CAMERON IH 69E (0039-07-257)

Items: 97

County: CAMERON
Length: N/A
Highway: IH 69E
District: PHARR
Control Number: 0039-07-257
DBE Goal: N/A
Project: F 2023(418)
Guaranty: N/A
Time: 171 WORKING DAYS
Engineer's Estimate: $4,282,929.11
Date: 03/07/2023 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT RAMPS
Mail/Deliver Bids To: N/A
ANDRES ESPINOZA
HECTOR SILLER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$4,282,929.11
$4,138,510.59
Over/Under Est: -3.37% -$144,418.52
Over/Under Est: -0.42% -$18,137.68
Amt Left: 3.05% $126,280.84
$6,637,373.01
Over/Under Est: 54.97% $2,354,443.90
Amt Left: 60.38% $2,498,862.42
Delta: -55.63% -$2,372,581.58
Subcontractor Percentage Amount
TEXAS ICON CONSTRUCTION, LLC 6.24% $273,635.25
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 4.19% $183,739.05
HIGHWAY BARRICADES AND SERVICES, LLC 1.85% $81,125.84
TEXAS HIGHWAY SYSTEMS, INC. 0.40% $17,540.72
Total: 12.68% $556,040.86

Bid Items & Bid Tabulations

97 Total 0 of 97
CAMERON  |  IH 69E  |  PHARR  |  0039-07-257  |  03/07/2023  |  $4,282,929.11  |  F 2023(418)  |  CONSTRUCT RAMPS  |  171 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
TEXAS CORDIA CONSTRUCTION, LLC
IOC COMPANY, LLC
REMOVING CONC (DRIVEWAYS)
SY 99.000 $11.000 $35.000 $15.000 $50.000
REMOVING CONC (CURB)
LF 3,918.000 $5.200 $8.000 $3.000 $15.000
REMOVING STAB BASE & ASPH PAV (4"-22")
SY 10,645.000 $7.000 $7.000 $16.000 $20.000
EXCAVATION (ROADWAY)
CY 21,325.000 $7.000 $12.000 $6.650 $18.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,377.000 $9.000 $10.000 $4.000 $5.000
FURNISHING AND PLACING TOPSOIL (4")
SY 24,999.000 $0.700 $3.000 $4.000 $3.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 24,999.000 $0.420 $0.400 $1.000 $0.600
CELL FBR MLCH SEED(TEMP)(WARM)
SY 24,999.000 $0.380 $0.300 $1.000 $0.500
VEGETATIVE WATERING
MG 790.000 $31.970 $60.000 $14.000 $45.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 11,411.000 $52.000 $40.000 $46.000 $80.000
CEMENT
TON 455.000 $200.000 $195.000 $175.000 $200.000
CEMENT TREAT (NEW BASE)(20")
SY 20,544.000 $6.740 $7.000 $3.000 $6.000
PRIME COAT (MC-30)
GAL 3,615.000 $4.850 $6.000 $6.000 $6.000
ASPH (TIER II)
GAL 5,421.000 $5.850 $9.000 $4.000 $6.000
AGGR (GR 4P)
CY 153.000 $45.000 $56.000 $124.000 $175.000
PLANE ASPH CONC PAV (1.5")
SY 24,175.000 $3.000 $2.500 $1.000 $2.500
CEM STABIL BKFL
CY 116.000 $64.190 $70.000 $80.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 1,668.000 $2.290 $1.000 $4.000 $1.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 14.000 $113.200 $60.000 $100.000 $75.430
DRILL SHAFT (SIGN MTS) (24 IN)
LF 169.000 $322.130 $140.000 $165.000 $273.510
RIPRAP (CONC)(4 IN)
CY 223.000 $500.000 $400.000 $430.000 $675.000
RIPRAP(CONC)(SIGN MOUNTS)(CL B)
CY 18.900 $887.740 $940.000 $677.000 $675.000
RIPRAP (MOW STRIP)(4 IN)
CY 37.000 $600.000 $400.000 $627.000 $800.000
RC PIPE (CL III)(18 IN)
LF 1,274.000 $70.000 $70.000 $72.000 $110.000
RC PIPE (CL III)(24 IN)
LF 139.000 $85.480 $150.000 $93.000 $140.000
RC PIPE (CL III)(30 IN)
LF 313.000 $120.000 $155.000 $121.000 $185.000
RC PIPE (CL III)(36 IN)
LF 12.000 $245.000 $215.000 $324.000 $315.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 9.000 $6,851.830 $6,500.000 $5,301.000 $9,000.000
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 1.000 $8,200.000 $9,500.000 $7,093.000 $9,000.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 7.000 $7,952.680 $8,700.000 $5,792.000 $10,000.000
REMOV STR (INLET)
EA 7.000 $742.350 $1,200.000 $1,224.000 $1,500.000
REMOV STR (PIPE)
LF 871.000 $8.390 $25.000 $12.000 $20.000
MOBILIZATION
LS 1.000 $398,203.900 $365,000.000 $276,850.000 $675,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,500.000 $4,500.000 $3,000.000 $8,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 702.000 $28.220 $30.000 $18.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 702.000 $8.670 $12.000 $9.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,600.000 $3.570 $4.000 $5.000 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,600.000 $1.340 $2.000 $1.000 $1.250
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 380.000 $4.330 $7.000 $7.000 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 380.000 $1.040 $2.000 $3.000 $3.000
CONSTRUCTING DETOURS
