PREPARING ROW
|
STA
|
90.000
|
$3,000.000
|
$1,210.000
|
$6,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,505.000
|
$6.000
|
$5.000
|
$25.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1,108.000
|
$13.000
|
$6.000
|
$25.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
8,087.000
|
$14.000
|
$4.000
|
$20.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
8,664.000
|
$3.000
|
$3.000
|
$8.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
4,318.000
|
$8.000
|
$3.000
|
$8.000
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
255.000
|
$15.500
|
$10.000
|
$17.000
|
|
|
REMOVING CONC (COPING)
|
LF
|
78.000
|
$8.000
|
$54.000
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,511.000
|
$7.000
|
$18.000
|
$12.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
239.000
|
$40.000
|
$38.000
|
$40.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,155.000
|
$30.000
|
$18.000
|
$26.000
|
|
|
SPEC EXCAV WORK (FRONT-END LOADER)
|
HR
|
5.000
|
$200.000
|
$104.000
|
$75.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
74.000
|
$20.000
|
$60.000
|
$40.000
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
6,425.000
|
$1.500
|
$0.250
|
$0.200
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
6,425.000
|
$0.100
|
$0.200
|
$0.350
|
|
|
FERTILIZER
|
AC
|
2.000
|
$750.000
|
$475.000
|
$400.000
|
|
|
VEGETATIVE WATERING
|
MG
|
107.000
|
$12.000
|
$19.000
|
$65.000
|
|
|
IRRIGATION SYSTEM
|
LS
|
1.000
|
$18,000.000
|
$53,000.000
|
$65,000.000
|
|
|
PLANT MATERIAL (3-GAL)
|
EA
|
184.000
|
$25.000
|
$24.000
|
$25.000
|
|
|
PLANT MATERIAL (5-GAL)
|
EA
|
83.000
|
$35.000
|
$35.000
|
$30.000
|
|
|
PLANT BED PREPARATION
|
SY
|
321.000
|
$3.000
|
$9.350
|
$15.000
|
|
|
PLANT MATERIAL (30 GAL) (TREE)
|
EA
|
4.000
|
$300.000
|
$300.000
|
$450.000
|
|
|
PLANT MATERIAL (MIN 6' TRNK HT) (PALM)
|
EA
|
8.000
|
$500.000
|
$300.000
|
$425.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
570.000
|
$6.500
|
$20.000
|
$1.000
|
|
|
PROOF ROLLING
|
HR
|
4.000
|
$75.000
|
$60.000
|
$65.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
6,558.000
|
$65.000
|
$90.000
|
$54.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
15,014.000
|
$3.000
|
$3.000
|
$4.500
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
452.000
|
$160.000
|
$200.000
|
$200.000
|
|
|
CEMENT
|
TON
|
228.000
|
$165.000
|
$200.000
|
$175.000
|
|
|
CEMENT TREAT (NEW BASE) (16")
|
SY
|
14,785.000
|
$5.000
|
$4.000
|
$4.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,984.000
|
$4.000
|
$8.000
|
$4.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
8,190.000
|
$125.000
|
$125.000
|
$133.000
|
|
|
TACK COAT
|
GAL
|
6,704.000
|
$4.000
|
$5.000
|
$3.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
79,884.000
|
$2.000
|
$2.000
|
$1.750
|
|
|
CEM STABIL BKFL
|
CY
|
14.000
|
$80.000
|
$139.000
|
$77.000
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
4.000
|
$30.000
|
$67.000
|
$45.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
110.000
|
$3.000
|
$26.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
928.000
|
$25.000
|
$35.000
|
$1.000
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
480.000
|
$95.000
|
$140.000
|
$210.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
58.000
|
$400.000
|
$699.000
|
$650.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
26.000
|
$2,250.000
|
$1,300.000
|
$2,000.000
|
|
|
CL C CONC (COPING)
|
CY
|
4.000
|
$730.000
|
$1,465.000
|
$1.000
|
|
|
BRIDGE MEDIAN
|
SF
|
828.000
|
$10.000
|
$25.000
|
$14.000
|
|
|
SHEAR KEY
|
CY
|
22.000
|
$500.000
|
$405.000
|
$350.000
|
|
|
REINF CONC SLAB (BOX BEAM)(EXT SLAB)
|
SF
|
1,928.000
|
$20.000
|
$36.000
|
$25.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
608.000
|
$55.000
|
$130.000
|
$115.000
|
|
|
RET WALL (CAST IN PLACE)(SOUND WALL)
|
SF
|
4,365.000
|
$90.000
|
$57.000
|
$105.000
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
182.000
|
$200.000
|
$355.000
|
$190.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
182.000
|
$200.000
|
$355.000
|
$190.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
446.000
|
$52.000
|
$14.000
|
$15.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.000
|
$420.000
|
$935.000
|
$425.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
24.000
|
$400.000
|
$705.000
|
$425.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
76.000
|
$80.000
|
$93.000
|
$180.000
|
|
|
RC PIPE (CL III)(18 IN)(SPL)
|
LF
|
40.000
|
$35.000
|
$80.000
|
$40.000
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
3.000
|
$3,650.000
|
$3,500.000
|
