Job Info for 0921-06-348

County: CAMERON Highway: VA Date: 05/03/2024 (6 months ago) Engineer's Estimate: $2,423,195 Control Number: 0921-06-348
Project: STP 2B23(202)TAPS District: PHARR Time: 160 WORKING DAYS Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,423,194.50
TEXAS CORDIA CONSTRUCTION, LLC   $2,002,875.00 1
-17.35% | -$420,319.50
3LW CIVIL LLC   $2,207,508.69 2
-8.9% | -$215,685.81
10.22% | $204,633.69
STX CIVIL   $2,281,958.50 3
-5.83% | -$141,236.00
13.93% | $279,083.50
3.37% | $74,449.81
GO UNDERGROUND, LIMITED LIABILITY COMPANY   $2,943,243.00 4
21.46% | $520,048.50
46.95% | $940,368.00
28.98% | $661,284.50
TI-ZACK CONCRETE, LLC   $2,954,388.52 5
21.92% | $531,194.02
47.51% | $951,513.52
0.38% | $11,145.52
ENCINO LANDSCAPE, INC.   $3,081,072.80 6
27.15% | $657,878.30
53.83% | $1,078,197.80
4.29% | $126,684.28
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 4.35% $87,125.06
SOIL TECH ADVANCE INC. 3.73% $74,707.24
Total: 8.08% $161,832.30

Bid Items

Items: 88, 0 filtered
CAMERON VA  |  PHARR  |  0921-06-348  |  05/03/2024  |  $2,423,195  |  STP 2B23(202)TAPS  |  BICYCLE AND PEDESTRIAN IMPRVS  |  160 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TEXAS CORDIA CONSTRUCTION, LLC 3LW CIVIL LLC STX CIVIL GO UNDERGROUND, LIMITED LIABILITY COMPANY TI-ZACK CONCRETE, LLC ENCINO LANDSCAPE, INC.
100 6001 PREPARING ROW AC 1.000 $10,000.000 $5,000.000 $7,000.000 $17,000.000 $120,000.000 $27,500.000 $20,000.000
104 6009 REMOVING CONC (RIPRAP) SY 5.000 $20.000 $200.000 $20.000 $25.000 $800.000 $63.840 $50.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 962.000 $25.000 $11.000 $25.000 $20.000 $27.000 $33.181 $50.000
104 6029 REMOVING CONC (CURB OR CURB & GUTTER) LF 3,743.000 $15.000 $4.000 $12.500 $10.000 $4.000 $8.528 $50.000
105 6037 REMOVING STAB BASE AND ASPH PAV(0"-16") SY 837.000 $18.000 $12.000 $20.000 $15.000 $26.000 $22.882 $50.000
110 6002 EXCAVATION (CHANNEL) CY 23.400 $35.000 $94.000 $40.000 $20.000 $200.000 $136.410 $50.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 416.800 $100.000 $50.000 $40.000 $30.000 $25.000 $45.950 $50.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 8,560.000 $5.000 $4.000 $4.500 $4.000 $8.000 $5.346 $30.000
162 6002 BLOCK SODDING SY 8,560.000 $7.000 $9.000 $7.000 $10.000 $9.800 $7.700 $5.000
168 6001 VEGETATIVE WATERING MG 145.200 $50.000 $40.000 $100.000 $230.000 $84.000 $1.100 $4.000
351 6006 FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") SY 197.000 $75.000 $116.000 $250.000 $100.000 $104.000 $137.500 $200.000
420 6071 CL C CONC (COLLAR) EA 3.000 $700.000 $4,532.000 $650.000 $1,000.000 $2,500.000 $4,950.000 $1,500.000
420 6074 CL C CONC (MISC) CY 5.500 $700.000 $1,946.000 $750.000 $550.000 $1,000.000 $986.513 $1,500.000
