Show Job Controls
Bid Cobra

CAMERON FM 802 (1140-02-038)

Items: 161

County: CAMERON
Length: N/A
Highway: FM 802
District: PHARR
Control Number: 1140-02-038
DBE Goal: N/A
Project: NH 2B20(157)
Guaranty: N/A
Time: 230 WORKING DAYS
Engineer's Estimate: $6,181,411.25
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: CONSTRUCT 6 LANE W/RAISED MEDIAN
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$6,181,411.25
$6,262,978.18
Over/Under Est: 1.32% $81,566.93
$6,958,887.50
Over/Under Est: 12.58% $777,476.25
Amt Left: 11.11% $695,909.32
Subcontractor Percentage Amount
TRAF-TEX, INC. 4.30% $299,017.41
HIGHWAY BARRICADES AND SERVICES, LLC 1.42% $98,745.28
EXTERIOR DESIGNS 1.17% $81,360.55
GREGORY PILE DRIVING, INC. 0.81% $56,326.54
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 0.75% $52,154.20
DUSTROL, INC. 0.63% $43,809.53
PURLITO, INC. 0.32% $22,252.46
MUNOZ FOUNDATION DRILLING, INC. 0.23% $15,993.95
HOUSTON SAWING & DRILLING 0.05% $3,476.95
G & E ESCOBEDO CONSTRUCTION, INC. 0.00% $0.00
Total: 9.68% $673,136.87

Bid Items & Bid Tabulations

161 Total 0 of 161
CAMERON  |  FM 802  |  PHARR  |  1140-02-038  |  08/06/2020  |  $6,181,411.25  |  NH 2B20(157)  |  CONSTRUCT 6 LANE W/RAISED MEDIAN  |  230 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS CORDIA CONSTRUCTION, LLC
FOREMOST PAVING, INC.
PREPARING ROW
STA 90.000 $3,000.000 $1,210.000 $6,000.000
REMOVING CONC (RIPRAP)
SY 1,505.000 $6.000 $5.000 $25.000
REMOVING CONC (MEDIANS)
SY 1,108.000 $13.000 $6.000 $25.000
REMOVING CONC (SIDEWALKS)
SY 8,087.000 $14.000 $4.000 $20.000
REMOVING CONC (CURB)
LF 8,664.000 $3.000 $3.000 $8.000
REMOVING CONC (CURB AND GUTTER)
LF 4,318.000 $8.000 $3.000 $8.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 255.000 $15.500 $10.000 $17.000
REMOVING CONC (COPING)
LF 78.000 $8.000 $54.000 $12.000
EXCAVATION (ROADWAY)
CY 1,511.000 $7.000 $18.000 $12.000
EXCAVATION (SPECIAL)
CY 239.000 $40.000 $38.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,155.000 $30.000 $18.000 $26.000
SPEC EXCAV WORK (FRONT-END LOADER)
HR 5.000 $200.000 $104.000 $75.000
FURNISHING AND PLACING TOPSOIL
CY 74.000 $20.000 $60.000 $40.000
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 6,425.000 $1.500 $0.250 $0.200
DRILL SEEDING (TEMP) (WARM)
SY 6,425.000 $0.100 $0.200 $0.350
FERTILIZER
AC 2.000 $750.000 $475.000 $400.000
VEGETATIVE WATERING
MG 107.000 $12.000 $19.000 $65.000
IRRIGATION SYSTEM
LS 1.000 $18,000.000 $53,000.000 $65,000.000
PLANT MATERIAL (3-GAL)
EA 184.000 $25.000 $24.000 $25.000
PLANT MATERIAL (5-GAL)
EA 83.000 $35.000 $35.000 $30.000
PLANT BED PREPARATION
SY 321.000 $3.000 $9.350 $15.000
PLANT MATERIAL (30 GAL) (TREE)
EA 4.000 $300.000 $300.000 $450.000
PLANT MATERIAL (MIN 6' TRNK HT) (PALM)
EA 8.000 $500.000 $300.000 $425.000
SPRINKLING (DUST CONTROL)
MG 570.000 $6.500 $20.000 $1.000
PROOF ROLLING
HR 4.000 $75.000 $60.000 $65.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 6,558.000 $65.000 $90.000 $54.000
LIME TRT (EXST MATL) (12")
SY 15,014.000 $3.000 $3.000 $4.500
LIME (HYD, COM OR QK)(SLURRY)
TON 452.000 $160.000 $200.000 $200.000
