CAMERON CS (0921-06-302)

Items: 92

County: CAMERON
Length: N/A
Highway: CS
District: PHARR
Control Number: 0921-06-302
DBE Goal: N/A
Project: BR 2021(460)
Guaranty: N/A
Time: 221 WORKING DAYS
Engineer's Estimate: $1,998,623.29
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
ANDRES ESPINOZA
HECTOR SILLER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,998,623.29
$2,309,683.25
Over/Under Est: 15.56% $311,059.96
$2,434,143.60
Over/Under Est: 21.79% $435,520.31
Amt Left: 5.39% $124,460.35
Over/Under Est: 41.44% $828,276.39
Amt Left: 22.39% $517,216.43
Delta: -16.14% -$392,756.08
$2,888,504.11
Over/Under Est: 44.52% $889,880.82
Amt Left: 25.06% $578,820.86
Delta: -2.18% -$61,604.43
Subcontractor Percentage Amount
GREGORY PILE DRIVING, INC. 7.95% $186,396.86
TEXAS HIGHWAY SYSTEMS, INC. 0.84% $19,694.76
PAVEMENT MARKINGS INC. 0.36% $8,440.61
TEXAS CORDIA CONSTRUCTION, LLC 0.13% $3,048.00
SOIL TECH ADVANCE INC. 0.10% $2,344.61
Total: 9.38% $219,924.84

Bid Items & Bid Tabulations

92 Total 0 of 92
CAMERON  |  CS  |  PHARR  |  0921-06-302  |  02/02/2023  |  $1,998,623.29  |  BR 2021(460)  |  BRIDGE REPL  |  221 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LUCANIA CONSTRUCTION LLC
FOREMOST PAVING, INC.
TEXAS CORDIA CONSTRUCTION, LLC
IOC COMPANY, LLC
PREPARING ROW
STA 6.750 $3,500.000 $2,500.000 $5,500.000 $2,300.000 $15,000.000
REMOVING CONC (PAV)
SY 61.000 $5.000 $80.000 $50.000 $58.000 $30.000
REMOVING CONC (RIPRAP)
SY 17.000 $10.000 $70.000 $35.000 $62.000 $75.000
REMOVING CONC (CURB AND GUTTER)
LF 167.000 $7.000 $15.000 $12.000 $9.000 $10.000
REMOVING CONC (SAWCUT)
LF 196.000 $14.000 $20.000 $8.000 $23.000 $5.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 996.000 $7.000 $20.000 $15.000 $11.000 $10.000
EXCAVATION (ROADWAY)
CY 152.000 $5.000 $15.000 $55.000 $19.000 $45.000
EXCAVATION (CHANNEL)
CY 90.000 $25.000 $70.000 $34.000 $29.000 $45.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 618.000 $7.000 $25.000 $55.000 $25.000 $45.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,553.000 $1.000 $5.000 $13.000 $3.000 $3.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,553.000 $0.450 $1.200 $1.000 $2.250 $1.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 303.000 $0.400 $1.200 $1.000 $8.000 $0.410
VEGETATIVE WATERING
MG 58.000 $35.000 $55.000 $65.000 $40.000 $50.000
SOIL RETENTION BLANKETS (CL 2) (TY E)
SY 120.000 $2.000 $8.000 $6.000 $8.250 $6.000
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
CY 670.000 $32.000 $50.000 $45.000 $43.000 $60.000
LIME (HYD, COM OR QK)(SLURRY)
TON 4.000 $210.000 $750.000 $300.000 $250.000 $300.000
LIME TRT (SUBGRADE)(6")
SY 412.000 $4.500 $10.000 $30.000 $15.000 $4.500
CEMENT
TON 17.000 $195.000 $300.000 $210.000 $200.000 $210.000
CEMENT TREAT (NEW BASE)(11")
SY 2,114.000 $32.000 $14.000 $11.000 $4.000 $6.000
PRIME COAT (MC-30)
GAL 505.000 $4.500 $15.000 $10.000 $7.000 $6.000
ASPH (TIER II)
GAL 484.000 $5.500 $12.000 $36.000 $7.000 $8.000
AGGR (TY-PD GR-4P)(SAC-B)
CY 16.000 $75.000 $350.000 $70.000 $365.000 $485.000
CONC PVMT (CONT REINF - CRCP) (7")
