|
|
PREPARING ROW
|
STA
|
266.000
|
$1,000.000
|
$2,225.000
|
$250.000
|
$147.970
|
$940.000
|
$1,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
200.000
|
$7.500
|
$10.000
|
$40.000
|
$24.460
|
$19.000
|
$14.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
38.000
|
$12.000
|
$20.000
|
$27.000
|
$24.460
|
$55.000
|
$18.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
222.000
|
$25.000
|
$10.000
|
$23.000
|
$24.460
|
$12.000
|
$18.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,318.000
|
$15.500
|
$15.000
|
$33.000
|
$24.460
|
$6.000
|
$18.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
400.000
|
$15.000
|
$9.000
|
$9.750
|
$24.460
|
$6.000
|
$10.000
|
|
|
REMOVE STAB BASE & ASPH (8")
|
CY
|
21,393.000
|
$2.700
|
$8.000
|
$9.750
|
$15.680
|
$22.000
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,222.000
|
$7.000
|
$30.000
|
$10.000
|
$14.360
|
$15.000
|
$40.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,956.000
|
$9.000
|
$10.000
|
$9.750
|
$12.470
|
$5.000
|
$44.000
|
|
|
BACKFILL (TY B)
|
STA
|
266.000
|
$130.000
|
$120.000
|
$22.000
|
$80.560
|
$60.000
|
$170.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$18.860
|
$35.000
|
$40.000
|
$55.500
|
$37.000
|
$40.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
72,578.000
|
$0.370
|
$0.300
|
$0.450
|
$0.440
|
$0.290
|
$0.400
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
72,578.000
|
$0.270
|
$0.250
|
$0.400
|
$0.410
|
$0.220
|
$0.370
|
|
|
VEGETATIVE WATERING
|
MG
|
1,000.000
|
$17.250
|
$30.000
|
$36.000
|
$38.850
|
$25.000
|
$35.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
520.000
|
$1.740
|
$3.000
|
$5.000
|
$5.550
|
$2.550
|
$5.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,064.000
|
$5.320
|
$1.000
|
$39.000
|
$24.150
|
$18.000
|
$5.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
15,073.000
|
$20.000
|
$32.000
|
$46.000
|
$41.090
|
$53.000
|
$40.000
|
|
|
REWRKING BS MTRL(TY B)(5")(DC)(ORG POS)
|
CY
|
15,073.000
|
$8.000
|
$8.500
|
$45.000
|
$8.350
|
$5.000
|
$11.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
119,688.000
|
$2.000
|
$3.000
|
$2.350
|
$3.540
|
$2.000
|
$4.200
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
3,556.000
|
$160.000
|
$130.000
|
$195.000
|
$218.020
|
$200.000
|
$190.000
|
|
|
CEMENT
|
TON
|
1,017.000
|
$175.000
|
$155.000
|
$150.000
|
$143.110
|
$180.000
|
$172.000
|
|
|
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
|
SY
|
108,518.000
|
$2.000
|
$2.000
|
$1.650
|
$4.620
|
$2.000
|
$8.500
|
|
|
SALV,HAUL & STKPL RCL APH PV (2" TO 3")
|
SY
|
96,271.000
|
$1.500
|
$1.350
|
$2.050
|
$2.900
|
$3.000
|
$1.400
|
|
|
PRIME COAT (MC-30)
|
GAL
|
21,701.000
|
$3.000
|
$3.500
|
$4.000
|
$0.740
|
$5.000
|
$3.600
|
|
|
ASPH (TIER II)
|
GAL
|
28,867.000
|
$2.800
|
$5.250
|
$2.750
|
$3.250
|
$5.000
|
$3.400
|
|
|
AGGR (TY-D GR-4P)(SAC-B)
|
CY
|
801.000
|
$60.000
|
$40.000
|
$92.000
|
$136.570
|
$152.000
|
$85.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
8,231.000
|
$110.000
|
$125.000
|
$100.000
|
$139.400
|
$152.000
|
$134.000
|
|
|
TACK COAT
|
GAL
|
6,740.000
|
$3.500
|
$3.000
|
$4.000
|
$4.490
|
$7.000
|
$2.600
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
2,389.000
|
$2.250
|
$18.000
|
$1.990
|
$10.320
|
$2.000
|
$15.000
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
8.000
|
$39.500
|
$55.000
|
$51.000
|
$49.950
|
$63.000
|
$55.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
40.000
|
$220.000
|
$145.000
|
$176.000
|
$199.800
|
$140.000
|
$137.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
60.000
|
$290.850
|
$150.000
|
$283.000
|
$321.900
|
$420.000
|
$168.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
14.000
|
$477.000
|
$380.000
|
$473.000
|
$555.000
|
$565.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
37.000
|
$469.000
|
$380.000
