Show Job Controls
Bid Cobra

CAMERON FM 1732 (0684-03-022)

Items: 132

County: CAMERON
Length: N/A
Highway: FM 1732
District: PHARR
Control Number: 0684-03-022
DBE Goal: N/A
Project: STP 2B20(170)
Guaranty: N/A
Time: 350 WORKING DAYS
Engineer's Estimate: $5,976,836.02
Date: 07/09/2020 (5 years ago)
Contract Number: N/A
Type: REHABILITATE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$5,976,836.02
$6,603,453.60
Over/Under Est: 10.48% $626,617.58
$7,654,742.56
Over/Under Est: 28.07% $1,677,906.54
Amt Left: 15.92% $1,051,288.96
Over/Under Est: 36.59% $2,187,115.19
Amt Left: 23.63% $1,560,497.61
Delta: -6.65% -$509,208.65
Over/Under Est: 40.69% $2,431,926.96
Amt Left: 27.34% $1,805,309.38
Delta: -3.00% -$244,811.77
Over/Under Est: 52.91% $3,162,290.69
Amt Left: 38.4% $2,535,673.11
Delta: -8.69% -$730,363.73

Bid Items & Bid Tabulations

132 Total 0 of 132
CAMERON  |  FM 1732  |  PHARR  |  0684-03-022  |  07/09/2020  |  $5,976,836.02  |  STP 2B20(170)  |  REHAB ROADWAY  |  350 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
EARTHWORKS ENTERPRISE
J. CARROLL WEAVER, INC.
TEXAS CORDIA CONSTRUCTION, LLC
ANDERSON COLUMBIA CO., INC.
PREPARING ROW
STA 266.000 $1,000.000 $2,225.000 $250.000 $147.970 $940.000 $1,000.000
REMOVING CONC (PAV)
SY 200.000 $7.500 $10.000 $40.000 $24.460 $19.000 $14.000
REMOVING CONC (RIPRAP)
SY 38.000 $12.000 $20.000 $27.000 $24.460 $55.000 $18.000
REMOVING CONC (SIDEWALKS)
SY 222.000 $25.000 $10.000 $23.000 $24.460 $12.000 $18.000
REMOVING CONC (DRIVEWAYS)
SY 1,318.000 $15.500 $15.000 $33.000 $24.460 $6.000 $18.000
REMOVING CONC (CURB AND GUTTER)
LF 400.000 $15.000 $9.000 $9.750 $24.460 $6.000 $10.000
REMOVE STAB BASE & ASPH (8")
CY 21,393.000 $2.700 $8.000 $9.750 $15.680 $22.000 $25.000
EXCAVATION (ROADWAY)
CY 1,222.000 $7.000 $30.000 $10.000 $14.360 $15.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,956.000 $9.000 $10.000 $9.750 $12.470 $5.000 $44.000
BACKFILL (TY B)
STA 266.000 $130.000 $120.000 $22.000 $80.560 $60.000 $170.000
FURNISHING AND PLACING TOPSOIL
CY 50.000 $18.860 $35.000 $40.000 $55.500 $37.000 $40.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 72,578.000 $0.370 $0.300 $0.450 $0.440 $0.290 $0.400
CELL FBR MLCH SEED(TEMP)(WARM)
SY 72,578.000 $0.270 $0.250 $0.400 $0.410 $0.220 $0.370
VEGETATIVE WATERING
MG 1,000.000 $17.250 $30.000 $36.000 $38.850 $25.000 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 520.000 $1.740 $3.000 $5.000 $5.550 $2.550 $5.000
SPRINKLING (DUST CONTROL)
MG 1,064.000 $5.320 $1.000 $39.000 $24.150 $18.000 $5.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 15,073.000 $20.000 $32.000 $46.000 $41.090 $53.000 $40.000
REWRKING BS MTRL(TY B)(5")(DC)(ORG POS)
CY 15,073.000 $8.000 $8.500 $45.000 $8.350 $5.000 $11.000
LIME TRT (EXST MATL) (12")
SY 119,688.000 $2.000 $3.000 $2.350 $3.540 $2.000 $4.200
LIME (HYD, COM OR QK)(SLURRY)
TON 3,556.000 $160.000 $130.000 $195.000 $218.020 $200.000 $190.000
CEMENT
TON 1,017.000 $175.000 $155.000 $150.000 $143.110 $180.000 $172.000
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
SY 108,518.000 $2.000 $2.000 $1.650 $4.620 $2.000 $8.500
SALV,HAUL & STKPL RCL APH PV (2" TO 3")
SY 96,271.000 $1.500 $1.350 $2.050 $2.900 $3.000 $1.400
PRIME COAT (MC-30)
GAL 21,701.000 $3.000 $3.500 $4.000 $0.740 $5.000 $3.600
ASPH (TIER II)
GAL 28,867.000 $2.800 $5.250 $2.750 $3.250 $5.000 $3.400
AGGR (TY-D GR-4P)(SAC-B)