CEMENT
TON 228.000 $165.000 $200.000 $175.000
CEMENT TREAT (NEW BASE) (16")
SY 14,785.000 $5.000 $4.000 $4.500
PRIME COAT (MC-30)
GAL 2,984.000 $4.000 $8.000 $4.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 8,190.000 $125.000 $125.000 $133.000
TACK COAT
GAL 6,704.000 $4.000 $5.000 $3.000
PLANE ASPH CONC PAV (1.5")
SY 79,884.000 $2.000 $2.000 $1.750
CEM STABIL BKFL
CY 14.000 $80.000 $139.000 $77.000
STRUCT EXCAV (SPECIAL)
CY 4.000 $30.000 $67.000 $45.000
TRENCH EXCAVATION PROTECTION
LF 110.000 $3.000 $26.000 $10.000
TEMPORARY SPL SHORING
SF 928.000 $25.000 $35.000 $1.000
PRESTR CONC PIL (16 IN SQ)
LF 480.000 $95.000 $140.000 $210.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 58.000 $400.000 $699.000 $650.000
CL C CONC (ABUT)(EXTEND)
CY 26.000 $2,250.000 $1,300.000 $2,000.000
CL C CONC (COPING)
CY 4.000 $730.000 $1,465.000 $1.000
BRIDGE MEDIAN
SF 828.000 $10.000 $25.000 $14.000
SHEAR KEY
CY 22.000 $500.000 $405.000 $350.000
REINF CONC SLAB (BOX BEAM)(EXT SLAB)
SF 1,928.000 $20.000 $36.000 $25.000
RETAINING WALL (MSE)
SF 608.000 $55.000 $130.000 $115.000
RET WALL (CAST IN PLACE)(SOUND WALL)
SF 4,365.000 $90.000 $57.000 $105.000
PRESTR CONC BOX BEAM (4B20)
LF 182.000 $200.000 $355.000 $190.000
PRESTR CONC BOX BEAM (5B20)
LF 182.000 $200.000 $355.000 $190.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 446.000 $52.000 $14.000 $15.000
RIPRAP (CONC)(4 IN)
CY 2.000 $420.000 $935.000 $425.000
RIPRAP (MOW STRIP)(4 IN)
CY 24.000 $400.000 $705.000 $425.000
ARMOR JOINT (SEALED)
LF 76.000 $80.000 $93.000 $180.000
RC PIPE (CL III)(18 IN)(SPL)
LF 40.000 $35.000 $80.000 $40.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 3.000 $3,650.000 $3,500.000 $4,700.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 1.000 $4,300.000 $4,500.000 $4,900.000
ADJUSTING MANHOLES
EA 1.000 $1,250.000 $1,600.000 $2,700.000
ADJUSTING INLET (CAP)
EA 6.000 $1,400.000 $1,000.000 $1,300.000
CLEAN EXIST CULVERTS
EA 11.000 $500.000 $520.000 $1,700.000
REMOV STR (INLET)
EA 4.000 $700.000 $900.000 $900.000
REMOV STR (WINGWALL)
EA 4.000 $1,250.000 $2,100.000 $4,300.000
REMOV STR (PIPE)
LF 65.000 $17.500 $26.000 $20.000
REMOVE STR (PILING)
LF 8.000 $675.000 $150.000 $40.000
REMOVE STR (RAIL)
LF 152.000 $20.000 $51.000 $100.000
MOBILIZATION
LS 1.000 $561,826.480 $440,000.000 $625,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $7,000.000 $5,000.000 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 100.000 $50.000 $40.000 $100.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $14.000 $20.000 $40.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 234.000 $35.000 $18.000 $36.000
CONSTRUCTION EXITS (REMOVE)
SY 234.000 $9.000 $15.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 100.000 $5.000 $3.000 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 100.000 $2.500 $1.000 $3.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,510.000 $1.250 $0.850 $1.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 1,510.000 $5.000 $3.500 $6.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 12,960.000 $35.000 $65.000 $32.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 400.000 $50.000 $8.000 $35.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 12,960.000 $10.000 $7.000 $7.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 400.000 $13.000 $8.000 $7.000
