Job Info for 0420-03-018

County: CALHOUN Highway: SH 172 Date: 05/04/2023 (1 year ago) Engineer's Estimate: $1,975,708 Control Number: 0420-03-018
Project: STP 2023(715)HES District: YOAKUM Time: 90 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,975,707.69
BRANNAN PAVING CO., LTD.   $2,118,839.16 1
7.24% | $143,131.47
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.   $2,695,589.81 2
36.44% | $719,882.12
27.22% | $576,750.65
CK NEWBERRY, LLC   $2,696,170.21 3
36.47% | $720,462.52
27.25% | $577,331.05
0.02% | $580.40
HUNTER INDUSTRIES, LTD.   $2,712,039.66 4
37.27% | $736,331.97
28% | $593,200.50
0.59% | $15,869.45

Bid Items

Items: 49, 0 filtered
CALHOUN SH 172  |  YOAKUM  |  0420-03-018  |  05/04/2023  |  $1,975,708  |  STP 2023(715)HES  |  HAZARD ELIM & SAFETY  |  90 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate BRANNAN PAVING CO., LTD. CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. CK NEWBERRY, LLC HUNTER INDUSTRIES, LTD.
100 6002 PREPARING ROW STA 10.500 $1,100.000 $1,080.000 $1,250.000 $2,500.000 $7,000.000
110 6001 EXCAVATION (ROADWAY) CY 1,198.000 $13.000 $12.590 $35.000 $50.000 $28.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 161.780 $500.000 $558.940 $800.000 $600.000 $910.200
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 2,649.000 $25.000 $24.340 $59.000 $30.000 $36.800
150 6002 BLADING HR 50.000 $150.000 $100.000 $75.000 $200.000 $144.000
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 53,427.000 $0.300 $0.340 $0.380 $0.400 $0.340
164 6041 DRILL SEEDING (TEMP) (WARM) SY 13,482.000 $0.200 $0.320 $0.340 $0.340 $0.320
164 6043 DRILL SEEDING (TEMP) (COOL) SY 13,482.000 $0.200 $0.320 $0.340 $0.340 $0.320
168 6001 VEGETATIVE WATERING MG 453.920 $22.000 $30.000 $10.000 $20.000 $24.500
247 6057 FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS) CY 9,879.000 $85.000 $108.000 $125.000 $115.000 $128.390
275 6001 CEMENT TON 160.000 $220.000 $225.000 $300.000 $220.000 $269.500
275 6019 CEMENT TREAT (SUBGRADE)(6") SY 17,499.000 $3.900 $2.280 $2.500 $3.000 $2.280
316 6029 ASPH (RC-250) GAL 4,855.000 $5.000 $7.510 $9.500 $5.500 $5.360
316 6202 AGGR(TY-E GR-5 SAC-B) CY 173.000 $150.000 $193.200 $220.000 $325.000 $129.090
316 6246 AGGR(TY-PE GR-3 SAC-B) CY 328.000 $130.000 $168.000 $210.000 $275.000 $169.490
316 6249 AGGR(TY-PE GR-4 SAC-B) CY 491.000 $130.000 $168.000 $140.800 $175.000 $169.570
316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 32,848.000 $5.000 $4.610 $4.850 $5.250 $5.360
351 6008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 500.000 $100.000 $52.530 $105.000 $75.000 $90.200
400 6005 CEM STABIL BKFL CY 2.400 $120.000 $325.000 $500.000 $500.000 $350.000
462 6004 CONC BOX CULV (4 FT X 3 FT) LF 6.000 $350.000 $1,850.000 $2,000.000 $2,500.000 $1,200.000
467 6143 SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C) EA 1.000 $7,500.000 $11,296.000 $25,000.000 $25,000.000 $15,000.000
500 6001 MOBILIZATION LS 1.000 $178,000.000 $102,863.000 $150,000.000 $250,000.000 $265,179.770
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $3,000.000 $2,345.410 $4,000.000 $15,000.000 $3,222.570
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 210.000 $40.000 $55.330 $42.000 $40.000 $55.330
506 6011 ROCK FILTER DAMS (REMOVE) LF 210.000 $12.000 $10.700 $15.000 $5.000 $10.700
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 350.000 $5.000 $4.650 $6.000 $5.000 $4.650
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 350.000 $1.000 $1.000 $2.000 $3.000 $1.000
530 6003 INTERSECTIONS (SURF TREAT) SY 49.000 $50.000 $30.780 $90.000 $100.000 $55.200
530 6006 DRIVEWAYS (SURF TREAT) SY 2,052.000 $45.000 $34.430 $75.900 $50.000 $41.400
530 6009 TURNOUTS (SURF TREAT) SY 294.000 $45.000 $37.680 $90.200 $45.000 $41.400
560 6003 MAILBOX INSTALL-M (TWG-POST) TY 1 EA 6.000 $450.000 $550.000 $525.000 $800.000 $525.000
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 15.000 $250.000 $225.000 $265.000 $400.000 $265.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $750.000 $650.000 $715.000 $800.000 $715.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 2.000 $925.000 $875.000 $785.000 $1,200.000 $785.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 2.000 $1,000.000 $950.000 $950.000 $1,300.000 $950.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 27.000 $425.000 $430.000 $425.000 $600.000 $425.000
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 4.000 $485.000 $485.000 $500.000 $700.000 $500.000
644 6076 REMOVE SM RD SN SUP&AM EA 39.000 $100.000 $75.000 $85.000 $200.000 $85.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 64,712.000 $0.350 $0.320 $0.440 $0.600 $0.440
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 3,887.000 $0.350 $0.360 $0.420 $0.600 $0.420
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 3,696.000 $0.350 $0.360 $0.420 $0.600 $0.420
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 1,352.000 $2.000 $1.750 $1.000 $1.000 $1.630
666 6343 REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) LF 32,356.000 $0.800 $0.980 $0.900 $1.250 $0.900
666 6346 REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL) LF 3,887.000 $0.800 $1.100 $0.950 $1.250 $0.950
666 6347 REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL) LF 3,696.000 $0.800 $1.100 $0.950 $1.250 $0.950
672 6009 REFL PAV MRKR TY II-A-A EA 241.000 $4.000 $4.800 $5.000 $6.000 $5.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $10,000.000 $9,500.000 $18,000.000 $12,000.000 $8,768.250
6185 6002 TMA (STATIONARY) DAY 20.000 $250.000 $200.000 $150.000 $250.000 $324.750
6185 6005 TMA (MOBILE OPERATION) DAY 20.000 $250.000 $275.000 $150.000 $300.000 $324.750
Totals: $1,975,707.69 $2,118,839.16 $2,695,589.81 $2,696,170.21 $2,712,039.67