CY 801.000 $60.000 $40.000 $92.000 $136.570 $152.000 $85.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 8,231.000 $110.000 $125.000 $100.000 $139.400 $152.000 $134.000
TACK COAT
GAL 6,740.000 $3.500 $3.000 $4.000 $4.490 $7.000 $2.600
PLANE ASPH CONC PAV (1.5")
SY 2,389.000 $2.250 $18.000 $1.990 $10.320 $2.000 $15.000
STRUCT EXCAV (SPECIAL)
CY 8.000 $39.500 $55.000 $51.000 $49.950 $63.000 $55.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 40.000 $220.000 $145.000 $176.000 $199.800 $140.000 $137.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 60.000 $290.850 $150.000 $283.000 $321.900 $420.000 $168.000
RIPRAP (CONC) (CL B) (4")
CY 14.000 $477.000 $380.000 $473.000 $555.000 $565.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 37.000 $469.000 $380.000 $473.000 $666.000 $575.000 $400.000
RC PIPE (CL III)(18 IN)
LF 60.000 $62.750 $40.000 $62.000 $66.700 $130.000 $42.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 9.000 $781.640 $1,100.000 $1,800.000 $999.000 $1,120.000 $1,200.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 4.000 $1,275.380 $1,200.000 $2,205.000 $1,332.000 $1,300.000 $1,500.000
ADJUSTING MANHOLES (SANITARY)
EA 2.000 $1,765.000 $2,000.000 $2,585.000 $2,775.000 $1,680.000 $2,300.000
CLEAN EXIST CULVERTS
EA 28.000 $1,200.000 $400.000 $445.000 $1,332.000 $900.000 $450.000
MOBILIZATION
LS 1.000 $543,424.410 $450,000.000 $1,000,000.000 $695,134.460 $800,000.000 $900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $6,000.000 $2,000.000 $4,700.000 $3,330.000 $6,100.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 66.000 $42.840 $70.000 $64.000 $72.160 $80.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 66.000 $9.420 $40.000 $25.000 $27.750 $50.000 $25.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 1,716.000 $35.000 $10.000 $34.500 $41.000 $8.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 1,716.000 $9.410 $5.000 $10.000 $11.100 $5.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,432.000 $3.000 $2.500 $3.500 $3.770 $3.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,432.000 $0.760 $1.000 $1.000 $1.110 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,825.000 $5.000 $5.000 $4.500 $5.000 $5.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,825.000 $1.520 $1.000 $1.000 $0.830 $1.000 $1.000
CONC CURB & GUTTER (TY A)
LF 400.000 $20.500 $18.000 $9.750 $33.300 $15.000 $26.000
DRIVEWAYS (CONC)
SY 1,249.000 $78.080 $50.000 $59.000 $65.370 $42.000 $55.000
DRIVEWAYS (ACP)
SY 5,405.000 $37.190 $40.000 $52.500 $19.490 $30.000 $54.000
TURNOUTS (CONC)
SY 145.000 $160.000 $50.000 $58.500 $65.370 $89.000 $55.000
TURNOUTS (ACP)
SY 72.000 $75.000 $48.000 $52.500 $19.480 $77.000 $54.000
CONC SIDEWALKS (4")
SY 222.000 $50.000 $42.000 $48.000 $72.150 $46.000 $44.000
MTL W-BEAM GD FEN (TIM POST)
LF 540.000 $21.570 $32.000 $43.730 $25.530 $25.000 $32.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,600.000 $3,000.000 $3,500.000 $1,071.150 $1,225.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 465.000 $5.000 $7.500 $7.500 $2.220 $17.000 $7.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $250.000 $750.000 $850.000 $194.250 $525.000 $650.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,734.000 $3,300.000 $3,500.000 $2,969.250 $3,000.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $300.000 $850.000 $850.000 $444.000 $680.000 $750.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 44.000 $240.160 $300.000 $300.000 $218.670 $229.000 $285.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000 $317.520 $400.000 $400.000 $246.420 $255.000 $375.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $592.700 $850.000 $900.000 $780.330 $585.000 $800.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 4.000 $598.000 $500.000 $730.000 $832.500 $474.000 $465.000
