Job Info for 0169-05-041

County: CARSON Highway: US 60 Date: 02/06/2019 (5 years ago) Engineer's Estimate: $15,490,402 Control Number: 0169-05-041
Project: NH 2013(613) District: AMARILLO Time: 198 WORKING DAYS Type: REHAB EXISITNG ROADWAY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $15,490,402.35
RK HALL, LLC   $16,325,738.31 1
5.39% | $835,335.96
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY   $17,322,759.99 2
11.83% | $1,832,357.64
6.11% | $997,021.68
J. LEE MILLIGAN, INC.   $17,376,512.66 3
12.18% | $1,886,110.31
6.44% | $1,050,774.35
0.31% | $53,752.67

Bid Items

Items: 97, 0 filtered
CARSON US 60  |  AMARILLO  |  0169-05-041  |  02/06/2019  |  $15,490,402  |  NH 2013(613)  |  REHAB EXISITNG ROADWAY  |  198 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate RK HALL, LLC JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY J. LEE MILLIGAN, INC.
100 6001 PREPARING ROW AC 14.830 $350.000 $186.360 $1,900.000 $170.000
100 6002 PREPARING ROW STA 20.000 $5,500.000 $1,296.000 $7,900.000 $1,350.000
104 6001 REMOVING CONC (PAV) SY 3,634.000 $30.000 $16.320 $15.000 $12.150
104 6011 REMOVING CONC (MEDIANS) SY 646.000 $25.000 $24.240 $13.000 $13.200
104 6022 REMOVING CONC (CURB AND GUTTER) LF 3,198.000 $6.000 $9.670 $7.000 $5.300
104 6026 REMOVE CONC (GUTTER) LF 940.000 $9.500 $9.120 $7.000 $5.750
110 6001 EXCAVATION (ROADWAY) CY 4,042.000 $20.000 $14.770 $7.500 $25.600
132 6002 EMBANKMENT (FINAL)(DENS CONT)(TY A) CY 495.000 $25.000 $11.350 $10.000 $35.350
134 6001 BACKFILL (TY A) STA 645.960 $210.000 $163.720 $62.000 $210.000
164 6053 DRILL SEEDING (TEMP)(WARM OR COOL) AC 15.950 $440.000 $238.680 $230.000 $235.000
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 6,667.000 $0.850 $1.300 $1.500 $1.300
247 6228 FL BS (CMP IN PLC)(TY A OR B GR 4)(9") SY 3,634.000 $25.000 $13.070 $21.000 $18.700
247 6264 FL BS (CMP IN PLC)(TY A OR B GR4)(10") SY 1,748.000 $25.000 $38.720 $22.000 $41.550
251 6088 REWORK BS MTL (TY B)(15")(DEN CONT) SY 822.000 $5.000 $47.330 $6.000 $57.800
275 6001 CEMENT TON 243.000 $195.000 $183.020 $156.000 $156.000
275 6038 CEMENT TREAT (EXIST MATL)(DC)(8") SY 19,321.000 $4.000 $3.480 $2.500 $3.100
310 6005 PRIME COAT (AE-P) GAL 41,133.000 $3.600 $4.010 $4.000 $4.100
314 6014 EMULS ASPH (EROSN CONT)(MS-2) GAL 4,761.000 $3.800 $3.390 $4.000 $4.100
316 6001 ASPH (MULTI OPTION) GAL 53,826.000 $4.000 $3.000 $4.000 $2.750
316 6175 AGGR(TY-B GR-4 SAC-B) CY 1,287.000 $95.000 $108.670 $90.000 $81.550
341 6009 D-GR HMA TY-B PG64-28 TON 29,858.000 $85.000 $96.710 $85.000 $97.750
344 6051 SUPERPAVE MIXTURES SP-C SAC-A PG70-28 TON 58,774.000 $87.000 $97.420 $105.000 $103.400
351 6019 FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") SY 16,600.000 $22.000 $19.930 $24.000 $23.450
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 17,648.000 $3.000 $1.620 $1.900 $2.850
354 6044 PLANE ASPH CONC PAV (7") SY 5,315.000 $6.000 $3.780 $3.900 $8.350
354 6048 PLANE ASPH CONC PAV (3") SY 139,897.000 $3.000 $1.350 $1.700 $3.000
354 6049 PLANE ASPH CONC PAV (6") SY 16,338.000 $6.000 $3.780 $3.800 $6.400
360 6005 CONC PVMT (CONT REINF - CRCP) (11") SY 17,211.000 $73.000 $92.500 $85.000 $102.350
401 6001 FLOWABLE BACKFILL CY 3.000 $195.000 $240.740 $62.000 $315.000
432 6001 RIPRAP (CONC)(4 IN) CY 13.000 $525.000 $493.970 $900.000 $575.000
432 6044 RIPRAP (CONC)(FLUME) CY 3.000 $600.000 $578.010 $900.000 $845.000
500 6001 MOBILIZATION LS 1.000 $1,300,000.000 $1,080,000.000 $1,565,902.040 $1,545,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 9.000 $17,000.000 $25,355.420 $11,000.000 $18,350.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 600.000 $8.000 $3.350 $4.000 $8.250
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 600.000 $1.500 $1.080 $1.000 $1.950
529 6005 CONC CURB (MONO) (TY II) LF 2,450.000 $5.000 $3.020 $9.000 $11.000
529 6008 CONC CURB & GUTTER (TY II) LF 458.000 $20.000 $35.990 $20.000 $31.600
529 6030 CONC CURB & GUTTER (VALLEY GUTTER) LF 798.000 $40.000 $78.510 $44.000 $55.850
529 6032 CONCRETE GUTTER (MODIFIED) LF 2,960.000 $50.000 $34.050 $45.000 $51.100
533 6001 RUMBLE STRIPS (SHOULDER) LF 104,591.000 $0.160 $0.190 $0.140 $0.120
533 6002 RUMBLE STRIPS (CENTERLINE) LF 36,770.000 $0.200 $0.190 $0.140 $0.320
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 250.000 $28.000 $33.170 $30.000 $31.600
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000 $1,125.000 $1,382.190 $4,000.000 $1,315.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 700.000 $3.700 $4.420 $13.000 $4.200