SY 372.000 $100.000 $120.000 $175.000 $170.000 $200.000
CEM STABIL BKFL
CY 152.000 $90.000 $140.000 $120.000 $86.000 $145.000
DRILL SHAFT (24 IN)
LF 882.000 $290.000 $253.000 $200.000 $280.000 $210.000
CL C CONC (ABUT)
CY 39.000 $1,500.000 $1,500.000 $1,800.000 $1,045.000 $1,300.000
CL C CONC (CAP)
CY 27.000 $2,000.000 $2,000.000 $2,400.000 $2,400.000 $1,500.000
CL C CONC (COLUMN)
CY 12.600 $2,400.000 $2,000.000 $2,400.000 $2,100.000 $1,750.000
CL C CONC (RAIL FOUNDATION)
CY 5.000 $500.000 $900.000 $1,500.000 $2,450.000 $1,750.000
REINF CONC SLAB (SLAB BEAM)
SF 6,720.000 $22.000 $28.000 $16.000 $45.000 $35.000
BRIDGE SIDEWALK
SF 980.000 $13.000 $15.000 $15.000 $30.000 $30.000
PRESTR CONC SLAB BEAM (4SB15)
LF 415.310 $215.000 $280.000 $210.000 $403.000 $250.000
PRESTR CONC SLAB BEAM (5SB15)
LF 969.050 $250.000 $250.000 $210.000 $400.000 $275.000
RIPRAP (CONC)(5 IN)
CY 65.000 $375.000 $600.000 $800.000 $800.000 $650.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 148.000 $175.000 $200.000 $200.000 $215.000 $300.000
RIPRAP (MOW STRIP)(5 IN)
CY 9.000 $400.000 $300.000 $1,000.000 $850.000 $800.000
STR STEEL (MISC NON - BRIDGE)
LB 186.000 $9.000 $28.000 $20.000 $52.000 $50.000
RAIL (TY T223)
LF 32.000 $150.000 $250.000 $300.000 $375.000 $200.000
RAIL (TY C221)
LF 154.000 $120.000 $170.000 $250.000 $340.000 $200.000
RAIL (TY C223)
LF 56.000 $170.000 $380.000 $570.000 $450.000 $200.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 154.000 $145.000 $170.000 $160.000 $260.000 $200.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 94.000 $170.000 $250.000 $160.000 $245.000 $200.000
CONC BOX CULV (9 FT X 9 FT)
LF 96.000 $950.000 $1,500.000 $1,710.000 $2,100.000 $2,000.000
RC PIPE (CL III)(15 IN)
LF 93.000 $55.000 $70.000 $70.000 $70.000 $175.000
RC PIPE (CL III)(18 IN)
LF 152.000 $60.000 $100.000 $80.000 $65.000 $150.000
RC PIPE (CL III)(24 IN)
LF 56.000 $90.000 $175.000 $120.000 $102.000 $200.000
RC PIPE (CL III)(30 IN)
LF 16.000 $120.000 $300.000 $150.000 $235.000 $350.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 4.000 $7,100.000 $3,500.000 $6,000.000 $18,600.000 $15,000.000
WINGWALL (SW - 0) (HW=11 FT)
EA 2.000 $30,000.000 $30,000.000 $50,000.000 $19,250.000 $50,000.000
SET (TY II) (15 IN) (RCP) (3: 1) (P)
EA 4.000 $1,100.000 $500.000 $1,000.000 $1,590.000 $3,673.600
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,300.000 $1,000.000 $1,300.000 $1,745.000 $3,320.800
REMOV STR (HEADWALL)
EA 6.000 $1,500.000 $300.000 $900.000 $3,250.000 $3,679.820
REMOV STR (PIPE)
LF 430.000 $15.000 $15.000 $20.000 $12.000 $25.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $18,000.000 $30,000.000 $15,000.000 $100,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $50,000.000 $50,000.000 $95,000.000 $38,000.000 $100,000.000
MOBILIZATION
