Show Job Controls
Bid Cobra

CARSON US 60 (0169-03-036)

Items: 96

County: CARSON
Length: N/A
Highway: US 60
District: AMARILLO
Control Number: 0169-03-036
DBE Goal: N/A
Project: NH 2019(080)
Guaranty: N/A
Time: 162 WORKING DAYS
Engineer's Estimate: $17,852,193.07
Date: 10/03/2018 (7 years ago)
Contract Number: N/A
Type: EBL - FULL DEPTH REPAIR, MILL AND FILL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$17,852,193.07
1
$16,196,034.33
Over/Under Est: -9.28% -$1,656,158.74
$17,423,991.76
Over/Under Est: -2.4% -$428,201.31
Amt Left: 7.58% $1,227,957.43
$17,649,383.43
Over/Under Est: -1.14% -$202,809.64
Amt Left: 8.97% $1,453,349.10
Delta: -1.29% -$225,391.67
Over/Under Est: -0.63% -$113,256.64
Amt Left: 9.53% $1,542,902.10
Delta: -0.51% -$89,553.00
$17,779,297.98
Over/Under Est: -0.41% -$72,895.09
Amt Left: 9.78% $1,583,263.65
Delta: -0.23% -$40,361.55
Over/Under Est: 26.58% $4,745,933.97
Amt Left: 39.53% $6,402,092.71
Delta: -27.10% -$4,818,829.06

