$825,000.000
|
$905,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$30,000.000
|
$12,500.000
|
$5,000.000
|
$20,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
300.000
|
$50.000
|
$47.000
|
$40.000
|
$40.800
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
300.000
|
$15.000
|
$21.000
|
$10.000
|
$11.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
5,666.000
|
$5.000
|
$5.000
|
$5.000
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,666.000
|
$3.000
|
$1.000
|
$1.000
|
$2.800
|
|
|
CONSTRUCTING DETOURS
|
SY
|
13,052.000
|
$80.000
|
$85.000
|
$75.000
|
$96.250
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
18.000
|
$3,500.000
|
$2,000.000
|
$4,000.000
|
$4,750.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
10,800.000
|
$15.000
|
$12.000
|
$30.000
|
$11.750
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
5,370.000
|
$10.000
|
$3.000
|
$10.000
|
$9.500
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
11,100.000
|
$15.000
|
$3.000
|
$10.000
|
$9.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
8,440.000
|
$0.200
|
$0.600
|
$0.750
|
$1.500
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
4,220.000
|
$0.300
|
$0.750
|
$0.750
|
$1.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,700.000
|
$30.000
|
$41.000
|
$30.000
|
$36.950
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,200.000
|
$2,650.000
|
$2,000.000
|
$2,800.000
|
|
|
MTL BM GD FEN TRANS (31"-28")(25')
|
EA
|
1.000
|
$1,000.000
|
$1,325.000
|
$1,500.000
|
$1,400.000
|
|
|
TL-3 31" SHORT RADIUS (COMPLETE)
|
EA
|
1.000
|
$5,000.000
|
$17,000.000
|
$20,000.000
|
$18,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,380.000
|
$4.000
|
$3.000
|
$5.000
|
$3.150
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,800.000
|
$3,450.000
|
$2,500.000
|
$3,640.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$350.000
|
$300.000
|
$500.000
|
$317.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,500.000
|
$1,350.000
|
$2,000.000
|
$2,640.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$1,500.000
|
$700.000
|
$1,000.000
|
$1,585.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
8.000
|
$22,000.000
|
$10,000.000
|
$8,000.000
|
$8,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
1,688.000
|
$24.000
|
$18.000
|
$20.000
|
$26.400
|
|
|
GATE (TY 1)
|
EA
|
2.000
|
$2,500.000
|
$1,800.000
|
$2,000.000
|
$2,100.000
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
152.000
|
$35.000
|
$47.000
|
$75.000
|
$31.650
|
|
|
CORNER OR PULL POST AM(REM/REP)(METAL)
|
EA
|
20.000
|
$250.000
|
$750.000
|
$800.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$900.000
|
$850.000
|
$1,000.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$1,000.000
|
$1,000.000
|
$1,250.000
|
$1,055.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
18.000
|
$120.000
|
$100.000
|
$100.000
|
$105.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
17.000
|
$20.000
|
$18.000
|
$75.000
|
$19.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
31.000
|
$20.000
|
$37.250
|
$75.000
|
$39.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
19.000
|
$120.000
|
$155.000
|
$150.000
|
$165.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
7.000
|
$150.000
|
$155.000
|
$150.000
|
$165.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
16,750.000
|
$1.000
|
$0.250
|
$0.400
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
8,419.000
|
$1.000
|
$0.250
|
$0.400
|
$0.260
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
32,325.000
|
$1.000
|
$0.850
|
$1.000
|
$0.900
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$10.000
|
$20.000
|
$25.000
|
$21.100
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
21,016.000
|
$1.000
|
$0.850
|
$1.000
|
$0.900
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,685.000
|
$0.500
|
$1.000
|
$1.500
|
$1.050
|
|
REFL PAV MRKR TY I-C
|
EA
|
65.000
|
$5.000
|
$8.000
|
$10.000
|
$8.450
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
207.000
|
$5.000
|
$8.000
|
$10.000
|
$8.450
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
39,442.000
|
$0.850
|
$0.750
|
$1.000
|
$0.800
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
2,376.000
|
$150.000
|
$135.000
|
$125.000
|
$153.000
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
2,625.000
|
$190.000
|
$140.000
|
$140.000
|
$150.000
|
|
|
TACK COAT
|
GAL
|
3,101.000
|
$5.000
|
$4.000
|
$10.000
|
$4.650
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
4.000
|
$375.000
|
$500.000
|
$1,000.000
|
$230.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$15,000.000
|
$15,000.000
|
$15,000.000
|
$19,800.000
|
|
|
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
|
LF
|
1,290.000
|
$0.800
|
$0.420
|
$0.500
|
$0.440
|
|
|
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
|
LF
|
17,515.000
|
$0.800
|
$0.420
|
$0.500
|
$0.440
|
|
|
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
|
LF
|
1,660.000
|
$0.800
|
$0.430
|
$0.500
|
$0.450
|
|
|
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
|
LF
|
9,625.000
|
$0.800
|
$0.430
|
$0.500
|
$0.450
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$200.000
|
$95.000
|
$400.000
|
$85.000
|
|
Totals: |
$8,924,620.700
|
$8,225,269.800
|
$8,723,531.600
|
$9,061,957.230
|