Job Info for 0914-22-071

County: CALDWELL Highway: CR Date: 06/27/2023 (1 year ago) Engineer's Estimate: $555,929 Control Number: 0914-22-071
Project: BR 2021(665) District: AUSTIN Time: 40 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $555,929.07
A GREATER AUSTIN DEVELOPMENT COMPANY, LLC   $742,959.70 1
33.64% | $187,030.63
E-Z BEL CONSTRUCTION, LLC   $774,915.50 2
39.39% | $218,986.43
4.3% | $31,955.80
DELGADO'S CONTRACTORS, LLC   $855,763.00 3
53.93% | $299,833.93
15.18% | $112,803.30
10.43% | $80,847.50
RELMCO, INC.   $866,831.00 4
55.92% | $310,901.93
16.67% | $123,871.30
1.29% | $11,068.00
CROSS PLUS CONSTRUCTION, LLC   $940,663.90 5
69.21% | $384,734.83
26.61% | $197,704.20
8.52% | $73,832.90

Bid Items

Items: 35, 0 filtered
CALDWELL CR  |  AUSTIN  |  0914-22-071  |  06/27/2023  |  $555,929  |  BR 2021(665)  |  BRIDGE REPL  |  40 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate A GREATER AUSTIN DEVELOPMENT COMPANY, LLC E-Z BEL CONSTRUCTION, LLC DELGADO'S CONTRACTORS, LLC RELMCO, INC. CROSS PLUS CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 3.000 $4,000.000 $6,840.000 $3,800.000 $2,000.000 $10,000.000 $1,100.000
110 6001 EXCAVATION (ROADWAY) CY 25.000 $10.000 $164.000 $65.000 $40.000 $100.000 $55.000
110 6002 EXCAVATION (CHANNEL) CY 152.000 $15.000 $32.000 $40.000 $40.000 $100.000 $55.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 320.000 $15.000 $42.250 $28.000 $80.000 $50.000 $27.500
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 1,702.000 $0.990 $5.600 $3.000 $6.000 $10.000 $16.500
164 6009 BROADCAST SEED (TEMP) (WARM) SY 389.000 $0.570 $3.400 $2.000 $1.000 $5.000 $3.300
164 6021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 778.000 $0.320 $1.700 $1.000 $2.000 $5.000 $6.600
168 6001 VEGETATIVE WATERING MG 20.000 $26.500 $115.000 $480.000 $250.000 $50.000 $110.000
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 778.000 $1.000 $2.100 $1.500 $7.000 $8.000 $3.300
247 6392 FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS) CY 164.000 $85.000 $155.000 $120.000 $60.000 $100.000 $110.000
400 6005 CEM STABIL BKFL CY 58.000 $140.000 $240.000 $423.250 $250.000 $165.000 $220.000
416 6004 DRILL SHAFT (36 IN) LF 216.000 $140.000 $273.300 $284.000 $375.000 $350.000 $302.500
420 6013 CL C CONC (ABUT) CY 33.800 $800.000 $1,125.000 $1,500.000 $1,300.000 $1,479.800 $1,650.000
422 6001 REINF CONC SLAB SF 2,210.000 $18.000 $32.750 $40.000 $34.000 $33.600 $33.000
422 6015 APPROACH SLAB CY 38.500 $536.000 $710.000 $1,139.000 $1,000.000 $917.000 $1,650.000
425 6036 PRESTR CONC GIRDER (TX34) LF 338.000 $250.000 $215.650 $365.750 $225.000 $247.800 $275.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 406.000 $200.000 $169.000 $163.000 $250.000 $163.800 $220.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 100.000 $500.000 $565.000 $645.000 $650.000 $588.000 $550.000
450 6018 RAIL (TY T631) LF 206.000 $90.000 $107.000 $198.000 $110.000 $120.510 $220.000
454 6003 ARMOR JOINT LF 44.000 $150.000 $165.000 $218.000 $250.000 $150.000 $110.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $25,000.000 $28,000.000 $21,832.000 $30,000.000 $18,500.000 $55,000.000
496 6043 REMOV STR (SMALL FENCE) LF 50.000 $25.000 $15.000 $8.000 $10.000 $100.000 $11.000
500 6001 MOBILIZATION LS 1.000 $45,000.000 $73,000.000 $26,250.000 $95,000.000 $40,000.000 $110,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $4,000.000 $4,300.000 $1,796.000 $3,000.000 $25,000.000 $5,500.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 110.000 $35.000 $49.000 $47.000 $50.000 $60.000 $55.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 110.000 $9.500 $7.750 $24.000 $10.000 $30.000 $1.100
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 440.000 $2.440 $4.200 $4.000 $7.000 $15.000 $16.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 440.000 $0.720 $1.050 $1.700 $2.000 $5.000 $1.100
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 300.000 $21.500 $23.000 $27.000 $30.000 $33.000 $44.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $2,700.000 $3,100.000 $3,538.000 $3,250.000 $3,300.000 $4,400.000
552 6003 WIRE FENCE (TY C) LF 50.000 $25.000 $52.500 $85.000 $25.000 $22.000 $22.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 2.000 $470.000 $685.000 $653.000 $1,000.000 $880.000 $220.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 12.000 $45.000 $25.000 $39.000 $60.000 $55.000 $55.000
3076 6070 D-GR HMA TY-D PG 76-22 SAC-B (EXEMPT) TON 192.000 $172.000 $321.000 $181.000 $335.000 $300.000 $275.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $5,000.000 $6,000.000 $4,500.000 $10,000.000 $15,000.000 $11,000.000
Totals: $555,929.07 $742,959.70 $774,915.50 $855,763.00 $866,831.00 $940,663.90