COLORED TEXTURED CONC (6")
SY 1,627.000 $70.000 $55.000 $105.000
CONC CURB & GUTTER (TY A)
LF 1,849.000 $18.000 $14.000 $14.000
CONC. CURB TY A (BARRIER)
LF 11,244.000 $10.000 $9.000 $9.000
CONC SIDEWALKS (4")
SY 7,530.000 $50.000 $40.000 $58.000
CURB RAMPS (TY 1)
EA 15.000 $2,000.000 $1,425.000 $2,900.000
CURB RAMPS (TY 5)
EA 4.000 $3,000.000 $2,100.000 $3,300.000
CURB RAMPS (TY 10)
EA 16.000 $1,850.000 $1,450.000 $3,600.000
CONC MEDIAN
SY 1,096.000 $125.000 $26.000 $60.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $5.000 $23.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $400.000 $590.000 $850.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 8.000 $225.000 $175.000 $450.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 2.000 $600.000 $665.000 $750.000
CONDT (PVC) (SCH 40) (4")
LF 85.000 $12.000 $10.500 $25.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 725.000 $40.000 $11.850 $35.000
ELEC CONDR (NO.8) BARE
LF 520.000 $1.000 $0.960 $2.100
TRAY CABLE (4 CONDR) (12 AWG)
LF 185.000 $2.000 $2.100 $2.200
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 4,100.000 $0.400 $0.450 $0.450
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,595.000 $0.250 $0.450 $0.450
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 80.000 $0.950 $1.000 $1.800
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,675.000 $0.550 $0.950 $1.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 20.000 $55.000 $50.000 $60.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 20.000 $60.000 $55.000 $60.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 13,525.000 $0.250 $0.450 $0.400
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 376.000 $2.750 $4.000 $3.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 980.000 $0.500 $0.650 $1.250
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 134.000 $1.250 $2.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,820.000 $1.000 $0.900 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 4,096.000 $3.500 $1.350 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,105.000 $5.500 $2.700 $3.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 7,267.000 $0.200 $0.220 $0.200
REFL PAV MRK TY II (W) 4" (SLD)
LF 14,620.000 $0.200 $0.220 $0.200
REFL PAV MRK TY II (W) 8" (DOT)
LF 134.000 $0.530 $0.450 $1.750
REFL PAV MRK TY II (W) 8" (SLD)
LF 6,820.000 $0.400 $0.450 $0.500
REFL PAV MRK TY II (W) 12" (SLD)
LF 2,670.000 $3.000 $0.650 $0.750
REFL PAV MRK TY II (W) 24" (SLD)
LF 1,275.000 $2.700 $1.500 $1.500
REFL PAV MRK TY II (Y) 4" (SLD)
LF 13,390.000 $0.200 $0.220 $0.250
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 7,270.000 $0.500 $0.520 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 14,620.000 $0.500 $0.520 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 13,390.000 $0.500 $0.520 $0.550
