CALDWELL FM 2984 (3006-01-007)

Items: 94

County: CALDWELL
Length: N/A
Highway: FM 2984
District: AUSTIN
Control Number: 3006-01-007
DBE Goal: N/A
Project: STP 2B20(041)HES
Guaranty: N/A
Time: 191 WORKING DAYS
Engineer's Estimate: $2,740,609.49
Date: 08/05/2020 (5 years ago)
Contract Number: N/A
Type: REHAB EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,740,609.49
1
$2,961,403.10
Over/Under Est: 8.06% $220,793.61
Over/Under Est: 15.81% $433,241.07
Amt Left: 7.17% $212,447.46
Over/Under Est: 16.38% $448,903.36
Amt Left: 7.7% $228,109.75
Delta: -0.49% -$15,662.29
Over/Under Est: 31.51% $863,646.25
Amt Left: 21.71% $642,852.64
Delta: -13.00% -$414,742.89
Over/Under Est: 49.86% $1,366,449.39
Amt Left: 38.69% $1,145,655.78
Delta: -13.95% -$502,803.14

Bid Items & Bid Tabulations

94 Total 0 of 94
CALDWELL  |  FM 2984  |  AUSTIN  |  3006-01-007  |  08/05/2020  |  $2,740,609.49  |  STP 2B20(041)HES  |  REHAB EXIST ROADWAY  |  191 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
ANGEL BROTHERS HOLDINGS CORP.
DEAN WORD COMPANY, LTD.
HUNTER INDUSTRIES, LTD.
AARON CONCRETE CONTRACTORS, L.P.
PREPARING ROW
STA 294.200 $850.000 $300.000 $830.000 $421.925 $1,108.890 $1,500.000
SUBGRADE WIDENING (ORD COMP)
STA 588.440 $380.000 $250.000 $450.000 $624.927 $865.800 $600.000
BACKFILL (TY B)
STA 588.440 $156.000 $150.000 $55.000 $122.623 $369.630 $57.000
BLADING
HR 50.000 $158.000 $110.000 $100.000 $115.668 $125.400 $160.000
FURNISHING AND PLACING TOPSOIL (4")
SY 61,284.000 $1.000 $3.750 $0.700 $1.134 $1.260 $1.650
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 61,284.000 $0.250 $0.160 $0.260 $0.250 $0.250 $0.300
DRILL SEEDING (TEMP) (WARM)
SY 30,642.000 $0.400 $0.160 $0.300 $0.250 $0.150 $0.300
DRILL SEEDING (TEMP) (COOL)
SY 30,642.000 $0.140 $0.160 $0.300 $0.250 $0.150 $0.300
VEGETATIVE WATERING
MG 919.200 $11.000 $40.000 $18.000 $23.911 $16.650 $41.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 61,284.000 $1.000 $1.370 $0.800 $2.080 $1.450 $1.500
FL BS (CMP IN PLC)(TY D GR 4)
TON 90.000 $50.000 $44.800 $110.000 $44.032 $35.040 $81.000
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 8,719.000 $45.000 $45.000 $75.000 $58.961 $58.500 $79.000
ASPH (TIER II)
GAL 34,783.000 $3.000 $2.780 $2.980 $3.024 $4.060 $3.100
ASPH (RC-250)
GAL 10,458.000 $4.000 $3.570 $3.880 $3.694 $5.110 $4.000
AGGR(TY-PD GR-5 SAC-B)
CY 762.000 $102.000 $126.000 $131.000 $95.126 $112.640 $140.000
AGGR (TY-D GR-5)
CY 214.000 $100.000 $136.500 $197.000 $109.490 $99.460 $150.000
HMCL ACP TY-D AC-0.6
TON 90.000 $85.000 $120.750 $150.000 $125.280 $131.010 $290.000
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 1,500.000 $90.000 $111.300 $82.500 $83.734 $86.700 $123.000
TACK COAT
GAL 1,640.000 $3.250 $2.780 $2.600 $4.990 $3.610 $3.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,000.000 $54.000 $63.000 $44.000 $52.234 $42.940 $70.000
CUT & RESTORING PAV
SY 18.000 $75.000 $150.000 $75.000 $111.240 $87.510 $128.000
FLOWABLE BACKFILL
CY 21.000 $150.000 $150.000 $160.000 $172.800 $147.510 $195.000
TEMPORARY SPL SHORING
SF 1,621.000 $20.000 $35.000 $16.000 $17.280 $21.080 $30.000
RIPRAP (CONC)(5 IN)
CY 33.000 $450.000 $465.000 $455.000 $810.000 $442.730 $560.000
RIPRAP (STONE COMMON)(GROUT)(8 IN)
CY 53.000 $170.000 $195.000 $243.000 $356.400 $239.130 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 109.000 $425.000 $465.000 $470.000 $675.000 $463.810 $595.000
CMP (GAL STL 18 IN)
LF 8.000 $63.000 $123.200 $80.000 $95.040 $178.190 $140.000
