|
|
PREPARING ROW
|
STA
|
242.000
|
$4,800.000
|
$2,500.000
|
$2,350.000
|
$2,100.000
|
$500.000
|
$5,250.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
843.000
|
$20.000
|
$25.000
|
$20.000
|
$12.000
|
$25.000
|
$17.070
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
342.000
|
$10.000
|
$25.000
|
$36.000
|
$11.000
|
$50.000
|
$30.960
|
|
|
RMV (7"-11") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,850.000
|
$11.250
|
$10.000
|
$4.250
|
$9.000
|
$30.000
|
$7.610
|
|
|
EXCAV (ROADWAY)
|
CY
|
39,310.000
|
$11.000
|
$8.000
|
$8.700
|
$12.000
|
$22.000
|
$13.870
|
|
|
EXCAV (CHANNEL)
|
CY
|
2,000.000
|
$18.000
|
$15.000
|
$20.000
|
$8.000
|
$25.000
|
$14.240
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
205.000
|
$20.000
|
$20.000
|
$25.000
|
$12.000
|
$60.000
|
$17.800
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
4,005.000
|
$28.000
|
$5.000
|
$12.000
|
$4.000
|
$35.000
|
$13.840
|
|
|
BACKFILL (TY A)
|
STA
|
242.000
|
$260.000
|
$250.000
|
$255.000
|
$416.000
|
$150.000
|
$783.810
|
|
|
FURN & PLACE TOPSOIL (VEH)
|
CY
|
50.000
|
$20.000
|
$50.000
|
$30.000
|
$125.000
|
$175.000
|
$45.000
|
|
|
HYDRO MULCH SEED (PERM_RURAL_CLAY)
|
SY
|
115,360.000
|
$0.500
|
$0.450
|
$0.500
|
$0.450
|
$0.450
|
$0.520
|
|
|
HYDRO MULCH SEED (TEMP_WARM)
|
SY
|
115,360.000
|
$0.420
|
$0.400
|
$0.450
|
$0.400
|
$0.400
|
$0.440
|
|
|
VEGETATIVE WATERING
|
TGL
|
2,104.000
|
$28.000
|
$29.000
|
$30.000
|
$20.000
|
$16.000
|
$26.750
|
|
|
SPRINKLING (DUST CONTROL)
|
TGL
|
968.000
|
$12.000
|
$1.000
|
$1.000
|
$30.000
|
$24.000
|
$21.740
|
|
|
PROOF ROLLING
|
HR
|
5.000
|
$75.000
|
$100.000
|
$80.000
|
$60.000
|
$100.000
|
$68.130
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
|
CY
|
22,293.000
|
$40.000
|
$65.000
|
$46.500
|
$80.000
|
$80.000
|
$69.520
|
|
|
GEOGRID BASE REINFORCEMENT (TYPE 2)
|
SY
|
112,551.000
|
$1.250
|
$1.500
|
$1.350
|
$3.000
|
$1.250
|
$1.470
|
|
|
REWORK BS MTL (TY B)(8")(DC)(ORG POS)
|
CY
|
15,520.000
|
$7.200
|
$11.000
|
$7.500
|
$5.000
|
$45.000
|
$8.540
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
3,446.000
|
$300.000
|
$220.000
|
$260.000
|
$335.000
|
$350.000
|
$285.780
|
|
|
LIME TRT (EXIST MATL)(12")
|
SY
|
116,052.000
|
$3.500
|
$2.800
|
$3.600
|
$3.000
|
$5.000
|
$4.460
|
|
|
CEMENT
|
TON
|
1,246.000
|
$230.000
|
$205.000
|
$220.000
|
$175.000
|
$250.000
|
$264.990
|
|
|
CEMENT TRT (EXIST MATL & NEW BASE)(12")
|
SY
|
110,776.000
|
$3.900
|
$2.750
|
$4.000
|
$3.000
|
$3.000
|
$6.200
|
|
|
SALV, HAUL & STKPL RCL APH PV (3 1/2")
|
SY
|
105,010.000
|
$5.000
|
$2.000
|
$4.250
|
$3.000
|
$1.500
|
$2.360
|
|
|
PRIME COAT (MC-30)
|
GAL
|
21,439.000
|
$5.900
|
$5.000
|
$5.000
|
$6.000
|
$6.000
|
$5.570
|
|
|
ASPH (TIER II)
|
GAL
|
32,158.000
|
$5.800
|
$5.000
|
$7.000
|
$5.000
|
$4.000
|
$10.890
|
|
|
AGGR (TY-B GR-4P SAC-B)
|
CY
|
860.000
|
$141.000
|
$100.000
|
$82.000
|
$197.000
|
$225.000
|
$248.680
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
18,484.000
|
$126.000
|
$145.000
|
$124.000
|
$140.000
|
$145.000
|
$165.000
|
|
|
PLANE & TEXT ASPH CONC PAV(1.5")
|
SY
|
1,868.000
|
$2.400
|
$10.000
|
$15.000
|
$4.000
|
$5.000
|
$3.610
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,301.000
|
$3.350
|
$5.000
|
$1.000
|
$7.000
|