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 3.000 $375.000 $442.300 $775.000 $420.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 $3,150.000 $3,427.830 $4,000.000 $3,265.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 3.000 $370.000 $442.300 $700.000 $420.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 24.000 $700.000 $884.600 $900.000 $840.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 10.000 $800.000 $1,022.820 $1,100.000 $975.000
644 6028 IN SM RD SN SUP&AM TYS80(1)SA(P-BM) EA 24.000 $900.000 $1,271.610 $1,250.000 $1,210.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 5.000 $1,000.000 $1,078.110 $1,100.000 $1,025.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 $1,200.000 $1,271.610 $1,350.000 $1,580.000
644 6076 REMOVE SM RD SN SUP&AM EA 54.000 $105.000 $110.580 $105.000 $105.000
658 6001 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA 10.000 $90.000 $149.280 $140.000 $142.000
658 6002 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI) EA 45.000 $140.000 $149.280 $140.000 $142.000
658 6036 INSTL DEL ASSM (D-DW)SZ 1(FLX)GND EA 199.000 $140.000 $149.280 $140.000 $142.000
658 6041 INSTL DEL ASSM (D-DY)SZ 1(FLX)GND EA 13.000 $140.000 $149.280 $140.000 $142.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 103.000 $120.000 $149.280 $140.000 $142.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 236.000 $12.000 $16.590 $20.000 $15.800
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 6.000 $30.000 $44.230 $25.000 $42.000
662 6001 WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF 2,903.000 $0.500 $0.140 $0.130 $0.140
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 71,602.000 $0.250 $0.140 $0.130 $0.140
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 282.000 $3.250 $2.700 $2.600 $2.650
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 2,686.000 $0.250 $0.140 $0.130 $0.140
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 86,756.000 $0.250 $0.140 $0.130 $0.140
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 1,870.000 $0.850 $0.970 $0.920 $0.950
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 282.000 $17.000 $10.800 $11.000 $10.550
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 1,870.000 $0.800 $0.970 $1.000 $0.950
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 9,353.000 $0.900 $0.910 $0.500 $1.150
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 7,814.000 $0.800 $0.910 $0.500 $1.200
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 12,384.000 $0.800 $0.760 $0.710 $0.740
666 6041 REFL PAV MRK TY I (W)12"(SLD)(090MIL) LF 554.000 $5.000 $3.780 $3.560 $3.700
666 6047 REFL PAV MRK TY I (W)24"(SLD)(090MIL) LF 276.000 $10.000 $7.560 $7.200 $7.400
666 6053 REFL PAV MRK TY I (W)(ARROW)(090MIL) EA 22.000 $150.000 $113.400 $110.000 $111.000
666 6077 REFL PAV MRK TY I (W)(WORD)(090MIL) EA 22.000 $225.000 $226.800 $214.000 $220.000
666 6092 REFL PAV MRK TY I (W)(RR XING)(090MIL) EA 7.000 $510.000 $486.000 $459.000 $474.000
666 6101 REF PAV MRK TY I(W)36"(YLD TRI)(090MIL) EA 90.000 $22.000 $27.000 $26.000 $26.350
666 6299 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 27,878.000 $0.340 $0.360 $0.400 $0.350
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 90,519.000 $0.340 $0.360 $0.400 $0.350
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 5,393.000 $0.340 $0.360 $0.400 $0.350
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 146,791.000 $0.340 $0.360 $0.400 $0.350
668 6005 PREFAB PAV MRK TY B (W)(4")(BRK)CNTST LF 935.000 $6.000 $23.760 $23.000 $23.200
672 6002 PLOWABLE REFL PAV MRKR TY I-C EA 48.000 $35.000 $48.600 $46.000 $47.450
672 6003 PLOWABLE REFL PAV MRKR TY II-A-A EA 96.000 $35.000 $48.600 $46.000 $47.450
672 6007 REFL PAV MRKR TY I-C EA 740.000 $3.000 $3.240 $3.100 $3.150
672 6009 REFL PAV MRKR TY II-A-A EA 1,028.000 $3.000 $3.240 $3.100 $3.150
672 6010 REFL PAV MRKR TY II-C-R EA 1,427.000 $3.500 $3.240 $3.100 $3.150
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 58,990.000 $1.000 $0.810 $1.000 $0.800
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 2,400.000 $0.800 $1.620 $1.900 $1.600
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 12.000 $3.000 $4.320 $4.200 $4.250
3003 6001 EMULSION GAL 460,260.000 $2.900 $3.500 $4.000 $2.600
3003 6005 CEMENT TON 587.000 $195.000 $183.020 $156.000 $156.000
3003 6008 EMUL TRTMNT(MX EXST MTRL & NEW BASE) 8" SY 139,897.000 $3.000 $2.470 $3.400 $2.700
3041 6001 UNDERSEAL COURSE GAL 52,725.000 $3.500 $4.770 $4.000 $3.100
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $17,000.000 $4,804.210 $18,000.000 $24,300.000
6185 6002 TMA (STATIONARY) DAY 198.000 $350.000 $384.220 $1,000.000 $665.000
6185 6003 TMA (MOBILE OPERATION) HR 780.000 $70.000 $65.960 $100.000 $66.500
Totals: $15,490,402.35 $16,325,738.33 $17,322,759.99 $17,376,512.66