CMP (GAL STL 24 IN)
LF 28.000 $75.000 $132.440 $85.000 $87.480 $187.680 $190.000
CMP AR (GAL STL DES 2)
LF 230.000 $60.000 $64.470 $90.000 $85.320 $71.690 $110.000
CMP (GAL STL 15 IN)
LF 4.000 $100.000 $133.000 $90.000 $118.800 $178.190 $242.000
CONC BOX CULV (4 FT X 2 FT)
LF 43.000 $300.000 $749.000 $374.000 $571.050 $631.560 $1,200.000
CONC BOX CULV (6 FT X 3 FT)
LF 64.000 $400.000 $749.000 $428.000 $732.078 $737.000 $1,300.000
CONC BOX CULV (8 FT X 4 FT)
LF 28.000 $450.000 $889.000 $695.000 $1,401.840 $895.150 $1,800.000
CONC BOX CULV (8 FT X 6 FT)
LF 12.000 $695.000 $896.000 $856.000 $1,494.720 $1,053.310 $1,900.000
RC PIPE (CL III)(18 IN)
LF 4.000 $75.000 $100.800 $64.000 $151.200 $420.690 $520.000
RC PIPE (CL III)(24 IN)
LF 39.000 $100.000 $140.000 $74.000 $194.400 $126.510 $230.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 3.000 $4,000.000 $4,403.000 $5,350.000 $3,780.000 $4,734.090 $8,100.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 1.000 $6,000.000 $6,552.000 $6,420.000 $7,533.000 $6,315.640 $19,000.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 3.000 $5,500.000 $5,677.000 $6,955.000 $8,397.000 $5,788.450 $7,600.000
HEADWALL (CH - PW - A - 0) (DES= 7)
EA 1.000 $7,000.000 $6,706.000 $8,560.000 $12,474.000 $13,696.180 $19,000.000
WINGWALL (FW - 0) (HW=3 FT)
EA 6.000 $7,000.000 $6,440.000 $6,420.000 $3,156.840 $3,996.040 $6,300.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $8,000.000 $7,280.000 $9,630.000 $3,506.760 $9,478.720 $9,300.000
WINGWALL (FW - S) (HW=4 FT)
EA 1.000 $10,000.000 $6,424.600 $10,700.000 $5,335.200 $6,315.640 $13,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 4.000 $9,000.000 $8,554.000 $12,840.000 $7,923.960 $9,478.720 $8,300.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $9,500.000 $10,738.000 $14,980.000 $13,689.000 $15,804.900 $8,400.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $18,000.000 $11,736.200 $18,190.000 $21,687.480 $20,022.360 $9,100.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $16,500.000 $22,904.000 $24,075.000 $26,369.280 $39,000.890 $9,100.000
WINGWALL (SW - 0) (HW=5 FT)
EA 1.000 $6,500.000 $6,027.000 $5,350.000 $6,663.600 $7,159.130 $9,300.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $5,500.000 $7,672.000 $8,025.000 $7,776.000 $8,318.920 $15,000.000
SET (TY II) (15 IN) (CMP) (8: 1) (P)
EA 4.000 $850.000 $1,232.000 $1,070.000 $1,026.000 $1,360.130 $1,800.000
SET (TY II) (18 IN) (CMP) (8: 1) (P)
EA 2.000 $1,250.000 $1,302.000 $1,177.000 $1,080.000 $1,465.560 $1,820.000
SET (TY II) (18 IN) (RCP) (8: 1) (P)
EA 4.000 $1,800.000 $1,302.000 $1,605.000 $1,188.000 $1,423.390 $2,000.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 1.000 $1,000.000 $1,302.000 $1,605.000 $1,728.000 $1,571.000 $2,100.000
SET (TY II) (24 IN) (CMP) (8: 1) (P)
EA 2.000 $1,500.000 $1,337.000 $1,926.000 $2,052.000 $1,781.870 $2,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,580.000 $1,337.000 $1,605.000 $1,998.000 $1,571.000 $3,300.000
SET (TY II) (DES 2) (CMP) (8: 1) (P)
EA 14.000 $1,200.000 $1,302.000 $1,391.000 $1,404.000 $1,254.690 $2,100.000
SET (TY II) (DES 3) (CMP) (8: 1) (P)
EA 2.000 $2,000.000 $1,337.000 $1,926.000 $2,160.000 $1,887.310 $2,300.000
CLEAN EXIST CULVERTS
EA 14.000 $4,650.000 $1,200.000 $2,140.000 $1,620.000 $1,505.630 $1,600.000
REMOV STR (SET)
EA 1.000 $425.000 $900.000 $1,600.000 $1,080.000 $516.640 $815.000
REMOV STR (WINGWALL)
EA 21.000 $1,250.000 $750.000 $1,600.000 $1,188.000 $1,655.350 $2,600.000
