PREPARING ROW
|
STA
|
6.750
|
$3,500.000
|
$2,500.000
|
$5,500.000
|
$2,300.000
|
$15,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
61.000
|
$5.000
|
$80.000
|
$50.000
|
$58.000
|
$30.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
17.000
|
$10.000
|
$70.000
|
$35.000
|
$62.000
|
$75.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
167.000
|
$7.000
|
$15.000
|
$12.000
|
$9.000
|
$10.000
|
|
|
REMOVING CONC (SAWCUT)
|
LF
|
196.000
|
$14.000
|
$20.000
|
$8.000
|
$23.000
|
$5.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
996.000
|
$7.000
|
$20.000
|
$15.000
|
$11.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
152.000
|
$5.000
|
$15.000
|
$55.000
|
$19.000
|
$45.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
90.000
|
$25.000
|
$70.000
|
$34.000
|
$29.000
|
$45.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
618.000
|
$7.000
|
$25.000
|
$55.000
|
$25.000
|
$45.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
1,553.000
|
$1.000
|
$5.000
|
$13.000
|
$3.000
|
$3.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
1,553.000
|
$0.450
|
$1.200
|
$1.000
|
$2.250
|
$1.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
303.000
|
$0.400
|
$1.200
|
$1.000
|
$8.000
|
$0.410
|
|
|
VEGETATIVE WATERING
|
MG
|
58.000
|
$35.000
|
$55.000
|
$65.000
|
$40.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY E)
|
SY
|
120.000
|
$2.000
|
$8.000
|
$6.000
|
$8.250
|
$6.000
|
|
|
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
|
CY
|
670.000
|
$32.000
|
$50.000
|
$45.000
|
$43.000
|
$60.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
4.000
|
$210.000
|
$750.000
|
$300.000
|
$250.000
|
$300.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
412.000
|
$4.500
|
$10.000
|
$30.000
|
$15.000
|
$4.500
|
|
|
CEMENT
|
TON
|
17.000
|
$195.000
|
$300.000
|
$210.000
|
$200.000
|
$210.000
|
|
|
CEMENT TREAT (NEW BASE)(11")
|
SY
|
2,114.000
|
$32.000
|
$14.000
|
$11.000
|
$4.000
|
$6.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
505.000
|
$4.500
|
$15.000
|
$10.000
|
$7.000
|
$6.000
|
|
|
ASPH (TIER II)
|
GAL
|
484.000
|
$5.500
|
$12.000
|
$36.000
|
$7.000
|
$8.000
|
|
|
AGGR (TY-PD GR-4P)(SAC-B)
|
CY
|
16.000
|
$75.000
|
$350.000
|
$70.000
|
$365.000
|
$485.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (7")
|
SY
|
372.000
|
$100.000
|
$120.000
|
$175.000
|
$170.000
|
$200.000
|
|
|
CEM STABIL BKFL
|
CY
|
152.000
|
$90.000
|
$140.000
|
$120.000
|
$86.000
|
$145.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
882.000
|
$290.000
|
$253.000
|
$200.000
|
$280.000
|
$210.000
|
|
|
CL C CONC (ABUT)
|
CY
|
39.000
|
$1,500.000
|
$1,500.000
|
$1,800.000
|
$1,045.000
|
$1,300.000
|
|
|
CL C CONC (CAP)
|
CY
|
27.000
|
$2,000.000
|
$2,000.000
|
$2,400.000
|
$2,400.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
12.600
|
$2,400.000
|
$2,000.000
|
$2,400.000
|
$2,100.000
|
$1,750.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
5.000
|
$500.000
|
$900.000
|
$1,500.000
|
$2,450.000
|
$1,750.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
6,720.000
|
$22.000
|
$28.000
|
$16.000
|
$45.000
|
$35.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
980.000
|
$13.000
|
$15.000
|
$15.000
|
$30.000
|
$30.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
415.310
|
$215.000
|
$280.000
|
$210.000
|
$403.000
|
$250.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
969.050
|
$250.000
|
$250.000
|
$210.000
|
$400.000
|
$275.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
65.000
|
$375.000
|
$600.000
|
$800.000
|
$800.000
|
$650.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
148.000
|
$175.000
|
$200.000
|
$200.000
|
$215.000
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
9.000
|
$400.000
|
$300.000
|
$1,000.000
|
$850.000
|
$800.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
186.000
|
$9.000
|
$28.000
|
$20.000
|
$52.000
|
$50.000
|
|
|
RAIL (TY T223)
|
LF
|
32.000
|
$150.000
|
$250.000
|
$300.000
|
$375.000
|
$200.000
|
|
|
RAIL (TY C221)
|
LF
|
154.000
|
$120.000
|
$170.000
|
$250.000
|
$340.000
|
$200.000
|
|
|
RAIL (TY C223)
|
LF
|
56.000
|
$170.000
|
$380.000
|
$570.000
|
$450.000
|
$200.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
154.000
|
$145.000
|
$170.000
|
$160.000
|
$260.000
|
$200.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
94.000
|
$170.000
|
$250.000
|
$160.000
|
$245.000
|
$200.000
|
|
|
CONC BOX CULV (9 FT X 9 FT)
|
LF
|
96.000
|
$950.000
|
$1,500.000
|
$1,710.000
|
$2,100.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
93.000
|
$55.000
|
$70.000
|
$70.000
|
$70.000
|
$175.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
152.000
|
$60.000
|
$100.000
|
$80.000
|
$65.000
|
$150.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
56.000
|
$90.000
|
$175.000
|
$120.000
|
$102.000
|
$200.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
16.000
|
$120.000
|
$300.000
|
$150.000
