Job Info for 0684-01-069

County: CAMERON Highway: FM 511 Date: 03/06/2018 (6 years ago) Engineer's Estimate: $3,589,601 Control Number: 0684-01-069
Project: NH 2018(643) District: PHARR Time: 180 WORKING DAYS Type: REHABILITATE PAVEMENT

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,589,601.37
TEXAS SAI, INC.   $3,399,954.24 1
-5.28% | -$189,647.13
FOREMOST PAVING, INC.   $3,488,856.70 2
-2.81% | -$100,744.67
2.61% | $88,902.46
ARANDA BROTHERS CONSTRUCTION CO., INC.   $3,527,438.61 3
-1.73% | -$62,162.76
3.75% | $127,484.37
1.11% | $38,581.91
EARTHWORKS ENTERPRISE   $3,707,447.72 4
3.28% | $117,846.35
9.04% | $307,493.48
5.10% | $180,009.11
IOC COMPANY LLC   $3,828,310.64 5
6.65% | $238,709.27
12.6% | $428,356.40
3.26% | $120,862.92
TEXAS CORDIA CONSTRUCTION, LLC   $4,210,994.46 6
17.31% | $621,393.09
23.85% | $811,040.22
10.00% | $382,683.82
REIM CONSTRUCTION, INC.   $4,544,630.44 7
26.61% | $955,029.07
33.67% | $1,144,676.20
7.92% | $333,635.98

Bid Items

Items: 84, 0 filtered
CAMERON FM 511  |  PHARR  |  0684-01-069  |  03/06/2018  |  $3,589,601  |  NH 2018(643)  |  REHAB PAVMT  |  180 WORKING DAYS
Alt Item code Description Unit Quantity Engineer's Estimate TEXAS SAI, INC. FOREMOST PAVING, INC. ARANDA BROTHERS CONSTRUCTION CO., INC. EARTHWORKS ENTERPRISE IOC COMPANY LLC TEXAS CORDIA CONSTRUCTION, LLC REIM CONSTRUCTION, INC.
104 6017 REMOVING CONC (DRIVEWAYS) SY 1,526.000 $6.000 $9.000 $18.000 $10.000 $4.250 $11.000 $4.000 $9.950
104 6022 REMOVING CONC (CURB AND GUTTER) LF 200.000 $14.000 $5.000 $6.000 $3.000 $6.700 $10.000 $5.000 $4.500
104 6031 REMOVING CONC (HEADWALL) CY 10.000 $125.000 $260.000 $200.000 $150.000 $80.000 $550.000 $275.000 $146.000
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY 100.000 $4.000 $14.000 $19.000 $10.000 $19.500 $30.000 $17.000 $10.500
105 6108 RMV STAB BASE & ASPH PV (17") SY 43,513.000 $3.000 $4.500 $4.000 $9.250 $4.500 $7.750 $9.000 $6.250
110 6001 EXCAVATION (ROADWAY) CY 2,960.000 $2.500 $9.000 $10.000 $10.000 $12.000 $5.000 $8.000 $8.750
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 960.000 $3.500 $7.000 $12.000 $12.000 $13.800 $5.000 $10.000 $6.150
134 6001 BACKFILL (TY A) STA 132.000 $110.000 $225.000 $160.000 $550.000 $206.000 $150.000 $288.000 $153.000
160 6005 FURNISHING AND PLACING TOPSOIL CY 50.000 $20.000 $35.000 $25.000 $120.000 $33.000 $40.000 $29.000 $34.000
164 6036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 2.440 $1,200.000 $1,500.000 $1,400.000 $550.000 $1,780.000 $1,500.000 $743.000 $1,710.000
164 6042 DRILL SEEDING (TEMP) (WARM) AC 2.440 $700.000 $1,400.000 $1,300.000 $570.000 $1,650.000 $1,400.000 $764.000 $1,590.000
168 6001 VEGETATIVE WATERING MG 1,000.000 $5.000 $30.000 $24.000 $15.000 $30.000 $20.000 $27.000 $23.750
204 6003 SPRINKLING (DUST CONTROL) MG 1,000.000 $1.000 $30.000 $1.000 $20.000 $70.000 $1.000 $11.000 $23.750
