BURNET RM 963 (1198-01-022)

Items: 115

County: BURNET
Length: N/A
Highway: RM 963
District: AUSTIN
Control Number: 1198-01-022
DBE Goal: N/A
Project: C 1198-1-22
Guaranty: N/A
Time: 454 WORKING DAYS
Engineer's Estimate: $7,438,175.26
Date: 06/05/2018 (8 years ago)
Contract Number: N/A
Type: PROVIDE ADDITIONAL PAVED SURFACE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,438,175.26
$7,444,233.25
Over/Under Est: 0.08% $6,057.99
Over/Under Est: 14.39% $1,070,159.89
Amt Left: 14.29% $1,064,101.90
Over/Under Est: 28.63% $2,129,826.29
Amt Left: 28.53% $2,123,768.30
Delta: -12.45% -$1,059,666.40
$10,957,499.02
Over/Under Est: 47.31% $3,519,323.76
Amt Left: 47.19% $3,513,265.77
Delta: -14.52% -$1,389,497.47

Bid Items & Bid Tabulations

115 Total 0 of 115
BURNET  |  RM 963  |  AUSTIN  |  1198-01-022  |  06/05/2018  |  $7,438,175.26  |  C 1198-1-22  |  PROVIDE ADDITIONAL PAVED SURF  |  454 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DENBOW COMPANY INC.
CAPITAL EXCAVATION COMPANY
AARON CONCRETE CONTRACTORS, L.P.
RAY FARIS, INC.
PREPARING ROW
STA 882.610 $250.010 $55.680 $1,040.000 $200.000 $701.220
EXCAVATION (ROADWAY)
CY 77,905.000 $11.000 $7.710 $7.000 $18.000 $17.550
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 7,027.000 $12.000 $6.350 $5.000 $13.000 $11.050
BLADING
HR 100.000 $100.000 $101.680 $100.000 $156.000 $88.400
FURNISHING AND PLACING TOPSOIL (4")
SY 256,951.000 $1.500 $1.350 $1.000 $0.900 $2.260
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 256,951.000 $0.130 $0.180 $0.150 $0.150 $0.160
BROADCAST SEED (TEMP) (WARM)
SY 128,476.000 $0.090 $0.180 $0.140 $0.150 $0.100
VEGETATIVE WATERING
MG 5,139.000 $15.000 $20.890 $15.000 $43.000 $20.840
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 256,951.000 $0.900 $1.320 $0.690 $0.700 $1.200
PROOF ROLLING
HR 100.000 $100.000 $116.600 $100.000 $105.000 $110.500
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 28,603.000 $38.000 $39.350 $42.000 $53.000 $63.820
PRIME COAT (AE-P)
GAL 15,691.000 $3.750 $3.340 $3.400 $3.200 $4.360
ASPH (TIER II)
GAL 149,063.000 $2.800 $3.620 $3.600 $3.500 $3.870
AGGR(TY-PD GR-4 SAC-B)
CY 3,240.000 $80.000 $105.790 $105.000 $100.000 $92.940
HMCL ACP TY-D AES-300
TON 114.000 $150.000 $115.250 $105.000 $127.000 $158.500
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 12,506.000 $75.000 $79.060 $77.000 $75.000 $95.150
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 4,000.000 $46.000 $46.770 $45.000 $45.000 $43.100
PLANE ASPH CONC PAV(0" TO 1")
SY 19,112.000 $1.600 $3.340 $3.150 $3.200 $4.420
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 8.000 $300.000 $82.680 $319.990 $800.000 $750.000
RIPRAP (CONC)(5 IN)
CY 460.000 $440.000 $402.390 $430.730 $410.000 $550.000
RIPRAP (CONC)(CL B)(5 IN)
CY 40.000 $415.000 $992.180 $498.440 $413.000 $550.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 7.000 $200.000 $551.210 $737.470 $350.000 $120.000
RIPRAP (MOW STRIP)(4 IN)
CY 97.000 $485.000 $391.360 $517.070 $504.000 $600.000
GABION MATTRESSES (PVC)(12 IN)
SY 373.000 $50.000 $27.080 $89.340 $94.000 $49.000
CMP (GAL STL 12 IN)
LF 82.000 $54.000 $38.360 $60.180 $72.000 $50.000
CMP (GAL STL 18 IN)
LF 62.000 $60.000 $52.290 $63.860 $82.000 $55.000
CMP AR (GAL STL DES 2)