|
$235.000
|
$350.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
4.000
|
$7,100.000
|
$3,500.000
|
$6,000.000
|
$18,600.000
|
$15,000.000
|
|
|
WINGWALL (SW - 0) (HW=11 FT)
|
EA
|
2.000
|
$30,000.000
|
$30,000.000
|
$50,000.000
|
$19,250.000
|
$50,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (3: 1) (P)
|
EA
|
4.000
|
$1,100.000
|
$500.000
|
$1,000.000
|
$1,590.000
|
$3,673.600
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,300.000
|
$1,000.000
|
$1,300.000
|
$1,745.000
|
$3,320.800
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,500.000
|
$300.000
|
$900.000
|
$3,250.000
|
$3,679.820
|
|
|
REMOV STR (PIPE)
|
LF
|
430.000
|
$15.000
|
$15.000
|
$20.000
|
$12.000
|
$25.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$20,000.000
|
$18,000.000
|
$30,000.000
|
$15,000.000
|
$100,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$50,000.000
|
$50,000.000
|
$95,000.000
|
$38,000.000
|
$100,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$180,106.190
|
$215,000.000
|
$205,000.000
|
$250,000.000
|
$275,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$5,000.000
|
$2,400.000
|
$3,500.000
|
$3,600.000
|
$2,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
78.000
|
$35.000
|
$40.000
|
$48.000
|
$25.000
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$9.000
|
$20.000
|
$27.000
|
$13.000
|
$25.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,205.000
|
$4.000
|
$5.500
|
$5.000
|
$3.550
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,205.000
|
$1.400
|
$2.000
|
$2.000
|
$1.750
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
145.000
|
$4.000
|
$8.500
|
$7.000
|
$8.000
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
145.000
|
$1.000
|
$5.000
|
$4.000
|
$3.000
|
$4.000
|
|
|
CONC CURB (TY II)
|
LF
|
362.000
|
$15.000
|
$25.000
|
$32.000
|
$45.000
|
$41.220
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
51.000
|
$23.000
|
$35.000
|
$75.000
|
$60.000
|
$49.870
|
|
|
DRIVEWAYS (ACP)
|
SY
|
253.000
|
$40.000
|
$120.000
|
$85.000
|
$56.000
|
$100.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
302.000
|
$65.000
|
$100.000
|
$82.000
|
$110.000
|
$187.360
|
|
|
CURB RAMPS (TY 10)
|
EA
|
4.000
|
$2,000.000
|
$2,000.000
|
$2,400.000
|
$2,235.000
|
$4,659.510
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$35.000
|
$90.000
|
$69.000
|
$38.000
|
$97.900
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
1.000
|
$1,450.000
|
$2,500.000
|
$3,600.000
|
$1,400.000
|
$1,735.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
227.000
|
$2.000
|
$5.000
|
$10.000
|
$4.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$325.000
|
$40.000
|
$850.000
|
$270.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
6.000
|
$22,000.000
|
$30,000.000
|
$36,600.000
|
$29,500.000
|
$26,650.000
|
|
|
REMOVE AND INSTALL EXISTING GATE
|
EA
|
2.000
|
$1,500.000
|
$800.000
|
$2,000.000
|
$8,335.000
|
$2,682.070
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
4.000
|
$775.000
|
$750.000
|
$1,000.000
|
$1,130.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$900.000
|
$1,250.000
|
$1,600.000
|
$1,640.000
|
$1,550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$135.000
|
$200.000
|
$125.000
|
$260.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
11.000
|
$25.000
|
$25.000
|
$85.000
|
$20.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
2.000
|
$35.000
|
$25.000
|
$125.000
|
$31.000
|
$36.650
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
12.000
|
$100.000
|
$50.000
|
$150.000
|
$28.000
|
$53.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
2.000
|
$75.000
|
$60.000
|
$185.000
|
$60.000
|
$55.750
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
24.000
|
$1.000
|
$2.750
|
$3.500
|
$3.250
|
$3.250
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
115.000
|
$3.500
|
$7.750
|
$8.000
|
$8.000
|
$8.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
121.000
|
$6.000
|
$15.500
|
$16.000
|
$16.000
|
$16.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
2.000
|
$250.000
|
$215.000
|
$450.000
|
$450.000
|
$450.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,265.000
|
$0.400
|
$3.000
|
$3.500
|
$3.250
|
$3.250
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
115.000
|
$0.400
|
$3.000
|
$3.500
|
$3.250
|
$3.250
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
240.000
|
$0.400
|
$3.000
|
$3.500
|
$3.250
|
$3.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
12.000
|
$4.000
|
$12.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
278.000
|
$110.000
|
$220.000
|
$265.000
|
$175.000
|
$300.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
2,114.000
|
$1.350
|
$3.000
|
$5.000
|
$3.000
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
56.000
|
$75.000
|
$80.000
|
$200.000
|
$45.000
|
$250.000
|
|
Totals: |
$1,998,623.290
|
$2,309,683.250
|
$2,434,143.600
|
$2,826,899.680
|
$2,888,504.110
|