PREPARING ROW
|
STA
|
39.000
|
$2,600.000
|
$7,250.000
|
$7,300.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
164.000
|
$60.000
|
$50.000
|
$35.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
11,330.000
|
$13.000
|
$3.750
|
$3.000
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
22.000
|
$2,500.000
|
$150.000
|
$100.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,327.000
|
$12.000
|
$16.000
|
$5.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
18,438.000
|
$15.000
|
$19.000
|
$22.500
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
38,491.000
|
$3.000
|
$4.000
|
$1.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
36,570.000
|
$0.500
|
$0.400
|
$0.390
|
|
|
FERTILIZER
|
TON
|
1.800
|
$1,200.000
|
$750.000
|
$1,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
615.000
|
$65.000
|
$60.000
|
$35.000
|
|
|
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
|
CY
|
2,799.000
|
$75.000
|
$45.000
|
$61.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
12,200.000
|
$5.000
|
$6.000
|
$3.250
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
302.000
|
$350.000
|
$320.000
|
$200.000
|
|
|
CEMENT
|
TON
|
91.000
|
$250.000
|
$190.000
|
$215.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
12,110.000
|
$5.500
|
$3.500
|
$3.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,474.000
|
$6.500
|
$6.000
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
224.000
|
$120.000
|
$150.000
|
$100.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
690.000
|
$48.000
|
$1.000
|
$1.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
122.000
|
$160.000
|
$245.000
|
$80.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,134.000
|
$280.000
|
$275.000
|
$200.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
495.000
|
$320.000
|
$320.000
|
$300.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
2,445.000
|
$425.000
|
$330.000
|
$375.000
|
|
|
CL C CONC (ABUT)
|
CY
|
62.600
|
$1,500.000
|
$1,700.000
|
$1,800.000
|
|
|
CL C CONC (CAP)
|
CY
|
332.200
|
$1,700.000
|
$1,400.000
|
$1,600.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
207.400
|
$1,800.000
|
$1,300.000
|
$2,000.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
147.000
|
$1,200.000
|
$1,100.000
|
$1,100.000
|
|
|
REINF CONC SLAB
|
SF
|
43,700.000
|
$27.000
|
$27.000
|
$32.500
|
|
|
APPROACH SLAB
|
CY
|
70.600
|
$800.000
|
$900.000
|
$1,000.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
4,296.000
|
$230.000
|
$200.000
|
$240.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,374.000
|
$230.000
|
$200.000
|
$240.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
15.000
|
$200.000
|
$220.000
|
$500.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
366.000
|
$225.000
|
$205.000
|
$350.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
78.000
|
$600.000
|
$1,000.000
|
$750.000
|
|
|
RAIL (TY T223)
|
LF
|
1,960.000
|
$170.000
|
$145.000
|
$250.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
226.000
|
$225.000
|
$280.000
|
$250.000
|
|
|
RC PIPE (CL III)(72 IN)
|
LF
|
56.000
|
$600.000
|
$900.000
|
$700.000
|
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
92.000
|
$140.000
|
$130.000
|
$150.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$1,400.000
|
$1,300.000
|
$1,500.000
|
|
|
SET (TY II) (72 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$15,000.000
|
$25,000.000
|
$15,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,500.000
|
$5,000.000
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
25.000
|
$25.000
|
$15.000
|
$50.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$140,000.000
|
$75,000.000
|
$10,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
1,500.000
|
$9.000
|
$5.000
|
$5.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$810,280.700
|
$690,000.000
|
$875,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$3,000.000
|
$5,100.000
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
120.000
|
$40.000
|
$65.000
|
$48.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,975.000
|
$4.000
|
$4.500
|
$3.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
80.000
|
$80.000
|
$160.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,275.000
|
$32.000
|
$26.000
|
$25.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,300.000
|
$2,500.000
|
$2,450.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
825.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$250.000
|
$225.000
|
$225.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,400.000
|
$3,300.000
|
$3,265.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
16.000
|
$885.000
|
$800.000
|
$785.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$850.000
|
$900.000
|
$875.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$150.000
|
$200.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
14.000
|
$40.000
|
$35.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
20.000
|
$40.000
|
$25.000
|
$25.000
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
7,770.000
|
$0.200
|
$0.600
|
$0.600
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
50.000
|
$0.250
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
7,880.000
|
$0.200
|
$0.600
|
$0.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
95.000
|
$7.000
|
$7.500
|
$7.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
15,630.000
|
$0.700
|
$0.200
|
$0.200
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
46.000
|
$145.000
|
$160.000
|
$300.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
1,970.000
|
$145.000
|
$160.000
|
$175.000
|
|
Totals: |
$8,651,632.200
|
$7,945,428.500
|
$8,822,513.800
|