LF 39.000 $75.000 $44.160 $57.330 $83.000 $50.000
CMP AR (GAL STL DES 4)
LF 10.800 $120.000 $77.680 $127.030 $110.000 $130.000
CMP AR (GAL STL DES 6)
LF 32.400 $300.000 $107.720 $205.580 $145.000 $300.000
CMP (GAL STL 15 IN)
LF 25.000 $65.000 $53.580 $53.680 $80.000 $50.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 12.900 $650.000 $779.200 $1,100.000 $1,010.000 $450.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 12.000 $700.000 $679.950 $1,100.000 $880.000 $550.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 18.500 $725.000 $801.240 $1,100.000 $1,700.000 $575.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 12.000 $750.000 $867.370 $1,200.000 $1,500.000 $625.000
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 18.000 $750.000 $842.040 $1,100.000 $1,200.000 $725.000
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
LF 16.000 $800.000 $894.540 $1,100.000 $1,600.000 $775.000
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
LF 14.200 $900.000 $993.750 $1,300.000 $1,800.000 $950.000
CONC BOX CULV (11 FT X 6 FT)(EXTEND)
LF 20.300 $1,500.000 $1,963.890 $1,400.000 $3,300.000 $1,050.000
CONC BOX CULV (3 FT X 5 FT)(EXTEND)
LF 14.900 $675.000 $730.270 $1,000.000 $1,200.000 $475.000
RC PIPE (CL III)(12 IN)
LF 33.300 $50.000 $60.000 $100.000 $80.000 $52.000
RC PIPE (CL III)(18 IN)
LF 13.300 $80.000 $63.530 $300.000 $97.000 $55.000
RC PIPE (CL III)(24 IN)
LF 195.700 $75.000 $85.700 $300.000 $114.000 $100.000
RC PIPE (CL III)(30 IN)
LF 73.100 $100.000 $126.360 $300.000 $135.000 $130.000
RC PIPE (CL III)(36 IN)
LF 93.800 $115.000 $149.510 $300.000 $160.000 $200.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 1.000 $3,000.000 $4,630.190 $2,063.600 $9,200.000 $3,000.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 4.000 $3,500.000 $8,047.710 $2,621.220 $12,200.000 $4,000.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $5,000.000 $8,047.720 $3,335.320 $15,300.000 $5,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 5.000 $6,000.000 $13,339.360 $4,076.270 $21,300.000 $6,000.000
HEADWALL (CH - PW - A - 0) (DES= 4)
EA 1.000 $5,000.000 $16,095.430 $4,075.920 $12,000.000 $6,500.000
HEADWALL (CH - PW - A - 0) (DES= 6)
EA 2.000 $5,000.000 $3,858.490 $4,075.830 $16,500.000 $9,000.000
WINGWALL (FW - 0) (HW=3 FT)
EA 1.000 $4,500.000 $5,622.380 $4,681.100 $7,300.000 $2,500.000
WINGWALL (PW - 1) (HW=3 FT)
EA 2.000 $5,000.000 $5,787.740 $6,094.420 $13,100.000 $8,500.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $12,200.000 $7,827.230 $18,734.270 $31,000.000 $12,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 6.000 $11,000.000 $11,906.210 $7,481.650 $35,300.000 $14,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 3.000 $14,000.000 $20,229.520 $13,056.090 $65,800.000 $22,500.000
WINGWALL (PW - 1) (HW=8 FT)
EA 3.000 $16,500.000 $24,032.890 $13,056.090 $57,185.000 $26,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $5,600.000 $7,143.730 $5,626.560 $5,200.000 $5,500.000
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)
EA 2.000 $6,500.000 $10,803.780 $7,898.020 $12,300.000 $9,500.000
SET (TY II) (12 IN) (CMP) (6: 1) (P)
EA 6.000 $850.000 $435.140 $979.790 $1,300.000 $800.000
SET (TY II) (12 IN) (RCP) (4: 1) (C)