IN RD IL (TY ST) 40T-8 (250W EQ) LED
EA 4.000 $3,647.000 $3,000.000 $3,000.000 $3,274.500 $2,900.000 $2,850.000
CONDT (PVC) (SCH 40) (1")
LF 205.000 $9.190 $8.000 $18.000 $19.980 $7.000 $7.750
CONDT (PVC) (SCH 40) (2")
LF 1,430.000 $9.090 $11.000 $8.000 $8.880 $10.000 $11.000
CONDT (PVC) (SCH 40) (4")
LF 331.000 $17.000 $14.000 $21.000 $23.310 $13.000 $14.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 215.000 $28.110 $23.000 $35.000 $35.520 $22.000 $23.000
ELEC CONDR (NO.8) BARE
LF 20.000 $1.210 $1.000 $2.000 $1.780 $1.000 $1.000
ELEC CONDR (NO.6) BARE
LF 705.000 $1.470 $1.200 $2.000 $1.890 $1.000 $1.100
ELEC CONDR (NO.6) INSULATED
LF 1,434.000 $1.590 $1.300 $1.800 $2.050 $1.000 $1.250
TRAY CABLE (4 CONDR) (12 AWG)
LF 665.000 $2.110 $2.100 $1.940 $2.220 $2.000 $2.100
GROUND BOX TY A (122311)W/APRON
EA 15.000 $881.800 $600.000 $800.000 $860.250 $600.000 $592.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 590.000 $2.380 $1.800 $2.500 $24.790 $2.000 $1.700
ELC SRV TY A 240/480 060(SS)SS(E)TP(O)
EA 1.000 $3,895.000 $3,600.000 $5,150.000 $6,349.200 $3,615.000 $3,600.000
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
EA 2.000 $1,850.000 $1,500.000 $1,900.000 $2,109.000 $1,460.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 6.000 $502.000 $650.000 $650.000 $596.070 $535.000 $625.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $685.000 $850.000 $850.000 $744.810 $688.000 $825.000
RELOCATE SM RD SN SUP&AM TY S80
EA 33.000 $506.710 $350.000 $400.000 $727.050 $535.000 $350.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 25.000 $74.000 $85.000 $85.000 $55.500 $76.000 $75.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 19.000 $28.000 $25.000 $26.000 $16.650 $20.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 13.000 $33.000 $85.000 $85.000 $38.850 $25.000 $85.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 3,945.000 $0.300 $0.550 $0.500 $0.610 $0.500 $0.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 12.000 $10.000 $20.000 $9.750 $22.200 $20.000 $20.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 7,988.000 $0.300 $0.550 $0.450 $0.610 $0.500 $0.550
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 256.000 $3.500 $5.000 $3.500 $5.550 $5.000 $5.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,520.000 $0.700 $0.650 $0.850 $0.720 $0.650 $0.650
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 44.000 $6.000 $10.000 $11.700 $11.100 $10.000 $10.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,520.000 $0.750 $0.650 $0.800 $0.720 $0.650 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,592.000 $1.000 $1.000 $0.550 $0.720 $3.500 $1.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,185.000 $1.000 $1.000 $2.000 $1.110 $1.000 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 226.000 $2.500 $1.500 $4.850 $1.670 $1.500 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 316.000 $6.420 $6.000 $8.750 $6.660 $6.000 $6.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,598.000 $2.700 $3.000 $4.500 $3.330 $3.000 $3.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,350.000 $0.400 $0.500 $0.500 $0.560 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 26,471.000 $0.400 $0.500 $0.500 $0.530 $0.500 $0.500