Bid Items & Bid Tabulations

96 Total 0 of 96
CARSON  |  US 60  |  AMARILLO  |  0169-03-036  |  10/03/2018  |  $17,852,193.07  |  NH 2019(080)  |  EBL - FULL DEPTH REPAIR, MILL AND FI...  |  162 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
J. LEE MILLIGAN, INC.
DUININCK, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
GILVIN-TERRILL, LTD.
ALLEN BUTLER CONSTRUCTION, INC.
PREPARING ROW
AC 33.800 $400.000 $159.350 $280.000 $100.000 $200.000 $400.000 $352.100
REMOVING CONC (RIPRAP)
SY 42.000 $13.000 $28.890 $58.000 $26.500 $41.110 $40.000 $31.760
REMOVING CONC (MISC)
SY 1.000 $17.000 $386.680 $430.000 $85.000 $284.450 $1,500.000 $689.600
REMOVING CONC (FLUME)
SY 245.000 $16.000 $19.010 $30.000 $22.500 $45.510 $40.000 $31.790
REMOVING STAB BASE AND ASPH PAV (7")
SY 360.000 $10.000 $12.360 $18.500 $12.000 $34.130 $100.000 $14.940
REMOVING STAB BASE & ASPH PAV (8"-12")
SY 601.000 $10.000 $9.270 $17.800 $16.500 $45.510 $40.000 $13.160
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 360.000 $22.000 $23.480 $39.000 $36.000 $40.360 $25.000 $44.210
BACKFILL (TY A)
STA 1,475.900 $175.000 $150.420 $207.000 $155.000 $200.000 $100.000 $115.150
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 33.800 $500.000 $406.850 $415.000 $420.000 $449.440 $400.000 $749.640
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 34.100 $500.000 $334.750 $345.000 $345.000 $369.790 $350.000 $624.700
PRIME COAT (MC-30)
GAL 53,247.000 $3.800 $3.370 $3.650 $3.900 $4.090 $3.350 $4.390
EMULS ASPH (EROSN CONT)(MULTI)
GAL 40,780.000 $3.000 $3.300 $3.150 $1.100 $4.020 $3.000 $4.320
ASPH (AC-10)
GAL 83,010.000 $2.800 $3.180 $2.700 $3.500 $2.960 $2.500 $3.160
AGGR(TY-B GR-4 SAC-B)
CY 1,938.000 $90.000 $84.970 $60.000 $91.500 $91.900 $80.000 $142.980
D-GR HMA TY-B PG64-22
TON 35,176.000 $80.000 $75.260 $79.350 $74.000 $65.000 $75.000 $102.220
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
TON 81,984.000 $85.000 $83.550 $86.000 $90.000 $83.000 $85.000 $109.950
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 10,250.000 $26.000 $17.160 $22.000 $23.000 $24.000 $15.000 $27.290
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13")
SY 2,185.000 $85.000 $182.950 $204.650 $310.000 $425.000 $100.000 $486.390
PLANE ASPH CONC PAV(0" TO 2")
SY 22,186.000 $1.500 $1.030 $1.900 $1.650 $2.000 $1.450 $0.940
PLANE ASPH CONC PAV (2")
SY 1,804.000 $4.000 $1.030 $3.000 $5.550 $3.410 $2.550 $4.690
PLANE ASPH CONC PAV (3")
SY 213,186.000 $2.750 $1.030 $1.550 $1.800 $1.390 $1.250 $0.690
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 3,941.000 $4.000 $1.030 $2.500 $2.650 $3.520 $1.520 $1.720
FULL - DEPTH REPAIR CRCP (10")
SY 2,359.000 $250.000 $172.010 $143.000 $180.000 $185.000 $150.000 $143.330
CL A CONC (MISC)
SY 1.000 $80.000 $618.000 $1,310.000 $1,100.000 $796.470 $600.000 $2,479.780
CL A CONC (FLUME)
CY 188.000 $1,000.000 $628.300 $475.000 $795.000 $426.680 $805.000 $379.380
CL C CONC (COLLAR)
EA 1.000 $1,500.000 $1,173.930 $3,180.000 $2,700.000 $3,082.620 $2,000.000 $4,051.620
CMP AR (GAL STL DES 5)
LF 4.000 $75.000 $234.790 $495.000 $265.000 $308.270 $560.000 $683.360
CONC BOX CULV (4 FT X 2 FT)
LF 4.000 $500.000 $1,409.000 $2,200.000 $690.000 $801.490 $1,850.000 $913.180
RC PIPE (CL III)(24 IN)
LF 20.000 $140.000 $116.620 $195.000 $210.000 $246.610 $150.000 $153.600
INLET (COMPL)(TY A)
EA 1.000 $5,000.000 $2,676.250 $5,665.000 $7,400.000 $9,557.620 $10,500.000 $8,037.640
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 1.000 $9,500.000 $2,618.100 $6,800.000 $6,900.000 $8,874.930 $7,500.000 $10,616.900
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)
EA 3.000 $8,800.000 $10,202.960 $14,000.000 $26,500.000 $34,134.350 $10,000.000 $10,011.400
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,500.000 $1,034.750 $3,200.000 $2,700.000 $3,413.430 $4,500.000 $2,881.490
ADJUSTING MANHOLES
EA 5.000 $1,000.000 $1,110.990 $1,700.000 $4,200.000 $5,415.980 $2,000.000 $1,275.970
REMOV STR (INLET)
EA 1.000 $2,100.000 $1,952.480 $1,800.000 $2,700.000 $3,413.430 $1,000.000 $1,334.050
REMOV STR (SET)
EA 4.000 $620.000 $1,952.470 $885.000 $2,100.000 $2,730.750 $1,000.000 $1,334.050
MOBILIZATION
LS 1.000 $1,400,000.000 $680,000.000 $1,385,000.000 $750,000.000 $1,070,107.900 $1,500,000.000 $2,256,688.850
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $12,000.000 $16,000.000 $16,450.000 $28,000.000 $30,000.000 $12,500.000 $13,356.650
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 40.000 $10.000 $10.300 $13.150 $8.500 $7.100 $10.000 $4.690
BIODEG EROSN CONT LOGS (REMOVE)
LF 40.000 $0.750 $3.090 $2.750 $2.100 $2.830 $5.000 $1.870
DRIVEWAYS (BASE)
SY 56.000 $20.000 $35.590 $38.200 $48.500 $100.000 $40.000 $88.810
RUMBLE STRIPS (SHOULDER)
LF 285,404.000 $0.150 $0.150 $0.170 $0.160 $0.150 $0.200 $0.140
MTL W-BEAM GD FEN (STEEL POST)
LF 1,200.000 $25.000 $27.760 $28.000 $28.000 $30.150 $25.000 $33.110
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,000.000 $1,178.420 $1,185.000 $1,200.000 $1,280.040 $1,100.000 $1,405.580
REMOVE METAL BEAM GUARD FENCE
LF 1,200.000 $3.000 $3.140 $3.150 $3.200 $3.410 $2.000 $5.730
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $320.000 $314.250 $315.000 $320.000 $341.340 $200.000 $533.080
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,300.000 $3,142.440 $3,160.000 $3,200.000 $3,413.430 $1,500.000 $3,748.220
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $300.000 $314.250 $315.000 $320.000 $341.340 $200.000 $533.080