$4,700.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
1.000
|
$4,300.000
|
$4,500.000
|
$4,900.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$1,250.000
|
$1,600.000
|
$2,700.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
6.000
|
$1,400.000
|
$1,000.000
|
$1,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$500.000
|
$520.000
|
$1,700.000
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$700.000
|
$900.000
|
$900.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,250.000
|
$2,100.000
|
$4,300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
65.000
|
$17.500
|
$26.000
|
$20.000
|
|
|
REMOVE STR (PILING)
|
LF
|
8.000
|
$675.000
|
$150.000
|
$40.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
152.000
|
$20.000
|
$51.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$561,826.480
|
$440,000.000
|
$625,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$7,000.000
|
$5,000.000
|
$7,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
100.000
|
$50.000
|
$40.000
|
$100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$14.000
|
$20.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
234.000
|
$35.000
|
$18.000
|
$36.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
234.000
|
$9.000
|
$15.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
100.000
|
$5.000
|
$3.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
100.000
|
$2.500
|
$1.000
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,510.000
|
$1.250
|
$0.850
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (6")
|
LF
|
1,510.000
|
$5.000
|
$3.500
|
$6.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
12,960.000
|
$35.000
|
$65.000
|
$32.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
400.000
|
$50.000
|
$8.000
|
$35.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
12,960.000
|
$10.000
|
$7.000
|
$7.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
400.000
|
$13.000
|
$8.000
|
$7.000
|
|
|
COLORED TEXTURED CONC (6")
|
SY
|
1,627.000
|
$70.000
|
$55.000
|
$105.000
|
|
|
CONC CURB & GUTTER (TY A)
|
LF
|
1,849.000
|
$18.000
|
$14.000
|
$14.000
|
|
|
CONC. CURB TY A (BARRIER)
|
LF
|
11,244.000
|
$10.000
|
$9.000
|
$9.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
7,530.000
|
$50.000
|
$40.000
|
$58.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
15.000
|
$2,000.000
|
$1,425.000
|
$2,900.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
4.000
|
$3,000.000
|
$2,100.000
|
$3,300.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
16.000
|
$1,850.000
|
$1,450.000
|
$3,600.000
|
|
|
CONC MEDIAN
|
SY
|
1,096.000
|
$125.000
|
$26.000
|
$60.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
150.000
|
$5.000
|
$23.000
|
$10.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$400.000
|
$590.000
|
$850.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
8.000
|
$225.000
|
$175.000
|
$450.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
2.000
|
$600.000
|
$665.000
|
$750.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
85.000
|
$12.000
|
$10.500
|
$25.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
725.000
|
$40.000
|
$11.850
|
$35.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
520.000
|
$1.000
|
$0.960
|
$2.100
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
185.000
|
$2.000
|
$2.100
|
$2.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
4,100.000
|
$0.400
|
$0.450
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,595.000
|
$0.250
|
$0.450
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
80.000
|
$0.950
|
$1.000
|
$1.800
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
3,675.000
|
$0.550
|
$0.950
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
20.000
|
$55.000
|
$50.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
20.000
|
$60.000
|
$55.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
13,525.000
|
$0.250
|
$0.450
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
376.000
|
$2.750
|
$4.000
|
$3.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
980.000
|
$0.500
|
$0.650
|
$1.250
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
134.000
|
$1.250
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,820.000
|
$1.000
|
$0.900
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
4,096.000
|
$3.500
|
$1.350
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,105.000
|
$5.500
|
$2.700
|
$3.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
7,267.000
|
$0.200
|
$0.220
|
$0.200
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
14,620.000
|
$0.200
|
$0.220
|
$0.200
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