|
$473.000
|
$666.000
|
$575.000
|
$400.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
60.000
|
$62.750
|
$40.000
|
$62.000
|
$66.700
|
$130.000
|
$42.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
9.000
|
$781.640
|
$1,100.000
|
$1,800.000
|
$999.000
|
$1,120.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
4.000
|
$1,275.380
|
$1,200.000
|
$2,205.000
|
$1,332.000
|
$1,300.000
|
$1,500.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
2.000
|
$1,765.000
|
$2,000.000
|
$2,585.000
|
$2,775.000
|
$1,680.000
|
$2,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
28.000
|
$1,200.000
|
$400.000
|
$445.000
|
$1,332.000
|
$900.000
|
$450.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$543,424.410
|
$450,000.000
|
$1,000,000.000
|
$695,134.460
|
$800,000.000
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$6,000.000
|
$2,000.000
|
$4,700.000
|
$3,330.000
|
$6,100.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
66.000
|
$42.840
|
$70.000
|
$64.000
|
$72.160
|
$80.000
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
66.000
|
$9.420
|
$40.000
|
$25.000
|
$27.750
|
$50.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
1,716.000
|
$35.000
|
$10.000
|
$34.500
|
$41.000
|
$8.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,716.000
|
$9.410
|
$5.000
|
$10.000
|
$11.100
|
$5.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,432.000
|
$3.000
|
$2.500
|
$3.500
|
$3.770
|
$3.000
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,432.000
|
$0.760
|
$1.000
|
$1.000
|
$1.110
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,825.000
|
$5.000
|
$5.000
|
$4.500
|
$5.000
|
$5.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,825.000
|
$1.520
|
$1.000
|
$1.000
|
$0.830
|
$1.000
|
$1.000
|
|
|
CONC CURB & GUTTER (TY A)
|
LF
|
400.000
|
$20.500
|
$18.000
|
$9.750
|
$33.300
|
$15.000
|
$26.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,249.000
|
$78.080
|
$50.000
|
$59.000
|
$65.370
|
$42.000
|
$55.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,405.000
|
$37.190
|
$40.000
|
$52.500
|
$19.490
|
$30.000
|
$54.000
|
|
|
TURNOUTS (CONC)
|
SY
|
145.000
|
$160.000
|
$50.000
|
$58.500
|
$65.370
|
$89.000
|
$55.000
|
|
|
TURNOUTS (ACP)
|
SY
|
72.000
|
$75.000
|
$48.000
|
$52.500
|
$19.480
|
$77.000
|
$54.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
222.000
|
$50.000
|
$42.000
|
$48.000
|
$72.150
|
$46.000
|
$44.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
540.000
|
$21.570
|
$32.000
|
$43.730
|
$25.530
|
$25.000
|
$32.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,600.000
|
$3,000.000
|
$3,500.000
|
$1,071.150
|
$1,225.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
465.000
|
$5.000
|
$7.500
|
$7.500
|
$2.220
|
$17.000
|
$7.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$250.000
|
$750.000
|
$850.000
|
$194.250
|
$525.000
|
$650.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,734.000
|
$3,300.000
|
$3,500.000
|
$2,969.250
|
$3,000.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$300.000
|
$850.000
|
$850.000
|
$444.000
|
$680.000
|
$750.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
44.000
|
$240.160
|
$300.000
|
$300.000
|
$218.670
|
$229.000
|
$285.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
5.000
|
$317.520
|
$400.000
|
$400.000
|
$246.420
|
$255.000
|
$375.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$592.700
|
$850.000
|
$900.000
|
$780.330
|
$585.000
|
$800.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
4.000
|
$598.000
|
$500.000
|
$730.000
|
$832.500
|
$474.000
|
$465.000
|
|
|
IN RD IL (TY ST) 40T-8 (250W EQ) LED
|
EA
|
4.000
|
$3,647.000
|
$3,000.000
|
$3,000.000
|
$3,274.500
|
$2,900.000
|
$2,850.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
205.000
|
$9.190
|
$8.000
|
$18.000
|
$19.980
|
$7.000
|
$7.750