REMOV STR (HEADWALL)
EA 2.000 $980.000 $950.000 $1,325.000 $1,161.000 $1,676.440 $2,500.000
REMOV STR (PIPE)
EA 1.000 $955.300 $1,200.000 $530.000 $972.000 $622.070 $2,200.000
MOBILIZATION
LS 1.000 $180,000.000 $300,000.000 $317,000.000 $326,000.880 $322,183.250 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $5,500.000 $9,640.000 $4,503.500 $3,235.290 $700.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,800.000 $27.350 $26.820 $27.000 $26.562 $23.500 $42.000
ROCK FILTER DAMS (REMOVE)
LF 1,800.000 $6.000 $16.070 $4.550 $4.732 $6.500 $18.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,980.000 $2.690 $2.630 $2.300 $2.236 $1.850 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,980.000 $0.430 $1.070 $0.250 $0.260 $0.200 $2.000
TURNOUTS (SURF TREAT)
SY 570.000 $40.000 $32.250 $22.000 $37.800 $30.660 $57.000
DRIVEWAYS AND TURNOUTS (SURF TREAT)
SY 570.000 $20.000 $32.250 $22.000 $37.800 $30.660 $57.000
RUMBLE STRIPS (CENTERLINE)
LF 113,932.000 $0.200 $0.140 $0.080 $0.121 $0.120 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 975.000 $20.100 $21.390 $21.700 $22.422 $20.310 $27.000
SHORT RADIUS
LF 16.000 $30.800 $23.650 $59.000 $58.770 $55.260 $41.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $625.000 $806.250 $965.000 $957.268 $905.000 $970.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 350.000 $21.300 $23.650 $22.000 $30.524 $20.500 $23.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 17.000 $2,907.850 $2,623.000 $2,750.000 $2,819.440 $2,576.000 $3,200.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 22.000 $200.000 $295.620 $200.000 $270.400 $188.330 $230.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 6.000 $240.000 $344.000 $260.000 $306.800 $244.790 $294.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $535.000 $655.750 $650.000 $506.480 $615.000 $740.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 14.000 $425.000 $456.870 $570.000 $451.360 $537.990 $646.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 22.000 $54.150 $54.090 $53.000 $49.920 $50.320 $61.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 35.000 $20.000 $21.500 $13.500 $22.880 $13.000 $16.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 28.000 $44.550 $61.130 $60.000 $49.920 $56.870 $68.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 58,382.000 $0.160 $0.230 $0.090 $0.291 $0.080 $0.100
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 810.000 $0.200 $0.240 $0.140 $0.312 $0.130 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 54,740.000 $0.160 $0.240 $0.130 $0.291 $0.120 $0.150
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,979.000 $1.000 $1.070 $1.000 $1.361 $1.780 $1.800
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 810.000 $0.570 $0.344 $0.340 $0.499 $0.320 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 54,740.000 $0.580 $0.344 $0.320 $0.374 $0.300 $0.400
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 58,382.000 $0.580 $0.538 $0.700 $0.728 $0.650 $0.800
REFL PAV MRKR TY II-A-A
EA 716.000 $4.190 $3.700 $3.200 $4.160 $3.000 $3.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,500.000 $14,500.000 $10,000.000 $13,100.000 $8,763.420 $7,200.000
TMA (STATIONARY)
DAY 20.000 $200.000 $300.000 $500.000 $216.000 $350.540 $300.000
TMA (MOBILE OPERATION)
HR 40.000 $75.000 $200.000 $220.000 $48.600 $292.110 $50.000
Totals: $2,740,609.490 $2,961,403.106 $3,173,850.560 $3,189,512.918 $3,604,255.757 $4,107,058.880