134.000
|
$0.530
|
$0.450
|
$1.750
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
6,820.000
|
$0.400
|
$0.450
|
$0.500
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
2,670.000
|
$3.000
|
$0.650
|
$0.750
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
1,275.000
|
$2.700
|
$1.500
|
$1.500
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
13,390.000
|
$0.200
|
$0.220
|
$0.250
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
7,270.000
|
$0.500
|
$0.520
|
$0.550
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
14,620.000
|
$0.500
|
$0.520
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
13,390.000
|
$0.500
|
$0.520
|
$0.550
|
|
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
|
LF
|
80.000
|
$10.000
|
$10.000
|
$10.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
34.000
|
$200.000
|
$175.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
34.000
|
$280.000
|
$240.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W)(BIKE ARROW)
|
EA
|
13.000
|
$280.000
|
$75.000
|
$75.000
|
|
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
|
EA
|
13.000
|
$280.000
|
$200.000
|
$200.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
718.000
|
$3.500
|
$3.250
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
16,388.000
|
$0.450
|
$0.380
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,778.000
|
$0.800
|
$0.750
|
$0.800
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,374.000
|
$1.450
|
$1.500
|
$1.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
340.000
|
$3.000
|
$3.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
23.000
|
$55.000
|
$50.000
|
$50.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
17.000
|
$80.000
|
$50.000
|
$50.000
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE ARROW)
|
EA
|
10.000
|
$35.000
|
$15.000
|
$20.000
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
|
EA
|
20.000
|
$40.000
|
$20.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
280.000
|
$0.070
|
$0.100
|
$0.100
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
60.000
|
$200.000
|
$245.000
|
$245.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
16.000
|
$200.000
|
$245.000
|
$245.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
60.000
|
$200.000
|
$245.000
|
$245.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
16.000
|
$200.000
|
$245.000
|
$245.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
60.000
|
$200.000
|
$245.000
|
$245.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$200.000
|
$245.000
|
$245.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
42.000
|
$500.000
|
$625.000
|
$500.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
52.000
|
$100.000
|
$150.000
|
$78.000
|
|
|
BACK PLATE (12")(5 SEC)
|
EA
|
12.000
|
$120.000
|
$180.000
|
$95.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
8,445.000
|
$1.200
|
$1.100
|
$2.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
1,595.000
|
$1.800
|
$1.650
|
$2.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
785.000
|
$2.300
|
$1.900
|
$2.500
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')
|
EA
|
3.000
|
$20,000.000
|
$18,130.000
|
$22,000.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
42.000
|
$650.000
|
$725.000
|
$755.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
6.000
|
$3,250.000
|
$4,750.000
|
$3,900.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
100.000
|
$80.000
|
$84.000
|
$75.000
|
|
|
ANTI - GRAFFITI COATING(PERMNENT-TY II)
|
SF
|
8,730.000
|
$0.500
|
$1.500
|
$1.000
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
2,599.000
|
$80.000
|
$100.000
|
$118.000
|
|
|
TACK COAT
|
GAL
|
1,030.000
|
$3.890
|
$4.000
|
$3.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
15,014.000
|
$1.500
|
$4.000
|
$2.000
|
|
|
FLOATING TURBIDITY BARRIER(FUR & INST)
|
LF
|
60.000
|
$70.000
|
$78.000
|
$95.000
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
60.000
|
$15.000
|
$38.000
|
$25.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$12,000.000
|
$7,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
230.000
|
$120.000
|
$350.000
|
$25.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
230.000
|
$200.000
|
$450.000
|
$200.000
|
|
|
VIVDS PROSR SYS
|
EA
|
4.000
|
$7,500.000
|
$3,565.000
|
$5,000.000
|
|
|
VIVDS CAM ASSY VAR LNS
|
EA
|
9.000
|
$1,700.000
|
$1,224.000
|
$1,300.000
|
|
|
VIVDS CNTRL SOFTWARE
|
EA
|
4.000
|
$750.000
|
$270.000
|
$25.000
|
|
|
VIVDS CABLING
|
LF
|
1,945.000
|
$3.000
|
$2.450
|
$3.000
|
|
Totals: |
$6,181,411.250
|
$6,262,978.180
|
$6,958,887.500
|