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 47,243.000 $0.550 $0.600 $0.750 $0.670 $0.500 $0.600
PREFAB PAV MRK TY C (W) (ARROW)
EA 10.000 $213.670 $175.000 $255.000 $194.250 $178.000 $175.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $275.000 $250.000 $300.000 $277.500 $255.000 $250.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $550.000 $575.000 $480.000 $638.250 $585.000 $575.000
REFL PAV MRKR TY I-C
EA 60.000 $3.670 $8.000 $4.750 $8.880 $8.000 $8.000
REFL PAV MRKR TY II-A-A
EA 1,193.000 $3.660 $4.500 $3.750 $5.000 $5.000 $4.500
TRAFFIC BUTTON TY Y
EA 2,188.000 $2.250 $2.750 $2.400 $3.050 $2.000 $2.750
TRAFFIC BUTTON TY B
EA 5,784.000 $1.850 $3.000 $2.200 $3.330 $3.000 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 14,620.000 $0.500 $0.450 $0.400 $0.500 $0.500 $0.450
ELIM EXT PAV MRK & MRKS (8")
LF 180.000 $1.000 $1.000 $1.100 $1.000 $1.000 $0.900
ELIM EXT PAV MRK & MRKS (12")
LF 229.000 $1.500 $1.350 $2.000 $1.500 $1.400 $1.350
ELIM EXT PAV MRK & MRKS (24")
LF 116.000 $3.000 $2.800 $4.000 $3.110 $2.850 $2.800
ELIM EXT PAV MRK & MRKS (ARROW)
EA 4.000 $55.000 $25.000 $40.000 $27.750 $25.000 $25.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $65.000 $25.000 $40.000 $27.750 $25.000 $25.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 2.000 $5,100.000 $7,790.000 $2,250.000 $2,497.500 $7,900.000 $7,800.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $4,273.000 $4,200.000 $2,500.000 $2,331.000 $4,200.000 $4,200.000
VEH SIG SEC (12")LED(GRN)
EA 12.000 $235.210 $165.000 $250.000 $260.850 $165.000 $163.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $233.880 $165.000 $250.000 $260.850 $165.000 $163.000
VEH SIG SEC (12")LED(YEL)
EA 20.000 $237.670 $165.000 $250.000 $260.850 $165.000 $163.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $235.100 $165.000 $250.000 $260.850 $165.000 $163.000
VEH SIG SEC (12")LED(RED)
EA 18.000 $240.250 $165.000 $250.000 $260.850 $165.000 $163.000
BACK PLATE (12")(3 SEC)
EA 8.000 $103.000 $120.000 $80.000 $85.470 $115.000 $116.000
BACK PLATE (12")(5 SEC)
EA 4.000 $120.000 $135.000 $95.000 $106.560 $135.000 $135.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 280.000 $1.700 $2.100 $2.100 $2.330 $1.600 $1.700
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 2,750.000 $1.250 $1.500 $1.750 $1.830 $1.250 $1.250
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $3,020.000 $900.000 $1,900.000 $2,081.250 $900.000 $900.000
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 4.000 $6,000.000 $5,000.000 $6,500.000 $6,826.500 $5,600.000 $5,600.000
VEH LP DETECT (SAWCUT)
LF 1,355.000 $11.910 $11.000 $11.000 $11.100 $11.000 $11.000
POTHOLE REPAIR (STANDARD)
SY 1,000.000 $80.520 $50.000 $52.000 $60.350 $29.000 $65.000
SP MIXES SP-D SAC-B PG76-22
TON 8,231.000 $85.000 $108.000 $92.000 $139.910 $130.000 $97.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 119,688.000 $1.200 $1.000 $1.000 $2.700 $3.000 $1.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $10,640.000 $5,000.000 $15,000.000 $7,215.000 $14,685.000 $27,000.000
TMA (STATIONARY)
DAY 330.000 $150.000 $25.000 $300.000 $72.150 $357.000 $160.000
TMA (MOBILE OPERATION)
DAY 38.000 $220.000 $200.000 $300.000 $1,110.000 $457.000 $260.000
Totals: $5,976,836.020 $6,603,453.600 $7,654,742.560 $8,163,951.210 $8,408,762.980 $9,139,126.710