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,430.000
|
$9.090
|
$11.000
|
$8.000
|
$8.880
|
$10.000
|
$11.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
331.000
|
$17.000
|
$14.000
|
$21.000
|
$23.310
|
$13.000
|
$14.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
215.000
|
$28.110
|
$23.000
|
$35.000
|
$35.520
|
$22.000
|
$23.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
20.000
|
$1.210
|
$1.000
|
$2.000
|
$1.780
|
$1.000
|
$1.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
705.000
|
$1.470
|
$1.200
|
$2.000
|
$1.890
|
$1.000
|
$1.100
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
1,434.000
|
$1.590
|
$1.300
|
$1.800
|
$2.050
|
$1.000
|
$1.250
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
665.000
|
$2.110
|
$2.100
|
$1.940
|
$2.220
|
$2.000
|
$2.100
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
15.000
|
$881.800
|
$600.000
|
$800.000
|
$860.250
|
$600.000
|
$592.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
590.000
|
$2.380
|
$1.800
|
$2.500
|
$24.790
|
$2.000
|
$1.700
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)TP(O)
|
EA
|
1.000
|
$3,895.000
|
$3,600.000
|
$5,150.000
|
$6,349.200
|
$3,615.000
|
$3,600.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
|
EA
|
2.000
|
$1,850.000
|
$1,500.000
|
$1,900.000
|
$2,109.000
|
$1,460.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
6.000
|
$502.000
|
$650.000
|
$650.000
|
$596.070
|
$535.000
|
$625.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$685.000
|
$850.000
|
$850.000
|
$744.810
|
$688.000
|
$825.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
33.000
|
$506.710
|
$350.000
|
$400.000
|
$727.050
|
$535.000
|
$350.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
25.000
|
$74.000
|
$85.000
|
$85.000
|
$55.500
|
$76.000
|
$75.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
19.000
|
$28.000
|
$25.000
|
$26.000
|
$16.650
|
$20.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
13.000
|
$33.000
|
$85.000
|
$85.000
|
$38.850
|
$25.000
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
3,945.000
|
$0.300
|
$0.550
|
$0.500
|
$0.610
|
$0.500
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
12.000
|
$10.000
|
$20.000
|
$9.750
|
$22.200
|
$20.000
|
$20.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
7,988.000
|
$0.300
|
$0.550
|
$0.450
|
$0.610
|
$0.500
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
256.000
|
$3.500
|
$5.000
|
$3.500
|
$5.550
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,520.000
|
$0.700
|
$0.650
|
$0.850
|
$0.720
|
$0.650
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
44.000
|
$6.000
|
$10.000
|
$11.700
|
$11.100
|
$10.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,520.000
|
$0.750
|
$0.650
|
$0.800
|
$0.720
|
$0.650
|
$0.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,592.000
|
$1.000
|
$1.000
|
$0.550
|
$0.720
|
$3.500
|
$1.400
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,185.000
|
$1.000
|
$1.000
|
$2.000
|
$1.110
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
226.000
|
$2.500
|
$1.500
|
$4.850
|
$1.670
|
$1.500
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
316.000
|
$6.420
|
$6.000
|
$8.750
|
$6.660
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,598.000
|
$2.700
|
$3.000
|
$4.500
|
$3.330
|
$3.000
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,350.000
|
$0.400
|
$0.500
|
$0.500
|
$0.560
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
26,471.000
|
$0.400
|
$0.500
|
$0.500
|
$0.530
|
$0.500
|
$0.500
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
47,243.000
|
$0.550
|
$0.600
|
$0.750
|
$0.670
|
$0.500
|
$0.600
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
10.000
|
$213.670
|
$175.000
|
$255.000
|
$194.250
|
$178.000
|
$175.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
10.000
