Show Job Controls
Bid Cobra

CALLAHAN IH 20 (0006-07-080)

Items: 77

County: CALLAHAN
Length: N/A
Highway: IH 20
District: ABILENE
Control Number: 0006-07-080
DBE Goal: N/A
Project: NH 2019(920)
Guaranty: N/A
Time: 310 WORKING DAYS
Engineer's Estimate: $9,844,141.64
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: MILL & SMA OVRLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$9,844,141.64
$10,684,704.91
Over/Under Est: 8.54% $840,563.27
Over/Under Est: 13.52% $1,331,267.13
Amt Left: 4.59% $490,703.86
$11,244,441.44
Over/Under Est: 14.22% $1,400,299.80
Amt Left: 5.24% $559,736.53
Delta: -0.62% -$69,032.67
$11,282,965.23
Over/Under Est: 14.62% $1,438,823.59
Amt Left: 5.6% $598,260.32
Delta: -0.34% -$38,523.79
Over/Under Est: 38.64% $3,803,394.31
Amt Left: 27.73% $2,962,831.04
Delta: -20.96% -$2,364,570.72
Over/Under Est: 45.23% $4,452,342.27
Amt Left: 33.8% $3,611,779.00
Delta: -4.76% -$648,947.96

Bid Items & Bid Tabulations

77 Total 0 of 77
CALLAHAN  |  IH 20  |  ABILENE  |  0006-07-080  |  05/07/2019  |  $9,844,141.64  |  NH 2019(920)  |  MILL & SMA OVRLAY  |  310 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
J. H. STRAIN & SONS, INC.
CONTRACT PAVING CO.
GILVIN-TERRILL, LTD.
KIEWIT INFRASTRUCTURE SOUTH CO.
ALLEN BUTLER CONSTRUCTION, INC.
REMOVING CONC (CURB)
LF 17,747.000 $3.700 $11.000 $14.000 $15.000 $1.500 $14.640 $19.000
REMOVE CONC (RAIL)
LF 488.000 $20.000 $45.000 $34.500 $33.000 $75.000 $36.610 $47.500
REMOVING CONCRETE(MOW STRIP)
LF 11,182.000 $8.000 $6.500 $11.500 $14.000 $4.000 $12.200 $16.000
EXCAVATION (ROADWAY)
CY 50.000 $9.500 $55.000 $250.000 $50.000 $30.000 $45.210 $290.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 129.000 $7.000 $60.000 $250.000 $75.000 $30.000 $133.160 $164.000
BACKFILL (TY B)
STA 334.000 $161.000 $480.000 $375.000 $550.000 $1,000.000 $447.340 $410.000
ASPH (MULTI OPTION)
GAL 140,069.000 $4.250 $3.500 $5.000 $5.000 $3.500 $3.840 $5.500
AGGR(TY-PB GR-4 SAC-B)
CY 2,648.000 $115.000 $150.000 $125.000 $96.000 $100.000 $159.960 $260.000
SUPERPAV MIX SP-D SAC-B PG70-22(LEV-UP)
TON 349.000 $125.000 $140.000 $200.000 $200.000 $110.000 $451.350 $390.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 33,212.000 $137.000 $130.000 $136.470 $127.020 $130.000 $140.000 $138.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 1,500.000 $20.000 $42.000 $25.000 $33.000 $25.020 $37.190 $56.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,500.000 $35.000 $52.000 $37.500 $56.000 $35.000 $72.260 $67.000
PLANE ASPH CONC PAV(0" TO 2")
SY 8,122.000 $3.100 $1.700 $5.000 $1.000 $2.000 $1.460 $2.500
PLANE ASPH CONC PAV(0" TO 3")
SY 35,523.000 $2.500 $1.700 $2.300 $1.000 $2.000 $0.990 $1.500
PLANE ASPH CONC PAV (2")
SY 15,596.000 $2.500 $1.700 $2.750 $1.000 $1.750 $2.200 $1.750
PLANE ASPH CONC PAV (1" TO 3")
SY 28,384.000 $2.500 $1.700 $3.000 $2.000 $1.750 $1.080 $1.000
PLANE ASPH CONC PAV (2"-3")
SY 176,289.000 $1.750 $1.700 $2.250 $2.000 $1.500 $1.630 $1.500
CL C CONC (RAIL FOUNDATION)
CY 562.000 $465.000 $500.000 $800.000 $975.000 $600.000 $884.730 $1,150.000
RIPRAP (MOW STRIP)(4 IN)
CY 745.000 $422.000 $520.000 $800.000 $755.000 $600.000 $884.730 $1,150.000
RAIL (TY SSTR)
LF 4,016.000 $53.000 $75.000 $64.000 $65.000 $70.000 $67.120 $91.000