216 6001 PROOF ROLLING HR 100.000 $35.000 $75.000 $75.000 $60.000 $30.000 $50.000 $45.000 $50.000
276 6077 CM TRT(PT MX)(CL M)(TYA)(GR1-2)(FN POS) CY 19,821.000 $67.000 $52.000 $52.500 $21.000 $65.000 $60.000 $76.000 $83.000
310 6009 PRIME COAT (MC-30) GAL 10,194.000 $3.250 $3.500 $4.000 $4.750 $4.250 $3.450 $3.000 $4.180
316 6277 ASPH (SPG 73-19) GAL 15,720.000 $2.500 $2.750 $4.000 $3.750 $4.500 $3.000 $3.000 $3.720
316 6462 AGGR (TY-PD GR-4P)(SAC-B) CY 450.000 $67.000 $105.000 $65.000 $120.000 $125.000 $75.000 $112.000 $103.000
344 6063 SUPERPAVE MIXTURES SP-C SAC-A PG76-22 TON 8,200.000 $80.000 $69.800 $81.000 $95.000 $91.000 $80.000 $92.000 $105.000
354 6041 PLANE ASPH CONC PAV (1.5") SY 1,200.000 $1.000 $9.000 $7.000 $10.000 $3.200 $3.000 $3.000 $1.850
354 6051 PLANE ASPH CONC PAV (0" TO 1 1/2") SY 1,800.000 $1.700 $9.000 $5.000 $8.500 $3.200 $3.000 $3.000 $1.750
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 20.000 $450.000 $250.000 $500.000 $425.000 $320.000 $450.000 $339.000 $450.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 182.000 $900.000 $650.000 $600.000 $350.000 $900.000 $785.000 $833.000 $762.000
496 6004 REMOV STR (SET) EA 186.000 $225.000 $115.000 $220.000 $200.000 $200.000 $150.000 $335.000 $143.000
496 6007 REMOV STR (PIPE) LF 3,432.000 $8.000 $6.500 $19.000 $10.000 $10.000 $11.000 $4.000 $7.800
500 6001 MOBILIZATION LS 1.000 $266,000.000 $343,434.000 $310,000.000 $345,000.000 $60,000.000 $375,000.000 $270,000.000 $435,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 9.000 $3,500.000 $5,750.000 $4,500.000 $1,850.000 $5,000.000 $3,000.000 $5,513.000 $8,000.000
506 6004 ROCK FILTER DAMS (INSTALL) (TY 4) LF 40.000 $40.000 $80.000 $78.000 $25.000 $95.000 $55.000 $100.000 $22.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 40.000 $10.000 $25.000 $24.000 $5.000 $30.000 $25.000 $31.000 $11.000
506 6021 CONSTRUCTION EXITS (INSTALL) (TY 2) SY 1,882.280 $20.000 $20.000 $21.000 $12.000 $25.000 $15.000 $10.000 $14.500
506 6024 CONSTRUCTION EXITS (REMOVE) SY 1,882.280 $7.000 $8.000 $9.000 $5.000 $9.000 $3.000 $11.000 $8.250
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,150.000 $2.500 $3.250 $4.000 $4.000 $3.900 $4.250 $0.600 $2.100
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,150.000 $0.700 $0.650 $1.000 $1.000 $0.750 $1.200 $1.000 $1.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 3,160.000 $2.500 $3.500 $4.000 $7.000 $4.100 $3.750 $4.000 $3.500
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,160.000 $0.700 $0.500 $1.000 $1.000 $0.600 $0.500 $1.000 $1.000
529 6008 CONC CURB & GUTTER (TY II) LF 200.000 $25.000 $26.000 $25.000 $12.000 $23.000 $21.500 $29.000 $14.500
530 6004 DRIVEWAYS (CONC) SY 1,526.000 $50.000 $47.000 $44.000 $55.000 $36.500 $53.000 $40.000 $62.500