432 6003 RIPRAP (CONC)(6 IN) CY 1.800 $740.000 $1,583.000 $650.000 $1,000.000 $1,000.000 $986.513 $1,500.000
464 6001 RC PIPE (CL III)(12 IN) LF 449.000 $100.000 $83.000 $95.000 $110.000 $90.000 $137.775 $100.000
464 6005 RC PIPE (CL III)(24 IN) LF 12.000 $130.000 $266.000 $205.000 $130.000 $200.000 $163.405 $200.000
465 6074 INLET (COMPL)(PSL)(RC)(5FTX5FT) EA 1.000 $10,000.000 $4,820.000 $9,500.000 $9,000.000 $4,900.000 $9,410.500 $2,500.000
467 6323 SET (TY II) (12 IN) (RCP) (4: 1) (C) EA 8.000 $1,400.000 $1,838.000 $1,225.000 $2,200.000 $1,800.000 $2,040.500 $2,500.000
471 6003 GRATE & FRAME EA 19.000 $1,800.000 $3,307.000 $2,100.000 $2,200.000 $4,700.000 $3,058.125 $3,000.000
479 6001 ADJUSTING MANHOLES EA 4.000 $2,000.000 $4,167.000 $1,500.000 $1,200.000 $4,200.000 $79.800 $1,000.000
479 6005 ADJUSTING MANHOLES (WATER VALVE BOX) EA 3.000 $1,000.000 $2,393.000 $1,200.000 $800.000 $3,800.000 $65.056 $500.000
496 6002 REMOV STR (INLET) EA 1.000 $1,250.000 $1,428.000 $700.000 $700.000 $1,200.000 $935.000 $1,500.000
496 6004 REMOV STR (SET) EA 10.000 $1,290.000 $320.000 $450.000 $500.000 $650.000 $935.000 $500.000
496 6007 REMOV STR (PIPE) LF 260.000 $20.000 $23.000 $25.000 $20.000 $12.000 $27.500 $10.000
500 6001 MOBILIZATION LS 1.000 $216,000.000 $180,000.000 $191,000.000 $170,000.000 $123,000.000 $326,298.341 $260,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 $5,000.000 $3,000.000 $8,500.000 $3,000.000 $4,800.000 $2,750.000 $4,000.000
506 6035 SANDBAGS FOR EROSION CONTROL EA 59.000 $10.000 $10.000 $0.100 $26.000 $11.200 $0.110 $5.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 4,529.000 $9.000 $5.000 $0.100 $9.000 $8.000 $0.110 $10.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 4,529.000 $3.000 $1.000 $0.100 $3.000 $1.000 $0.110 $1.000
529 6002 CONC CURB (TY II) LF 203.000 $30.000 $60.000 $28.000 $30.000 $33.000 $58.148 $30.000
529 6007 CONC CURB & GUTTER (TY I) LF 89.000 $31.000 $55.000 $32.500 $40.000 $33.000 $58.148 $40.000
529 6008 CONC CURB & GUTTER (TY II) LF 4,549.000 $40.000 $25.000 $32.500 $40.000 $30.000 $58.148 $40.000
529 6012 CONC CURB (SLOTTED) LF 12.000 $45.000 $275.000 $45.000 $40.000 $1,200.000 $53.303 $50.000
529 6020 CONC CURB & GUTTER (ARMOR CURB) LF 14.000 $385.000 $575.000 $396.600 $160.000 $1,200.000 $1,066.056 $500.000
530 6004 DRIVEWAYS (CONC) SY 1,812.000 $100.000 $100.000 $88.000 $84.000 $128.840 $136.542 $100.000
531 6001 CONC SIDEWALKS (4") SY 8,995.000 $90.000 $78.000 $78.000 $85.000 $128.370 $134.358 $80.000
531 6018 CURB RAMPS (TY 1) SY 99.000 $165.000 $165.000 $185.190 $145.000 $203.820 $145.608 $200.000
531 6019 CURB RAMPS (TY 2) SY 16.000 $165.000 $130.000 $185.190 $145.000 $226.910 $145.608 $200.000
531 6020 CURB RAMPS (TY 3) SY 138.000 $165.000 $100.000 $185.190 $145.000 $226.910 $145.608 $200.000