RAIL (TY SSTR)(MOD)
LF 244.000 $225.000 $190.000 $125.000 $60.000 $200.000 $131.180 $470.000
RETROFIT RAIL (TY SSTR)
LF 244.000 $200.000 $190.000 $210.000 $180.000 $200.000 $219.660 $500.000
HEADER TYPE EXPANSION JOINT
CF 44.800 $550.000 $700.000 $1,000.000 $520.000 $350.000 $673.430 $1,040.000
JOINT SEALANT
LF 184.000 $10.000 $15.000 $35.000 $22.000 $20.000 $23.330 $32.000
SET (REPLACE PIPE RUNNER)
EA 7.000 $754.000 $3,000.000 $2,750.000 $6,700.000 $3,200.000 $2,564.010 $4,340.000
MOBILIZATION
LS 1.000 $900,000.000 $990,000.000 $500,000.000 $990,000.000 $1,119,975.000 $2,309,208.000 $1,346,902.570
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $11,000.000 $20,000.000 $3,500.000 $7,500.000 $39,000.000 $25,000.000 $18,630.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,155.000 $4.260 $5.500 $8.000 $2.000 $5.000 $5.020 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,155.000 $1.560 $2.000 $2.000 $0.500 $1.000 $1.450 $2.500
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 4,710.000 $4.670 $100.000 $115.000 $85.000 $85.000 $122.030 $135.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 4,710.000 $13.200 $14.000 $17.500 $65.000 $5.000 $18.300 $19.000
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
LF 1,920.000 $7.000 $25.000 $14.000 $65.000 $5.000 $14.640 $31.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 122,616.000 $0.190 $0.150 $0.180 $0.200 $0.250 $0.220 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 15,550.000 $25.000 $24.000 $25.500 $16.000 $23.000 $25.930 $36.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 18.000 $2,210.000 $1,700.000 $1,800.000 $2,450.000 $1,600.000 $2,440.640 $2,540.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 14.000 $1,150.000 $1,100.000 $1,100.000 $1,200.000 $1,000.000 $1,677.940 $1,590.000
MTL BM GD FEN TRANS (NON - SYM)
EA 8.000 $745.000 $1,100.000 $1,200.000 $750.000 $1,050.000 $183.050 $1,670.000
REMOVE METAL BEAM GUARD FENCE
LF 18,940.000 $3.300 $3.200 $3.300 $4.000 $3.000 $3.660 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 15.000 $340.000 $220.000 $225.000 $400.000 $200.000 $366.100 $320.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $195.000 $220.000 $225.000 $400.000 $200.000 $366.100 $320.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 16.000 $330.000 $220.000 $225.000 $400.000 $200.000 $366.100 $320.000
GUARDRAIL END TREATMENT (INSTALL)
EA 24.000 $3,260.000 $2,900.000 $3,000.000 $3,000.000 $2,650.000 $3,630.450 $4,210.000
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000 $330.000 $220.000 $225.000 $400.000 $200.000 $366.100 $320.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $10,450.000 $12,000.000 $10,000.000 $10,000.000 $10,000.000 $12,142.190 $14,300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,100.000 $1,000.000 $1,400.000 $3,000.000 $2,000.000 $3,050.800 $1,990.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,550.000 $1,000.000 $1,700.000 $2,000.000 $1,750.000 $1,220.320 $2,380.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $500.000 $480.000 $500.000 $1,000.000 $450.000 $915.240 $710.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 45.000 $805.000 $590.000 $620.000 $900.000 $550.000 $1,067.780 $870.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 7.000 $1,012.000 $640.000 $675.000 $1,000.000 $600.000 $1,098.290 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 14.000 $945.000 $690.000 $725.000 $1,100.000 $650.000 $1,220.320 $1,030.000