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
LF 80.000 $10.000 $10.000 $10.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 34.000 $200.000 $175.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 34.000 $280.000 $240.000 $250.000
PREFAB PAV MRK TY C (W)(BIKE ARROW)
EA 13.000 $280.000 $75.000 $75.000
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
EA 13.000 $280.000 $200.000 $200.000
REFL PAV MRKR TY II-C-R
EA 718.000 $3.500 $3.250 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 16,388.000 $0.450 $0.380 $0.400
ELIM EXT PAV MRK & MRKS (8")
LF 2,778.000 $0.800 $0.750 $0.800
ELIM EXT PAV MRK & MRKS (12")
LF 1,374.000 $1.450 $1.500 $1.500
ELIM EXT PAV MRK & MRKS (24")
LF 340.000 $3.000 $3.000 $3.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 23.000 $55.000 $50.000 $50.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 17.000 $80.000 $50.000 $50.000
ELIM EXT PAV MRK & MARKS (BIKE ARROW)
EA 10.000 $35.000 $15.000 $20.000
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
EA 20.000 $40.000 $20.000 $20.000
PAV SURF PREP FOR MRK (4")
LF 280.000 $0.070 $0.100 $0.100
VEH SIG SEC (12")LED(GRN)
EA 60.000 $200.000 $245.000 $245.000
VEH SIG SEC (12")LED(GRN ARW)
EA 16.000 $200.000 $245.000 $245.000
VEH SIG SEC (12")LED(YEL)
EA 60.000 $200.000 $245.000 $245.000
VEH SIG SEC (12")LED(YEL ARW)
EA 16.000 $200.000 $245.000 $245.000
VEH SIG SEC (12")LED(RED)
EA 60.000 $200.000 $245.000 $245.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $200.000 $245.000 $245.000
PED SIG SEC (LED)(COUNTDOWN)
EA 42.000 $500.000 $625.000 $500.000
BACK PLATE (12")(3 SEC)
EA 52.000 $100.000 $150.000 $78.000
BACK PLATE (12")(5 SEC)
EA 12.000 $120.000 $180.000 $95.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 8,445.000 $1.200 $1.100 $2.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 1,595.000 $1.800 $1.650 $2.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 785.000 $2.300 $1.900 $2.500
INS TRF SIG PL AM(S)1 ARM(65')
EA 3.000 $20,000.000 $18,130.000 $22,000.000
PED DETECT PUSH BUTTON (APS)
EA 42.000 $650.000 $725.000 $755.000
PED DETECTOR CONTROLLER UNIT
EA 6.000 $3,250.000 $4,750.000 $3,900.000
POTHOLE REPAIR (STANDARD)
SY 100.000 $80.000 $84.000 $75.000
ANTI - GRAFFITI COATING(PERMNENT-TY II)
SF 8,730.000 $0.500 $1.500 $1.000
D-GR HMA TY-B SAC-B PG64-22
TON 2,599.000 $80.000 $100.000 $118.000
TACK COAT
GAL 1,030.000 $3.890 $4.000 $3.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 15,014.000 $1.500 $4.000 $2.000
FLOATING TURBIDITY BARRIER(FUR & INST)
LF 60.000 $70.000 $78.000 $95.000
FLOATING TURBIDITY BARRIER (REMOVE)
LF 60.000 $15.000 $38.000 $25.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $12,000.000 $7,500.000
TMA (STATIONARY)
DAY 230.000 $120.000 $350.000 $25.000
TMA (MOBILE OPERATION)
DAY 230.000 $200.000 $450.000 $200.000
VIVDS PROSR SYS
EA 4.000 $7,500.000 $3,565.000 $5,000.000
VIVDS CAM ASSY VAR LNS
EA 9.000 $1,700.000 $1,224.000 $1,300.000
VIVDS CNTRL SOFTWARE
EA 4.000 $750.000 $270.000 $25.000
VIVDS CABLING
LF 1,945.000 $3.000 $2.450 $3.000
Totals: $6,181,411.250 $6,262,978.180 $6,958,887.500