$6.000
|
$9.670
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
295.000
|
$550.000
|
$600.000
|
$800.000
|
$750.000
|
$450.000
|
$691.330
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
97.000
|
$1,200.000
|
$1,153.310
|
$1,300.000
|
$1,200.000
|
$900.000
|
$1,447.440
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,880.000
|
$80.000
|
$93.430
|
$120.000
|
$70.000
|
$100.000
|
$75.650
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,144.000
|
$100.000
|
$147.230
|
$280.000
|
$84.000
|
$115.000
|
$99.270
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
272.000
|
$80.000
|
$145.630
|
$240.000
|
$77.000
|
$105.000
|
$102.390
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
207.000
|
$100.000
|
$147.400
|
$320.000
|
$93.000
|
$125.000
|
$126.090
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
312.000
|
$120.000
|
$156.000
|
$340.000
|
$136.000
|
$150.000
|
$154.190
|
|
|
RC PIPE (CL IV)(42 IN)
|
LF
|
312.000
|
$160.000
|
$269.910
|
$500.000
|
$226.000
|
$250.000
|
$285.170
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$9,500.000
|
$8,019.970
|
$11,000.000
|
$7,440.000
|
$6,000.000
|
$6,745.580
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
4.000
|
$10,500.000
|
$16,229.680
|
$8,000.000
|
$23,500.000
|
$16,000.000
|
$9,305.030
|
|
|
HEADWALL (CH - FW - 0) (DIA= 42 IN)
|
EA
|
6.000
|
$15,500.000
|
$17,581.680
|
$11,000.000
|
$23,470.000
|
$20,000.000
|
$10,837.100
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
4.000
|
$15,000.000
|
$27,621.830
|
$11,000.000
|
$30,030.000
|
$25,000.000
|
$9,103.420
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,100.000
|
$1,796.910
|
$1,200.000
|
$1,270.000
|
$1,200.000
|
$1,412.840
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,250.000
|
$2,012.670
|
$1,250.000
|
$1,450.000
|
$1,200.000
|
$1,420.310
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
154.000
|
$1,300.000
|
$1,268.890
|
$1,450.000
|
$1,460.000
|
$1,200.000
|
$1,530.920
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$1,750.000
|
$1,853.530
|
$1,580.000
|
$1,390.000
|
$2,000.000
|
$1,730.360
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
40.000
|
$1,850.000
|
$1,998.470
|
$2,100.000
|
$1,670.000
|
$2,000.000
|
$2,031.060
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$3,500.000
|
$7,500.000
|
$7,000.000
|
$6,060.000
|
$4,500.000
|
$3,737.780
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,500.000
|
$1,000.000
|
$2,000.000
|
$3,000.000
|
$1,000.000
|
$421.160
|
|
|
REMOV STR (SET)
|
EA
|
178.000
|
$500.000
|
$250.000
|
$640.000
|
$427.000
|
$1,000.000
|
$214.610
|
|
|
REMOV STR (WINGWALL)
|
EA
|
12.000
|
$2,000.000
|
$2,750.000
|
$900.000
|
$2,280.000
|
$1,000.000
|
$413.450
|
|
|
REMOV STR (HEADWALL)
|
EA
|
9.000
|
$1,800.000
|
$3,000.000
|
$1,100.000
|
$2,710.000
|
$1,000.000
|
$422.620
|
|
|
REMOV STR (PIPE)
|
LF
|
5,377.000
|
$20.000
|
$10.000
|
$50.000
|
$6.000
|
$6.000
|
$11.640
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,200,000.000
|
$1,250,000.000
|
$950,000.000
|
$1,050,000.000
|
$1,400,000.000
|
$1,399,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$8,000.000
|
$3,500.000
|
$5,800.000
|
$4,630.000
|
$5,000.000
|
$14,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$9,800.000
|