|
$275.000
|
$250.000
|
$300.000
|
$277.500
|
$255.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$550.000
|
$575.000
|
$480.000
|
$638.250
|
$585.000
|
$575.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
60.000
|
$3.670
|
$8.000
|
$4.750
|
$8.880
|
$8.000
|
$8.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,193.000
|
$3.660
|
$4.500
|
$3.750
|
$5.000
|
$5.000
|
$4.500
|
|
TRAFFIC BUTTON TY Y
|
EA
|
2,188.000
|
$2.250
|
$2.750
|
$2.400
|
$3.050
|
$2.000
|
$2.750
|
|
TRAFFIC BUTTON TY B
|
EA
|
5,784.000
|
$1.850
|
$3.000
|
$2.200
|
$3.330
|
$3.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,620.000
|
$0.500
|
$0.450
|
$0.400
|
$0.500
|
$0.500
|
$0.450
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
180.000
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$0.900
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
229.000
|
$1.500
|
$1.350
|
$2.000
|
$1.500
|
$1.400
|
$1.350
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
116.000
|
$3.000
|
$2.800
|
$4.000
|
$3.110
|
$2.850
|
$2.800
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
4.000
|
$55.000
|
$25.000
|
$40.000
|
$27.750
|
$25.000
|
$25.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$65.000
|
$25.000
|
$40.000
|
$27.750
|
$25.000
|
$25.000
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
2.000
|
$5,100.000
|
$7,790.000
|
$2,250.000
|
$2,497.500
|
$7,900.000
|
$7,800.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$4,273.000
|
$4,200.000
|
$2,500.000
|
$2,331.000
|
$4,200.000
|
$4,200.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
12.000
|
$235.210
|
$165.000
|
$250.000
|
$260.850
|
$165.000
|
$163.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
4.000
|
$233.880
|
$165.000
|
$250.000
|
$260.850
|
$165.000
|
$163.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
20.000
|
$237.670
|
$165.000
|
$250.000
|
$260.850
|
$165.000
|
$163.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$235.100
|
$165.000
|
$250.000
|
$260.850
|
$165.000
|
$163.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
18.000
|
$240.250
|
$165.000
|
$250.000
|
$260.850
|
$165.000
|
$163.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
8.000
|
$103.000
|
$120.000
|
$80.000
|
$85.470
|
$115.000
|
$116.000
|
|
|
BACK PLATE (12")(5 SEC)
|
EA
|
4.000
|
$120.000
|
$135.000
|
$95.000
|
$106.560
|
$135.000
|
$135.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
280.000
|
$1.700
|
$2.100
|
$2.100
|
$2.330
|
$1.600
|
$1.700
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
2,750.000
|
$1.250
|
$1.500
|
$1.750
|
$1.830
|
$1.250
|
$1.250
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$3,020.000
|
$900.000
|
$1,900.000
|
$2,081.250
|
$900.000
|
$900.000
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
4.000
|
$6,000.000
|
$5,000.000
|
$6,500.000
|
$6,826.500
|
$5,600.000
|
$5,600.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
1,355.000
|
$11.910
|
$11.000
|
$11.000
|
$11.100
|
$11.000
|
$11.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
1,000.000
|
$80.520
|
$50.000
|
$52.000
|
$60.350
|
$29.000
|
$65.000
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
8,231.000
|
$85.000
|
$108.000
|
$92.000
|
$139.910
|
$130.000
|
$97.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
119,688.000
|
$1.200
|
$1.000
|
$1.000
|
$2.700
|
$3.000
|
$1.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$10,640.000
|
$5,000.000
|
$15,000.000
|
$7,215.000
|
$14,685.000
|
$27,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
330.000
|
$150.000
|
$25.000
|
$300.000
|
$72.150
|
$357.000
|
$160.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
38.000
|
$220.000
|
$200.000
|
$300.000
|
$1,110.000
|
$457.000
|
$260.000
|
|
Totals: |
$5,976,836.020
|
$6,603,453.600
|
$7,654,742.560
|
$8,163,951.210
|
$8,408,762.980
|
$9,139,126.710
|