Job Info for 0921-06-306

County: CAMERON Highway: CS Date: 01/05/2023 (1 year ago) Engineer's Estimate: $1,492,418 Control Number: 0921-06-306
Project: BR 2023(387) District: PHARR Time: 234 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Revision | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,492,417.77
LUCANIA CONSTRUCTION LLC   $1,753,094.18 1
17.47% | $260,676.41
FOREMOST PAVING, INC.   $1,881,581.89 2
26.08% | $389,164.12
7.33% | $128,487.71
TEXAS CORDIA CONSTRUCTION, LLC   $2,218,722.86 3
48.67% | $726,305.09
26.56% | $465,628.68
17.92% | $337,140.97
Subcontractor Percentage Amount
GREGORY PILE DRIVING, INC. 7.78% $136,390.73
PATMO SERVICES, L.L.C. 3.70% $64,864.48
TEXAS HIGHWAY SYSTEMS, INC. 1.29% $22,614.91
ASAGO, LLC 1.01% $17,706.25
PAVEMENT MARKINGS INC. 0.58% $10,167.95
Total: 14.36% $251,744.32

Bid Items

Items: 77, 0 filtered
CAMERON CS  |  PHARR  |  0921-06-306  |  01/05/2023  |  $1,492,418  |  BR 2023(387)  |  BRIDGE REPL  |  234 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate LUCANIA CONSTRUCTION LLC FOREMOST PAVING, INC. TEXAS CORDIA CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 7.270 $2,500.000 $4,000.000 $4,200.000 $2,000.000
104 6001 REMOVING CONC (PAV) SY 600.000 $20.000 $40.000 $20.000 $12.000
104 6009 REMOVING CONC (RIPRAP) SY 75.000 $11.000 $15.000 $20.000 $50.000
104 6022 REMOVING CONC (CURB AND GUTTER) LF 700.000 $6.000 $10.000 $7.000 $12.000
105 6037 REMOVING STAB BASE AND ASPH PAV(0"-16") SY 1,247.000 $5.000 $40.000 $11.000 $20.000
110 6001 EXCAVATION (ROADWAY) CY 1,401.230 $11.040 $11.000 $15.000 $22.000
110 6002 EXCAVATION (CHANNEL) CY 90.000 $30.000 $80.000 $50.000 $45.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 394.000 $20.000 $20.000 $45.000 $40.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 560.610 $12.000 $20.000 $50.000 $40.000
134 6001 BACKFILL (TY A) STA 3.770 $160.000 $4,500.000 $2,000.000 $1,740.000
150 6001 BLADING STA 7.270 $500.000 $400.000 $600.000 $790.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 294.000 $0.750 $6.000 $12.000 $16.000
160 6005 FURNISHING AND PLACING TOPSOIL CY 150.000 $60.000 $50.000 $95.000 $73.000
164 6027 CELL FBR MLCH SEED(PERM)(URBAN)(CLAY) SY 294.000 $0.450 $3.000 $2.500 $3.000
164 6029 CELL FBR MLCH SEED(TEMP)(WARM) SY 294.000 $0.400 $3.000 $2.500 $3.000
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 1,790.000 $0.500 $0.600 $0.500 $1.000
164 6041 DRILL SEEDING (TEMP) (WARM) SY 1,790.000 $0.200 $0.600 $0.500 $1.000
168 6001 VEGETATIVE WATERING MG 147.430 $35.000 $40.000 $3.000 $20.000
169 6006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY 1,790.000 $2.000 $3.200 $2.650 $3.000
247 6060 FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS) CY 506.000 $85.000 $100.000 $56.000 $65.000
247 6236 FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS) CY 356.000 $85.000 $170.000 $110.000 $180.000
275 6001 CEMENT TON 29.000 $200.000 $250.000 $215.000 $300.000
275 6046 CEMENT TREAT (NEW BASE)(11") SY 2,812.000 $5.000 $12.000 $15.500 $3.000
310 6009 PRIME COAT (MC-30) GAL 550.000 $6.000 $12.000 $9.000 $8.000
400 6005 CEM STABIL BKFL CY 185.000 $105.000 $150.000 $150.000 $100.000
409 6001 PRESTR CONC PIL (16 IN SQ) LF 518.000 $160.000 $180.000 $225.000 $200.000
416 6002 DRILL SHAFT (24 IN) LF 336.000 $250.000 $300.000 $350.000 $300.000
420 6013 CL C CONC (ABUT) CY 56.600 $950.000 $1,300.000 $2,500.000 $1,500.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 3,248.000 $27.000 $30.000 $30.000 $60.000
425 6009 PRESTR CONC SLAB BEAM (4SB12) LF 37.000 $200.000 $330.000 $207.000 $535.000
425 6010 PRESTR CONC SLAB BEAM (5SB12) LF 296.000 $250.000 $290.000 $207.000 $375.000
425 6011 PRESTR CONC SLAB BEAM (4SB15) LF 405.000 $220.000 $290.000 $207.000 $375.000