$10,000.000
|
$5,000.000
|
$46.000
|
$25,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
320.000
|
$180.000
|
$1.000
|
$65.000
|
$26.000
|
$325.000
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$230.000
|
$100.000
|
$0.010
|
$33.000
|
$325.000
|
$585.240
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
468.000
|
$32.000
|
$44.140
|
$24.000
|
$25.000
|
$25.000
|
$70.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
468.000
|
$10.000
|
$8.680
|
$12.000
|
$13.000
|
$10.000
|
$22.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
200.000
|
$3.750
|
$7.000
|
$7.500
|
$7.000
|
$7.000
|
$8.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
200.000
|
$1.100
|
$2.000
|
$2.500
|
$2.000
|
$2.000
|
$2.510
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
5,420.000
|
$4.700
|
$5.500
|
$6.000
|
$6.000
|
$6.000
|
$8.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,420.000
|
$1.350
|
$1.250
|
$1.500
|
$1.000
|
$2.000
|
$1.320
|
|
|
CONSTRUCTING DETOURS
|
SY
|
436.000
|
$60.000
|
$85.000
|
$100.000
|
$70.000
|
$175.000
|
$65.520
|
|
|
DRIVEWAYS (CONC)
|
SY
|
370.000
|
$100.000
|
$100.000
|
$85.000
|
$108.000
|
$100.000
|
$94.280
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,730.000
|
$50.000
|
$65.000
|
$60.000
|
$36.000
|
$80.000
|
$66.500
|
|
|
TURNOUTS (ACP)
|
SY
|
3,184.000
|
$100.000
|
$85.000
|
$80.000
|
$80.000
|
$70.000
|
$106.290
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
47.000
|
$500.000
|
$285.000
|
$300.000
|
$499.000
|
$325.000
|
$318.550
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$720.000
|
$695.000
|
$850.000
|
$1,580.000
|
$775.000
|
$885.450
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
70.000
|
$32.000
|
$22.000
|
$30.000
|
$20.000
|
$25.000
|
$24.300
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
35.000
|
$800.000
|
$835.000
|
$700.000
|
$900.000
|
$950.000
|
$728.880
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
11.000
|
$980.000
|
$985.000
|
$850.000
|
$921.000
|
$1,000.000
|
$901.650
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,100.000
|
$1,350.000
|
$1,050.000
|
$1,210.000
|
$1,400.000
|
$1,090.620
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
49.000
|
$110.000
|
$75.000
|
$120.000
|
$114.000
|
$100.000
|
$86.390
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
26.000
|
$96.000
|
$85.000
|
$65.000
|
$70.000
|
$100.000
|
$66.950
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
16.000
|
$21.000
|
$20.000
|
$120.000
|
$15.000
|
$25.000
|
$16.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
131.000
|
$10.500
|
$16.000
|
$17.000
|
$16.000
|
$16.000
|
$4.470
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,300.000
|
$4.500
|
$0.950
|
$1.000
|
$1.000
|
$1.000
|
$4.420
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
62,706.000
|
$0.650
|
$0.320
|
$0.330
|
$0.320
|
$0.350
|
$0.880
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
63,506.000
|
$0.850
|
$0.320
|
$0.330
|
$0.320
|
$0.350
|
$0.890
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
10.000
|
$1.000
|
$84.920
|
$1.250
|
$5.000
|
$10.000
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
6,571.000
|
$1.000
|
$1.920
|
$1.250
|
$5.000
|
$3.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
355.000