REMOVE SM RD SN SUP&AM
EA 85.000 $72.000 $80.000 $100.000 $150.000 $75.000 $122.030 $119.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 157.000 $55.000 $55.000 $70.000 $100.000 $50.000 $97.630 $79.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 18.000 $26.000 $6.000 $15.000 $100.000 $5.000 $91.520 $8.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 79.000 $50.000 $55.000 $70.000 $100.000 $50.000 $97.630 $79.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 13.000 $26.000 $6.000 $15.000 $100.000 $5.000 $91.520 $8.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 24.000 $72.000 $65.000 $80.000 $100.000 $60.000 $97.630 $95.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 184.000 $53.000 $16.000 $25.000 $50.000 $15.000 $42.710 $24.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 46.000 $25.000 $16.000 $25.000 $50.000 $15.000 $42.710 $24.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 585.000 $0.300 $0.470 $0.500 $1.000 $0.450 $0.550 $0.700
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 2,920.000 $0.300 $0.320 $0.350 $1.000 $0.300 $0.370 $0.500
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 6,570.000 $0.300 $0.320 $0.350 $1.000 $0.300 $0.370 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 10,000.000 $0.670 $0.550 $2.000 $2.000 $1.000 $2.390 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,701.000 $0.900 $1.100 $1.200 $2.000 $1.000 $1.220 $1.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 16,394.000 $0.300 $0.500 $0.500 $1.000 $0.450 $0.550 $0.700
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 72,183.000 $0.500 $0.460 $0.500 $0.500 $0.420 $0.510 $0.650
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 73,028.000 $0.500 $0.460 $0.500 $0.500 $0.420 $0.510 $0.650
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 904.000 $0.500 $5.500 $5.500 $6.000 $5.000 $6.100 $8.000
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 904.000 $0.600 $5.500 $5.500 $6.000 $5.000 $6.100 $8.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 7.000 $150.000 $250.000 $260.000 $650.000 $225.000 $274.570 $360.000
REFL PAV MRKR TY II-C-R
EA 1,161.000 $3.300 $5.000 $4.500 $5.000 $4.000 $4.880 $6.500
ELIM EXT PAV MRK & MRKS (4")
LF 59,662.000 $0.700 $0.400 $0.450 $1.000 $0.380 $0.460 $0.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $22,000.000 $25,000.000 $25,000.000 $15,000.000 $23,991.500 $31,810.000
TMA (STATIONARY)
DAY 720.000 $250.000 $200.000 $325.000 $250.000 $565.000 $225.000 $530.000
TMA (MOBILE OPERATION)
DAY 405.000 $250.000 $300.000 $400.000 $250.000 $500.000 $650.000 $480.000
TEMP Q-DETECT SYS
EA 1.000 $65,000.000 $85,000.000 $125,000.000 $25,000.000 $150,000.000 $100,000.000 $126,227.890
TEMP Q-DETECT SYS (RELOCATE)
EA 7.000 $5,000.000 $1,000.000 $5,000.000 $2,500.000 $5,000.000 $2,500.000 $2,060.000
TEMP SPEED MONITOR SYS
EA 2.000 $12,000.000 $14,500.000 $10,000.000 $5,000.000 $10,000.000 $17,000.000 $23,830.000
Totals: $9,844,141.640 $10,684,704.910 $11,175,408.770 $11,244,441.440 $11,282,965.230 $13,647,535.954 $14,296,483.910