Job Info for 6392-59-001

County: CAMERON Highway: IH0069E Date: 08/04/2022 (2 years ago) Engineer's Estimate: $651,350 Control Number: 6392-59-001
Project: BPM - 639259001 District: PHARR Time: 60 W Type: BRIDGE PREVENTATIVE MAINTENANCE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5
Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $651,350.00
SJ&J CONSTRUCTION, LLC   $777,430.00 1
19.36% | $126,080.00
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC   $952,265.00 2
46.2% | $300,915.00
22.49% | $174,835.00
SOUTHERN ROAD & BRIDGE, LLC   $1,228,895.00 3
88.67% | $577,545.00
58.07% | $451,465.00
29.05% | $276,630.00

Bid Items

Items: 19, 0 filtered
CAMERON IH0069E  |  PHARR  |  6392-59-001  |  08/04/2022  |  $651,350  |  BPM - 639259001  |  BRIDGE PREVENT MAINT  |  60 W
Item code Description Unit Quantity Engineer's Estimate SJ&J CONSTRUCTION, LLC BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC SOUTHERN ROAD & BRIDGE, LLC
100 6002 PREPARING ROW STA 3.000 $5,000.000 $1,000.000 $2,500.000 $10,000.000
104 6009 REMOVING CONC (RIPRAP) SY 223.000 $100.000 $25.000 $200.000 $250.000
400 6006 CUT & RESTORING PAV SY 34.000 $350.000 $150.000 $350.000 $650.000
401 6001 FLOWABLE BACKFILL CY 170.000 $260.000 $200.000 $300.000 $650.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 70.000 $700.000 $150.000 $250.000 $650.000
432 6002 RIPRAP (CONC)(5 IN) CY 500.000 $700.000 $1,000.000 $1,000.000 $850.000
432 6024 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 92.000 $200.000 $200.000 $500.000 $650.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 360.000 $50.000 $55.000 $75.000 $200.000
496 6007 REMOV STR (PIPE) LF 16.000 $500.000 $60.000 $500.000 $2,500.000
500 6001 MOBILIZATION LS 1.000 $20,000.000 $120,000.000 $150,000.000 $125,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $5,000.000 $7,000.000 $1,500.000 $25,000.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 895.000 $5.000 $4.000 $5.000 $6.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 895.000 $5.000 $1.000 $2.000 $5.000
658 6075 INSTL OM ASSM (OM-2Z)(FLX)SRF(BI) EA 8.000 $120.000 $110.000 $150.000 $250.000
658 6081 INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI) EA 44.000 $60.000 $110.000 $100.000 $100.000
4170 6011 BRIDGE BULKHEAD (TIMBER) EA 1.000 $25,000.000 $5,000.000 $55,000.000 $125,000.000
5088 6001 BIRD EXCLUSION METHOD SF 600.000 $40.000 $4.000 $25.000 $40.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $3,000.000 $10,000.000 $75.000 $500.000
6185 6002 TMA (STATIONARY) DAY 10.000 $1,200.000 $150.000 $225.000 $200.000
Totals: $651,350.00 $777,430.00 $952,265.00 $1,228,895.00