|
$1.150
|
$1.200
|
$1.250
|
$1.000
|
$1.250
|
$2.510
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
215.000
|
$8.750
|
$16.000
|
$16.000
|
$16.000
|
$16.000
|
$5.520
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
345.000
|
$5.250
|
$8.000
|
$8.000
|
$8.000
|
$8.000
|
$3.140
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
47,566.000
|
$1.100
|
$0.940
|
$1.000
|
$1.000
|
$1.000
|
$2.120
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
5,040.000
|
$1.700
|
$0.820
|
$0.900
|
$1.000
|
$0.800
|
$1.410
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
11,252.000
|
$0.850
|
$0.820
|
$0.900
|
$1.000
|
$0.800
|
$1.100
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
2.000
|
$230.000
|
$200.000
|
$200.000
|
$200.000
|
$200.000
|
$263.880
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
2.000
|
$300.000
|
$300.000
|
$300.000
|
$300.000
|
$300.000
|
$350.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
10.000
|
$4.150
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$4.420
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
651.000
|
$4.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$4.420
|
|
TRAFFIC BUTTON TY Y
|
EA
|
1,388.000
|
$2.900
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
$4.200
|
|
TRAFFIC BUTTON TY B
|
EA
|
7,705.000
|
$2.200
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
$4.200
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
29,488.000
|
$0.400
|
$0.450
|
$0.500
|
$0.450
|
$0.500
|
$0.420
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
140.000
|
$0.850
|
$0.600
|
$0.600
|
$1.000
|
$0.750
|
$0.500
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
12.000
|
$4.250
|
$10.000
|
$10.000
|
$10.000
|
$12.000
|
$1.210
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
2.000
|
$65.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$51.900
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
1.000
|
$68.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$56.310
|
|
|
PRSSR IRRIG PVC PIPE (18")
|
LF
|
297.000
|
$250.000
|
$175.000
|
$250.000
|
$160.000
|
$250.000
|
$132.680
|
|
|
PRSSR IRRIG PVC PIPE (24")
|
LF
|
175.000
|
$480.000
|
$200.000
|
$300.000
|
$274.000
|
$275.000
|
$152.860
|
|
|
PRSSR IRRIG PVC PIPE (30")
|
LF
|
80.000
|
$550.000
|
$250.000
|
$500.000
|
$294.000
|
$325.000
|
$197.480
|
|
|
BONDING COURSE
|
GAL
|
7,605.000
|
$4.500
|
$4.000
|
$3.000
|
$8.000
|
$5.000
|
$7.420
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
367.000
|
$120.000
|
$125.000
|
$80.000
|
$118.000
|
$100.000
|
$108.230
|
|
|
CUT & RESTORING PAV
|
SY
|
607.000
|
$110.000
|
$95.000
|
$170.000
|
$100.000
|
$350.000
|
$136.110
|
|
|
CEM STABIL BKFL
|
CY
|
473.000
|
$120.000
|
$115.000
|
$100.000
|
$105.000
|
$100.000
|
$78.560
|
|
|
WELDED STL CASING PIPE (OPEN CUT)(24")
|
LF
|
251.000
|
$300.000
|
$250.000
|
$290.000
|
$255.000
|
$500.000
|
$111.750
|
|
|
WELDED STL CASING PIPE (OPEN CUT)(30")
|
LF
|
152.000
|
$350.000
|
$350.000
|
$370.000
|
$370.000
|
$525.000
|
$128.740
|
|
|
WELDED STL CASING PIPE (OPEN CUT)(42")
|
LF
|
72.000
|
$400.000
|
$500.000
|
$600.000
|
$647.000
|
$600.000
|
$168.060
|
|
Totals: |
$13,126,017.350
|
$12,411,801.560
|
$12,668,335.610
|
$13,079,030.440
|
$14,992,674.300
|
$15,512,132.400
|