530 6005 DRIVEWAYS (ACP) SY 6,690.000 $27.500 $24.000 $26.000 $32.000 $18.000 $28.000 $15.000 $25.000
531 6004 CURB RAMPS (TY 1) EA 1.000 $1,800.000 $455.000 $1,550.000 $1,500.000 $700.000 $1,750.000 $1,100.000 $1,010.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 300.000 $19.000 $26.000 $29.000 $15.000 $30.000 $35.000 $30.000 $29.500
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $2,000.000 $2,400.000 $3,500.000 $1,350.000 $2,950.000 $3,000.000 $3,300.000 $2,790.000
560 6001 MAILBOX INSTALL-S (TWG-POST) TY 1 EA 42.000 $180.000 $165.000 $200.000 $200.000 $215.000 $400.000 $222.000 $201.000
560 6002 MAILBOX INSTALL-D (TWG-POST) TY 1 EA 9.000 $180.000 $200.000 $225.000 $195.000 $280.000 $400.000 $285.000 $218.000
560 6003 MAILBOX INSTALL-M (TWG-POST) TY 1 EA 2.000 $300.000 $385.000 $600.000 $250.000 $370.000 $500.000 $349.000 $493.000
636 6001 ALUMINUM SIGNS (TY A) SF 18.000 $14.000 $18.800 $34.000 $50.000 $120.000 $100.000 $28.000 $21.500
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 22.000 $400.000 $540.000 $400.000 $500.000 $200.000 $600.000 $730.000 $445.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 3.000 $800.000 $820.000 $660.000 $650.000 $300.000 $750.000 $1,600.000 $619.000
644 6076 REMOVE SM RD SN SUP&AM EA 26.000 $40.000 $85.000 $70.000 $150.000 $32.000 $75.000 $150.000 $77.000
658 6059 INSTL OM ASSM (OM-4)(FLX)GND EA 8.000 $100.000 $225.000 $200.000 $400.000 $60.000 $75.000 $500.000 $171.000
662 6060 WK ZN PAV MRK REMOV (W)4"(BRK) LF 200.000 $0.750 $0.800 $0.800 $1.000 $1.000 $0.850 $1.000 $0.950
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 26,580.000 $0.600 $0.600 $0.600 $1.000 $0.750 $0.800 $1.000 $0.900
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 27,760.000 $0.600 $0.600 $0.600 $1.000 $0.750 $0.800 $1.000 $0.900
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 200.000 $0.540 $1.400 $1.000 $5.000 $0.950 $2.000 $4.000 $1.350
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 1,200.000 $0.540 $1.000 $1.000 $3.000 $0.950 $2.000 $4.000 $2.300
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 880.000 $0.740 $1.800 $1.800 $1.600 $2.150 $1.500 $2.000 $1.700
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 860.000 $2.740 $3.400 $3.400 $3.200 $4.000 $3.000 $4.000 $3.400
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 300.000 $6.000 $7.800 $7.800 $6.500 $9.200 $6.000 $7.000 $6.850
666 6141 REFL PAV MRK TY I (Y)12"(SLD)(100MIL) LF 235.000 $3.000 $3.800 $3.800 $3.250 $4.500 $3.000 $4.000 $3.400
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 1,226.000 $0.310 $0.450 $0.450 $0.800 $0.750 $0.600 $0.750 $0.700
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 27,600.000 $0.290 $0.340 $0.340 $0.700 $0.500 $0.600 $0.750 $0.700
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 6,340.000 $0.310 $0.360 $0.360 $0.700 $0.500 $0.600 $0.750 $0.700