432 6008 RIPRAP (CONC)(CL B)(RR8&RR9) CY 33.000 $450.000 $550.000 $600.000 $857.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 110.000 $155.000 $250.000 $230.000 $293.000
450 6006 RAIL (TY T223) LF 114.000 $135.000 $230.000 $150.000 $449.000
450 6034 RAIL (TY C402) LF 98.000 $150.000 $300.000 $230.000 $167.000
454 6021 TYPE A JOINT LF 160.000 $80.000 $60.000 $18.000 $413.000
464 6003 RC PIPE (CL III)(18 IN) LF 152.000 $90.000 $90.000 $160.000 $105.000
464 6007 RC PIPE (CL III)(30 IN) LF 96.000 $150.000 $180.000 $210.000 $176.000
464 6008 RC PIPE (CL III)(36 IN) LF 112.000 $200.000 $200.000 $220.000 $260.000
465 6029 INLET (COMPL)(PCU)(3FT)(NONE) EA 1.000 $6,000.000 $3,250.000 $5,000.000 $5,615.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 1.000 $1,200.000 $1,500.000 $1,300.000 $1,836.000
467 6423 SET (TY II) (30 IN) (RCP) (6: 1) (P) EA 2.000 $3,000.000 $2,500.000 $2,100.000 $2,897.000
467 6454 SET (TY II) (36 IN) (RCP) (6: 1) (P) EA 1.000 $5,000.000 $3,400.000 $8,000.000 $4,138.000
496 6001 REMOV STR (BOX CULVERT) EA 1.000 $5,500.000 $5,000.000 $2,000.000 $55,250.000
496 6005 REMOV STR (WINGWALL) EA 4.000 $1,500.000 $800.000 $5,000.000 $3,749.000
496 6007 REMOV STR (PIPE) LF 56.000 $30.000 $25.000 $15.000 $23.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 2.000 $50,000.000 $28,000.000 $65,000.000 $63,500.000
500 6001 MOBILIZATION LS 1.000 $154,000.000 $100,000.000 $180,000.000 $200,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15.000 $4,000.000 $1,500.000 $4,500.000 $5,100.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 312.000 $30.000 $20.000 $53.000 $30.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 312.000 $10.000 $10.000 $26.000 $19.000
506 6031 FRNT END LOADER WORK (ERSN & SEDM CONT) HR 60.000 $100.000 $100.000 $140.000 $274.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,341.000 $6.000 $5.000 $4.150 $5.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,341.000 $2.000 $1.500 $1.250 $1.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 581.000 $6.000 $6.750 $5.500 $7.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 581.000 $1.000 $1.500 $1.250 $1.000
529 6008 CONC CURB & GUTTER (TY II) LF 700.000 $23.500 $30.000 $13.500 $59.000
530 6005 DRIVEWAYS (ACP) SY 261.100 $40.000 $100.000 $70.000 $57.000
530 6016 DRIVEWAYS (BASE) SY 178.100 $70.000 $70.000 $35.000 $13.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 150.000 $35.000 $55.000 $43.000 $41.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $2,300.000 $2,900.000 $2,000.000 $1,968.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $3,200.000 $700.000 $1,500.000 $1,431.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 1.000 $3,400.000 $3,200.000 $3,500.000 $3,133.000
545 6006 CRASH CUSH ATTEN (INSTL)(L)(N)(TL2) EA 6.000 $25,000.000 $32,000.000 $23,000.000 $25,480.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 11.000 $750.000 $800.000 $820.000 $1,136.000
644 6076 REMOVE SM RD SN SUP&AM EA 8.000 $125.000 $200.000 $75.000 $75.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 4.000 $32.680 $20.000 $13.500 $38.000
658 6073 INSTL OM ASSM (OM-2Y)(WC)GND(BI) EA 4.000 $90.000 $30.000 $37.000 $80.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 1,443.000 $3.000 $2.500 $2.500 $2.000
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 1,443.000 $3.000 $2.500 $2.500 $2.000
668 6036 PREFAB PAV MRK TY B (W)(BIKE ARROW) EA 4.000 $250.000 $265.000 $300.000 $240.000
668 6096 PREFAB PAV MRK TY C (W)(BIKE SYMBOL) EA 4.000 $255.000 $265.000 $250.000 $240.000
672 6009 REFL PAV MRKR TY II-A-A EA 19.000 $8.000 $11.000 $5.000 $10.000
678 6001 PAV SURF PREP FOR MRK (4") LF 1,035.000 $1.000 $0.300 $0.500 $0.300
3076 6049 D-GR HMA TY-D SAC-A PG76-22 TON 458.100 $145.000 $220.000 $220.000 $212.000
5001 6002 GEOGRID BASE REINFORCEMENT (TY II) SY 1,164.000 $1.750 $3.000 $5.000 $3.000
Totals: $1,492,417.77 $1,753,094.18 $1,881,581.89 $2,218,722.86