531 6023 CURB RAMPS (TY 6) SY 62.000 $165.000 $160.000 $185.190 $145.000 $226.910 $145.608 $200.000
531 6024 CURB RAMPS (TY 7) SY 312.000 $165.000 $90.000 $185.190 $145.000 $376.910 $141.564 $200.000
531 6027 CURB RAMPS (TY 10) SY 35.000 $165.000 $150.000 $185.190 $145.000 $176.910 $141.564 $200.000
531 6033 CONC SIDEWALKS (SPECIAL) (TYPE B) SY 81.000 $200.000 $250.000 $350.000 $115.000 $276.910 $330.153 $200.000
550 6003 CHAIN LINK FENCE (REMOVE) LF 10.000 $50.000 $17.000 $25.000 $20.000 $50.000 $11.000 $20.000
560 6025 RELOCATE EXISTING MAILBOX EA 3.000 $400.000 $900.000 $425.000 $150.000 $800.000 $165.000 $200.000
618 6023 CONDT (PVC) (SCH 40) (2") LF 180.000 $20.000 $45.000 $22.000 $74.000 $16.200 $68.200 $4.000
620 6009 ELEC CONDR (NO.6) BARE LF 205.000 $2.300 $2.000 $2.750 $3.000 $2.590 $2.860 $4.000
624 6009 GROUND BOX TY D (162922) EA 4.000 $1,200.000 $1,650.000 $1,320.000 $2,140.000 $1,242.000 $1,980.000 $800.000
624 6010 GROUND BOX TY D (162922)W/APRON EA 4.000 $1,000.000 $1,319.000 $1,650.000 $3,500.000 $1,566.000 $3,245.000 $1,000.000
624 6028 REMOVE GROUND BOX EA 4.000 $55.000 $381.000 $495.000 $416.000 $378.000 $385.000 $500.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 2.000 $800.000 $940.000 $650.000 $900.000 $812.000 $275.000 $500.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 23.000 $900.000 $991.000 $750.000 $900.000 $879.200 $275.000 $500.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 10.000 $650.000 $425.000 $450.000 $325.000 $924.000 $275.000 $300.000
644 6070 RELOCATE SM RD SN SUP&AM TY S80 EA 15.000 $700.000 $422.000 $475.000 $350.000 $980.000 $275.000 $300.000
666 6018 REFL PAV MRK TY I (W)6"(DOT)(100MIL) LF 286.000 $1.000 $1.000 $1.320 $1.500 $1.300 $1.320 $4.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 1,732.000 $10.000 $12.000 $13.200 $14.500 $12.960 $13.200 $8.000
666 6225 PAVEMENT SEALER 6" LF 23,780.000 $1.000 $0.360 $0.400 $0.500 $0.390 $0.396 $4.000
666 6230 PAVEMENT SEALER 24" LF 1,732.000 $5.000 $1.000 $0.970 $1.000 $0.950 $0.968 $8.000
666 6231 PAVEMENT SEALER (ARROW) EA 21.000 $60.000 $85.000 $93.500 $101.000 $91.800 $93.500 $60.000
666 6232 PAVEMENT SEALER (WORD) EA 4.000 $60.000 $85.000 $93.500 $101.000 $91.800 $93.500 $60.000
666 6245 PAVEMENT SEALER (BIKE SYMBOL) EA 16.000 $65.000 $85.000 $93.500 $101.000 $91.800 $93.500 $60.000
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 23,494.000 $1.000 $1.000 $1.010 $1.500 $0.990 $1.012 $3.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 21.000 $250.000 $225.000 $247.500 $270.000 $243.000 $247.500 $60.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 4.000 $300.000 $300.000 $330.000 $360.000 $324.000 $330.000 $60.000