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 15,100.000 $0.280 $0.340 $0.340 $0.700 $0.500 $0.600 $0.750 $0.700
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 6.000 $200.000 $220.000 $220.000 $300.000 $260.000 $275.000 $350.000 $313.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 6.000 $225.000 $240.000 $240.000 $400.000 $300.000 $375.000 $475.000 $427.000
672 6009 REFL PAV MRKR TY II-A-A EA 500.000 $3.000 $2.800 $2.800 $3.750 $3.300 $3.500 $4.000 $4.000
672 6010 REFL PAV MRKR TY II-C-R EA 50.000 $3.000 $4.800 $4.800 $3.700 $5.700 $3.500 $4.000 $4.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 28,800.000 $0.450 $0.800 $0.800 $1.000 $1.000 $0.750 $1.000 $0.800
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 1,200.000 $0.500 $0.900 $0.900 $1.700 $1.100 $1.500 $2.000 $1.700
677 6005 ELIM EXT PAV MRK & MRKS (12") LF 1,100.000 $2.000 $2.000 $2.000 $2.350 $2.500 $2.250 $3.000 $2.550
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 300.000 $2.500 $4.800 $4.800 $4.750 $5.700 $4.500 $6.000 $5.100
677 6008 ELIM EXT PAV MRK & MRKS (ARROW) EA 15.000 $40.000 $60.000 $60.000 $85.000 $70.000 $80.000 $100.000 $91.000
677 6012 ELIM EXT PAV MRK & MRKS (WORD) EA 8.000 $50.000 $60.000 $60.000 $120.000 $70.000 $100.000 $127.000 $114.000
678 6001 PAV SURF PREP FOR MRK (4") LF 3,440.000 $0.350 $0.020 $0.020 $0.500 $0.200 $0.080 $0.500 $0.450
678 6004 PAV SURF PREP FOR MRK (8") LF 280.000 $0.600 $0.200 $0.200 $1.000 $0.250 $0.750 $1.000 $0.800
678 6008 PAV SURF PREP FOR MRK (24") LF 40.000 $1.000 $1.000 $1.000 $2.500 $1.250 $2.000 $2.500 $2.300
680 6002 INSTALL HWY TRF SIG (ISOLATED) EA 2.000 $18,000.000 $20,000.000 $24,000.000 $27,500.000 $27,500.000 $16,200.000 $29,000.000 $18,400.000
4026 6001 THERMOPLASTIC PIPE (18 )(HDPE) LF 3,336.000 $48.000 $29.850 $0.000 $0.000 $0.000 $0.000 $30.000 $0.000
5001 6002 GEOGRID BASE REINFORCEMENT (TY II) SY 52,345.000 $1.500 $1.850 $1.600 $3.750 $2.000 $1.350 $1.000 $1.150
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 510.000 $50.000 $16.000 $18.890 $80.000 $65.000 $40.000 $65.000 $37.500
6002 6001 VIVDS PROCESSOR SYSTEM EA 2.000 $6,000.000 $5,350.000 $8,500.000 $16,500.000 $9,950.000 $4,800.000 $10,800.000 $5,460.000
6002 6002 VIVDS CAMERA ASSEMBLY EA 8.000 $1,500.000 $1,890.000 $1,600.000 $5,000.000 $2,000.000 $1,650.000 $1,969.000 $1,880.000
6002 6003 VIVDS SET-UP SYSTEM EA 2.000 $450.000 $610.000 $900.000 $600.000 $1,000.000 $590.000 $1,000.000 $671.000
6002 6005 VIVDS COMMUNICATION CABLE (COAXIAL) LF 1,275.000 $1.850 $4.250 $3.000 $5.000 $4.000 $4.100 $4.000 $4.650
1 464 6003 RC PIPE (CL III)(18 IN) LF 3,336.000 $48.000 $0.000 $30.000 $38.000 $25.000 $40.000 $0.000 $34.000
Totals: $3,749,729.37 $3,399,954.24 $3,488,856.70 $3,527,438.61 $3,707,447.72 $3,828,310.64 $4,210,994.46 $4,544,630.44