LS 1.000 $180,106.190 $215,000.000 $205,000.000 $250,000.000 $275,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $5,000.000 $2,400.000 $3,500.000 $3,600.000 $2,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $35.000 $40.000 $48.000 $25.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $9.000 $20.000 $27.000 $13.000 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,205.000 $4.000 $5.500 $5.000 $3.550 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,205.000 $1.400 $2.000 $2.000 $1.750 $5.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 145.000 $4.000 $8.500 $7.000 $8.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 145.000 $1.000 $5.000 $4.000 $3.000 $4.000
CONC CURB (TY II)
LF 362.000 $15.000 $25.000 $32.000 $45.000 $41.220
CONC CURB & GUTTER (TY II)
LF 51.000 $23.000 $35.000 $75.000 $60.000 $49.870
DRIVEWAYS (ACP)
SY 253.000 $40.000 $120.000 $85.000 $56.000 $100.000
CONC SIDEWALKS (6")
SY 302.000 $65.000 $100.000 $82.000 $110.000 $187.360
CURB RAMPS (TY 10)
EA 4.000 $2,000.000 $2,000.000 $2,400.000 $2,235.000 $4,659.510
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $35.000 $90.000 $69.000 $38.000 $97.900
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $1,450.000 $2,500.000 $3,600.000 $1,400.000 $1,735.000
REMOVE METAL BEAM GUARD FENCE
LF 227.000 $2.000 $5.000 $10.000 $4.000 $5.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $325.000 $40.000 $850.000 $270.000 $350.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 6.000 $22,000.000 $30,000.000 $36,600.000 $29,500.000 $26,650.000
REMOVE AND INSTALL EXISTING GATE
EA 2.000 $1,500.000 $800.000 $2,000.000 $8,335.000 $2,682.070
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $775.000 $750.000 $1,000.000 $1,130.000 $1,150.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $900.000 $1,250.000 $1,600.000 $1,640.000 $1,550.000
REMOVE SM RD SN SUP&AM
EA 6.000 $135.000 $200.000 $125.000 $260.000 $125.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 11.000 $25.000 $25.000 $85.000 $20.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 2.000 $35.000 $25.000 $125.000 $31.000 $36.650
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 12.000 $100.000 $50.000 $150.000 $28.000 $53.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 2.000 $75.000 $60.000 $185.000 $60.000 $55.750
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 24.000 $1.000 $2.750 $3.500 $3.250 $3.250
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 115.000 $3.500 $7.750 $8.000 $8.000 $8.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 121.000 $6.000 $15.500 $16.000 $16.000 $16.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $250.000 $215.000 $450.000 $450.000 $450.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,265.000 $0.400 $3.000 $3.500 $3.250 $3.250
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 115.000 $0.400 $3.000 $3.500 $3.250 $3.250
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 240.000 $0.400 $3.000 $3.500 $3.250 $3.250
REFL PAV MRKR TY II-A-A
EA 12.000 $4.000 $12.000 $10.000 $10.000 $10.000
D-GR HMA TY-D SAC-A PG76-22
TON 278.000 $110.000 $220.000 $265.000 $175.000 $300.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 2,114.000 $1.350 $3.000 $5.000 $3.000 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 56.000 $75.000 $80.000 $200.000 $45.000 $250.000
Totals: $1,998,623.290 $2,309,683.250 $2,434,143.600 $2,826,899.680 $2,888,504.110