668 6096 PREFAB PAV MRK TY C (W)(BIKE SYMBOL) EA 16.000 $250.000 $275.000 $302.500 $330.000 $297.000 $302.500 $60.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 10,328.000 $1.000 $0.850 $0.940 $1.000 $0.920 $0.935 $2.000
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 1,061.000 $2.000 $0.950 $1.050 $1.000 $1.030 $1.045 $8.000
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 266.000 $5.000 $10.000 $11.000 $12.000 $10.800 $11.000 $12.000
677 6008 ELIM EXT PAV MRK & MRKS (ARROW) EA 5.000 $50.000 $125.000 $137.500 $150.000 $135.000 $137.500 $50.000
677 6012 ELIM EXT PAV MRK & MRKS (WORD) EA 4.000 $75.000 $125.000 $137.500 $150.000 $135.000 $137.500 $50.000
678 6002 PAV SURF PREP FOR MRK (6") LF 23,393.000 $1.000 $0.250 $0.260 $0.500 $0.260 $0.264 $2.000
678 6008 PAV SURF PREP FOR MRK (24") LF 1,732.000 $3.000 $0.850 $0.880 $1.000 $0.860 $0.880 $4.000
682 6018 PED SIG SEC (LED)(COUNTDOWN) EA 8.000 $600.000 $557.000 $990.000 $1,150.000 $720.900 $1,056.000 $5,000.000
684 6009 TRF SIG CBL (TY A)(12 AWG)(4 CONDR) LF 1,889.000 $3.000 $2.000 $3.300 $5.000 $2.700 $3.300 $10.000
684 6079 TRF SIG CBL (TY C)(12 AWG)(2 CONDR) LF 1,769.000 $2.000 $2.000 $2.750 $5.000 $2.270 $2.860 $10.000
687 6001 PED POLE ASSEMBLY EA 8.000 $3,500.000 $2,512.000 $3,850.000 $4,800.000 $2,700.000 $4,400.000 $8,000.000
688 6001 PED DETECT PUSH BUTTON (APS) EA 8.000 $850.000 $934.000 $1,100.000 $1,200.000 $955.800 $1,100.000 $3,000.000
688 6003 PED DETECTOR CONTROLLER UNIT EA 1.000 $4,000.000 $2,391.000 $3,850.000 $4,500.000 $3,780.000 $4,070.000 $10,000.000
688 6004 VEH LP DETECT (SAWCUT) LF 2,726.000 $15.000 $15.000 $22.000 $15.000 $13.500 $13.750 $10.000
690 6024 REMOVAL OF SIGNAL HEAD ASSM EA 8.000 $200.000 $133.000 $275.000 $145.000 $253.800 $132.000 $4,000.000
690 6030 REMOVAL OF PEDESTRIAN PUSH BUTTONS EA 8.000 $50.000 $69.000 $137.500 $70.000 $91.800 $66.000 $1,000.000
752 6005 TREE REMOVAL (4" - 12" DIA) EA 2.000 $1,500.000 $1,200.000 $1,250.000 $1,000.000 $2,800.000 $1,210.000 $500.000
1002 6026 LANDSCAPE AMENITY (BENCH) EA 2.000 $5,000.000 $3,800.000 $2,000.000 $1,800.000 $6,800.000 $1,375.000 $10,000.000
3076 6072 D-GR HMA TY-D PG 76-22 (EXEMPT) TON 16.000 $153.000 $400.000 $325.000 $400.000 $32.000 $330.000 $200.000
5145 6001 GATE (INSTALL)(TYPE 1)(OTU) EA 1.000 $447.000 $950.000 $5,000.000 $450.000 $18,000.000 $1,650.000 $2,500.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 320.000 $155.000 $8.000 $125.000 $75.000 $52.000 $1.100 $100.000
6185 6002 TMA (STATIONARY) DAY 160.000 $200.000 $10.000 $125.000 $265.000 $350.000 $1.100 $300.000
6185 6005 TMA (MOBILE OPERATION) DAY 2.000 $250.000 $50.000 $125.000 $285.000 $500.000 $1.100 $300.000
Totals: $2,423,194.50 $2,002,875.00 $2,207,508.69 $2,281,958.50 $2,943,243.00 $2,954,388.63 $3,081,072.80