SY 2,844.000 $50.000 $48.000 $35.000 $80.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 6,100.000 $60.000 $24.000 $91.150 $115.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 3,020.000 $30.000 $22.000 $54.000 $55.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $52.000 $24.000 $51.000 $110.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,000.000 $7.000 $14.000 $14.000 $12.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 4,160.000 $2.800 $7.000 $13.000 $12.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $11.000 $7.000 $32.000 $12.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 6,100.000 $9.000 $11.000 $23.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 3,020.000 $8.500 $9.000 $18.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $10.000 $9.000 $25.000 $15.000
CONC CURB & GUTTER (TY II)
LF 3,678.000 $25.000 $25.000 $20.000 $30.000
DRIVEWAYS (CONC)
SY 92.000 $68.000 $85.000 $101.000 $150.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,045.000 $25.000 $26.000 $27.000 $26.850
REMOVE METAL BEAM GUARD FENCE
LF 1,055.000 $2.500 $2.000 $3.000 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $198.000 $180.000 $200.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,200.000 $3,000.000 $3,304.000 $3,304.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $320.000 $275.000 $200.000 $200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $335.000 $1,400.000 $1,150.000 $1,150.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $750.000 $720.000 $1,000.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $8,300.000 $8,525.000 $8,525.000
ALUMINUM SIGNS (TY A)
SF 280.400 $30.640 $24.000 $29.000 $28.000
ALUMINUM SIGNS (TY G)
SF 195.000 $35.540 $33.000 $36.000 $32.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 1.000 $49.910 $42.000 $227.000 $28.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $792.110 $670.000 $842.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $830.000 $850.000 $1,069.000 $975.000
RELOCATE SM RD SN SUP&AM TY S80
EA 12.000 $800.000 $765.000 $784.000 $700.000
REMOVE SM RD SN SUP&AM
EA 4.000 $128.330 $75.000 $170.000 $125.000
INSTALL LRSS (STRUCT STEEL)
LB 900.900 $7.490 $7.000 $7.000 $7.500
RELOCATE LRSA
EA 7.000 $8,350.630 $5,000.000 $3,200.000 $6,250.000
REMOVE LRSA
EA 1.000 $1,206.060 $600.000 $500.000 $95.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 70.000 $88.000 $82.000 $81.000 $95.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 9,242.000 $0.810 $1.700 $0.950 $1.200
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 23,425.000 $0.530 $1.400 $0.950 $0.700
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 57.000 $2.150 $2.000 $1.900 $3.800
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 14,706.000 $0.550 $1.400 $0.950 $0.700
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 35.000 $0.890 $1.300 $0.600 $2.800
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 158.000 $1.470 $2.800 $0.850 $3.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,334.000 $2.340 $1.500 $0.900 $1.200
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 855.000 $3.650 $4.400 $2.200 $2.400
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 335.000 $5.470 $11.000 $4.200 $10.800
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,311.000 $0.360 $0.850 $0.600 $0.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 14,656.000 $0.700 $0.900 $0.720 $0.800
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 320.000 $0.390 $0.900 $0.600 $0.600
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 4,136.000 $0.550 $0.800 $0.720 $0.800
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 1,093.000 $2.500 $2.400 $2.000 $2.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 7.000 $226.470 $241.000 $185.000 $240.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $364.290 $344.000 $350.000 $380.000
PREFAB PAV MRK TY C (W) (WORD)
EA 9.000 $307.610 $285.000 $275.000 $240.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 7.000 $550.000 $625.000 $550.000 $540.000
REFL PAV MRKR TY I-C
EA 6.000 $6.000 $6.000 $4.250 $4.800
REFL PAV MRKR TY II-C-R
EA 477.000 $1.000 $6.000 $4.250 $4.800
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $150,000.000 $7,500.000 $8,664.840 $13,442.000
D-GR HMA TY-B PG64-22
TON 3,084.000 $105.000 $123.000 $100.000 $175.000
SP MIXES SP-D SAC-A PG76-22
TON 3,616.000 $115.000 $138.000 $115.000 $180.000
BONDING COURSE
GAL 3,608.000 $4.020 $4.000 $7.000 $8.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 22,344.000 $1.390 $1.760 $2.000 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $7,500.000 $6,000.000 $382.000 $20,000.000
Totals: $4,282,929.113 $4,138,510.590 $4,264,791.430 $6,637,373.010