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $775.000 $1,047.480 $1,055.000 $1,100.000 $1,137.810 $2,000.000 $1,249.410
CRASH CUSHION ATTEN (INSTALL)(REACT)(N)
EA 2.000 $21,000.000 $25,663.300 $25,815.000 $26,000.000 $27,876.380 $19,000.000 $30,610.450
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 115.000 $600.000 $837.990 $845.000 $530.000 $768.020 $410.000 $843.350
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 67.000 $900.000 $942.730 $950.000 $570.000 $810.120 $420.000 $889.580
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $900.000 $1,047.480 $1,055.000 $690.000 $933.010 $1,000.000 $1,024.510
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 41.000 $900.000 $1,047.480 $1,055.000 $765.000 $1,029.720 $650.000 $1,130.710
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $900.000 $1,152.230 $1,160.000 $810.000 $1,075.230 $750.000 $1,180.690
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 1.000 $900.000 $1,256.980 $1,265.000 $915.000 $1,251.590 $1,750.000 $1,374.350
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 16.000 $900.000 $1,256.980 $1,265.000 $900.000 $1,194.700 $830.000 $1,311.880
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 6.000 $1,005.000 $1,571.220 $1,580.000 $1,300.000 $1,615.690 $1,170.000 $1,774.160
REMOVE SM RD SN SUP&AM
EA 252.000 $105.000 $104.750 $105.000 $85.000 $113.780 $45.000 $88.850
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 91.000 $140.000 $141.410 $142.000 $155.000 $134.260 $120.000 $147.430
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 50.000 $140.000 $141.410 $142.000 $155.000 $134.260 $100.000 $147.430
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 6.000 $20.000 $20.950 $21.000 $21.000 $22.760 $30.000 $32.490
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 9.000 $140.000 $141.410 $142.000 $155.000 $134.260 $120.000 $147.430
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 15.000 $140.000 $141.410 $142.000 $155.000 $134.260 $130.000 $147.430
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 115.000 $140.000 $141.410 $142.000 $155.000 $134.260 $115.000 $147.430
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 174.000 $140.000 $141.410 $142.000 $155.000 $134.260 $120.000 $147.430
INSTL OM ASSM (OM-3R)(FLX)SRF
EA 1.000 $150.000 $392.800 $395.000 $310.000 $329.970 $580.000 $362.330
REMOVE DELIN & OBJECT MARKER ASSMS
EA 474.000 $10.000 $10.470 $10.500 $23.500 $11.380 $15.000 $18.740
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 13.000 $30.000 $41.900 $42.000 $42.500 $45.510 $45.000 $37.480
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 147,600.000 $0.300 $0.190 $0.190 $0.190 $0.200 $0.180 $0.220
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 73,800.000 $0.900 $0.190 $0.190 $0.190 $0.200 $0.180 $0.220
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,800.000 $1.200 $2.100 $0.950 $0.960 $1.020 $0.900 $1.120
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 9,149.000 $1.000 $0.830 $1.100 $1.050 $2.280 $1.000 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,065.000 $1.000 $0.830 $1.150 $1.050 $2.280 $1.000 $1.190
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 280.000 $0.450 $0.300 $0.310 $0.310 $0.330 $0.290 $0.360
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 3,657.000 $0.850 $0.580 $0.590 $0.590 $0.640 $0.560 $0.700
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 196.000 $1.500 $6.180 $6.320 $6.350 $6.830 $6.000 $7.500
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 200.000 $10.000 $12.360 $12.640 $12.500 $13.650 $12.000 $14.990
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 29.000 $200.000 $154.500 $158.040 $160.000 $170.670 $150.000 $187.410
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 4.000 $350.000 $257.500 $263.400 $265.000 $284.450 $250.000 $312.350
REFL PAV MRK TY I (W)(RR XING)(090MIL)
EA 1.000 $700.000 $515.000 $526.800 $530.000 $568.910 $500.000 $624.700
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 216.000 $25.000 $25.750 $26.340 $26.500 $28.450 $25.000 $31.240
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 92,955.000 $0.420 $0.300 $0.310 $0.310 $0.330 $0.290 $0.360
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 151,160.000 $0.420 $0.300 $0.310 $0.310 $0.330 $0.290 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,080.000 $0.420 $0.300 $0.310 $0.310 $0.330 $0.290 $0.360
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 160,306.000 $0.420 $0.300 $0.310 $0.310 $0.330 $0.290 $0.360
REFL PAV MRKR TY II-C-R
EA 5,086.000 $2.750 $3.090 $3.160 $3.200 $3.410 $3.000 $3.750
TREE REMOVAL (18" - 24" DIA)
EA 10.000 $900.000 $890.940 $1,025.000 $3,000.000 $1,706.720 $800.000 $1,962.820
EMULSION
GAL 701,382.000 $2.150 $2.480 $2.330 $2.400 $3.000 $3.800 $2.960
CEMENT
TON 895.000 $183.000 $162.000 $159.850 $160.000 $172.610 $145.000 $189.820
EMUL TRTMNT (MX EXST MTRL) 8"
SY 213,186.000 $3.200 $1.970 $2.300 $3.100 $2.000 $2.000 $3.520
UNDERSEAL COURSE
GAL 89,536.000 $4.000 $3.570 $2.700 $3.300 $3.500 $4.000 $4.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $17,500.000 $5,000.000 $22,400.000 $13,500.000 $23,434.580 $15,000.000 $8,121.140
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $3.000 $56.650 $58.000 $58.500 $62.580 $55.000 $21.240
TMA (STATIONARY)
DAY 162.000 $225.000 $350.000 $622.000 $255.000 $225.000 $765.000 $771.240
TMA (MOBILE OPERATION)
HR 680.000 $40.000 $60.000 $62.200 $95.500 $70.000 $95.000 $39.480
Totals: $17,852,193.070 $16,196,034.343 $17,423,991.760 $17,649,383.430 $17,738,936.441 $17,779,297.980 $22,598,127.047