PREPARING ROW
|
STA
|
7.270
|
$2,500.000
|
$4,000.000
|
$4,200.000
|
$2,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
600.000
|
$20.000
|
$40.000
|
$20.000
|
$12.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
75.000
|
$11.000
|
$15.000
|
$20.000
|
$50.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
700.000
|
$6.000
|
$10.000
|
$7.000
|
$12.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
1,247.000
|
$5.000
|
$40.000
|
$11.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,401.230
|
$11.040
|
$11.000
|
$15.000
|
$22.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
90.000
|
$30.000
|
$80.000
|
$50.000
|
$45.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
394.000
|
$20.000
|
$20.000
|
$45.000
|
$40.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
560.610
|
$12.000
|
$20.000
|
$50.000
|
$40.000
|
|
|
BACKFILL (TY A)
|
STA
|
3.770
|
$160.000
|
$4,500.000
|
$2,000.000
|
$1,740.000
|
|
|
BLADING
|
STA
|
7.270
|
$500.000
|
$400.000
|
$600.000
|
$790.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
294.000
|
$0.750
|
$6.000
|
$12.000
|
$16.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
150.000
|
$60.000
|
$50.000
|
$95.000
|
$73.000
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
294.000
|
$0.450
|
$3.000
|
$2.500
|
$3.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
294.000
|
$0.400
|
$3.000
|
$2.500
|
$3.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
1,790.000
|
$0.500
|
$0.600
|
$0.500
|
$1.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
1,790.000
|
$0.200
|
$0.600
|
$0.500
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
147.430
|
$35.000
|
$40.000
|
$3.000
|
$20.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
1,790.000
|
$2.000
|
$3.200
|
$2.650
|
$3.000
|
|
|
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
|
CY
|
506.000
|
$85.000
|
$100.000
|
$56.000
|
$65.000
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
356.000
|
$85.000
|
$170.000
|
$110.000
|
$180.000
|
|
|
CEMENT
|
TON
|
29.000
|
$200.000
|
$250.000
|
$215.000
|
$300.000
|
|
|
CEMENT TREAT (NEW BASE)(11")
|
SY
|
2,812.000
|
$5.000
|
$12.000
|
$15.500
|
$3.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
550.000
|
$6.000
|
$12.000
|
$9.000
|
$8.000
|
|
|
CEM STABIL BKFL
|
CY
|
185.000
|
$105.000
|
$150.000
|
$150.000
|
$100.000
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
518.000
|
$160.000
|
$180.000
|
$225.000
|
$200.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
336.000
|
$250.000
|
$300.000
|
$350.000
|
$300.000
|
|
|
CL C CONC (ABUT)
|
CY
|
56.600
|
$950.000
|
$1,300.000
|
$2,500.000
|
$1,500.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
3,248.000
|
$27.000
|
$30.000
|
$30.000
|
$60.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
37.000
|
$200.000
|
$330.000
|
$207.000
|
$535.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
296.000
|
$250.000
|
$290.000
|
$207.000
|
$375.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
405.000
|
$220.000
|
$290.000
|
$207.000
|
$375.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
33.000
|
$450.000
|
$550.000
|
$600.000
|
$857.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
110.000
|
$155.000
|
$250.000
|
$230.000
|
$293.000
|
|
|
RAIL (TY T223)
|
LF
|
114.000
|
$135.000
|
$230.000
|
$150.000
|
$449.000
|
|
|
RAIL (TY C402)
|
LF
|
98.000
|
$150.000
|
$300.000
|
$230.000
|
$167.000
|
|
|
TYPE A JOINT
|
LF
|
160.000
|
$80.000
|
$60.000
|
$18.000
|
$413.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
152.000
|
$90.000
|
$90.000
|
$160.000
|
$105.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
96.000
|
$150.000
|
$180.000
|
$210.000
|
$176.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
112.000
|
$200.000
|
$200.000
|
$220.000
|
$260.000
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
1.000
|
$6,000.000
|
$3,250.000
|
$5,000.000
|
$5,615.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,200.000
|
$1,500.000
|
$1,300.000
|
$1,836.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,000.000
|
$2,500.000
|
$2,100.000
|
$2,897.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$5,000.000
|
$3,400.000
|
$8,000.000
|
$4,138.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$5,500.000
|
$5,000.000
|
$2,000.000
|
$55,250.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,500.000
|
$800.000
|
$5,000.000
|
$3,749.000
|
|
|
REMOV STR (PIPE)
|
LF
|
56.000
|
$30.000
|
$25.000
|
$15.000
|
$23.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$50,000.000
|
$28,000.000
|
$65,000.000
|
$63,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$154,000.000
|
$100,000.000
|
$180,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$4,000.000
|
$1,500.000
|
$4,500.000
|
$5,100.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$30.000
|
$20.000
|
$53.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$10.000
|
$10.000
|
$26.000
|
$19.000
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
60.000
|
$100.000
|
$100.000
|
$140.000
|
$274.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,341.000
|
$6.000
|
$5.000
|
$4.150
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,341.000
|
$2.000
|
$1.500
|
$1.250
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
581.000
|
$6.000
|
$6.750
|
$5.500
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
581.000
|
$1.000
|
$1.500
|
$1.250
|
$1.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
700.000
|
$23.500
|
$30.000
|
$13.500
|
$59.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
261.100
|
$40.000
|
$100.000
|
$70.000
|
$57.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
178.100
|
$70.000
|
$70.000
|
$35.000
|
$13.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
150.000
|
$35.000
|
$55.000
|
$43.000
|
$41.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,300.000
|
$2,900.000
|
$2,000.000
|
$1,968.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$3,200.000
|
$700.000
|
$1,500.000
|
$1,431.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,400.000
|
$3,200.000
|
$3,500.000
|
$3,133.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
6.000
|
$25,000.000
|
$32,000.000
|
$23,000.000
|
$25,480.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
11.000
|
$750.000
|
$800.000
|
$820.000
|
$1,136.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$125.000
|
$200.000
|
$75.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
4.000
|
$32.680
|
$20.000
|
$13.500
|
$38.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
4.000
|
$90.000
|
$30.000
|
$37.000
|
$80.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,443.000
|
$3.000
|
$2.500
|
$2.500
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,443.000
|
$3.000
|
$2.500
|
$2.500
|
$2.000
|
|
PREFAB PAV MRK TY B (W)(BIKE ARROW)
|
EA
|
4.000
|
$250.000
|
$265.000
|
$300.000
|
$240.000
|
|
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
|
EA
|
4.000
|
$255.000
|
$265.000
|
$250.000
|
$240.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
19.000
|
$8.000
|
$11.000
|
$5.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,035.000
|
$1.000
|
$0.300
|
$0.500
|
$0.300
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
458.100
|
$145.000
|
$220.000
|
$220.000
|
$212.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
1,164.000
|
$1.750
|
$3.000
|
$5.000
|
$3.000
|
|
Totals: |
$1,492,417.769
|
$1,753,094.180
|
$1,881,581.890
|
$2,218,722.860
|