EA 1.000 $900.000 $534.910 $1,145.610 $1,700.000 $750.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 2.000 $850.000 $579.670 $1,076.080 $1,400.000 $800.000
SET (TY II) (15 IN) (CMP) (6: 1) (P)
EA 2.000 $1,000.000 $501.540 $1,003.460 $1,400.000 $825.000
SET (TY II) (15 IN) (RCP) (4: 1) (C)
EA 1.000 $1,400.000 $545.600 $1,121.520 $1,700.000 $775.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 4.000 $1,250.000 $527.990 $1,032.630 $1,400.000 $850.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,250.000 $555.610 $1,141.680 $1,700.000 $800.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,250.000 $1,044.260 $1,545.830 $2,000.000 $850.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 36.000 $1,100.000 $604.340 $1,447.510 $1,700.000 $850.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 4.000 $1,500.000 $945.950 $1,877.060 $1,900.000 $950.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 12.000 $1,785.000 $1,233.580 $1,656.930 $1,950.000 $1,600.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 3.000 $3,250.000 $1,697.490 $2,794.320 $2,900.000 $2,500.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 2.000 $1,500.000 $855.480 $1,045.600 $1,400.000 $850.000
SET (TY II) (DES 4) (CMP) (4: 1) (C)
EA 2.000 $2,000.000 $1,195.560 $2,116.560 $1,800.000 $2,000.000
SET (TY II) (DES 6) (CMP) (4: 1) (C)
EA 3.000 $2,000.000 $1,892.340 $2,116.720 $3,100.000 $4,500.000
CLEAN EXIST CULVERTS
EA 40.000 $1,000.000 $584.120 $2,000.000 $2,000.000 $1,500.000
REMOV STR (DRIVEWAY CULVERT)
EA 8.000 $400.000 $840.410 $1,000.000 $900.000 $1,200.000
MOBILIZATION
LS 1.000 $676,000.000 $414,695.840 $850,000.000 $770,000.000 $1,205,331.780
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $4,000.000 $3,356.550 $2,000.000 $1,600.000 $8,400.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 8,064.000 $18.000 $30.250 $22.940 $24.000 $27.440
ROCK FILTER DAMS (REMOVE)
LF 8,064.000 $6.000 $6.610 $5.380 $6.000 $6.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $12.500 $26.860 $25.050 $26.000 $24.360
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $4.000 $6.610 $8.120 $8.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 51,370.000 $1.750 $2.320 $2.030 $2.000 $2.100
TEMP SEDMT CONT FENCE (REMOVE)
LF 51,370.000 $0.250 $0.220 $0.420 $0.400 $0.200
DRIVEWAYS (CONC)
SY 107.000 $90.000 $103.620 $100.000 $63.000 $133.840
DRIVEWAYS (SURF TREAT)
SY 5,878.000 $12.000 $21.650 $35.000 $20.000 $27.680
TURNOUTS (SURF TREAT)
SY 1,014.000 $35.000 $20.720 $23.000 $19.000 $27.680
INTRSCT, DRVWAYS, & TURNOUT(SURF TREAT)
SY 3,193.000 $25.000 $20.010 $35.000 $21.000 $27.680
MTL W-BEAM GD FEN (TIM POST)
LF 888.000 $20.000 $22.600 $22.500 $24.000 $20.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,450.000 $1,482.760 $1,545.000 $1,600.000 $1,345.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $22.000 $22.600 $21.500 $23.000 $20.500
REMOVE METAL BEAM GUARD FENCE
LF 538.000 $2.000 $1.100 $2.500 $3.000 $1.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 12.000 $140.000 $110.240 $200.000 $210.000 $100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $255.000 $110.240 $235.000 $250.000 $100.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 24.000 $2,000.000 $3,006.680 $2,837.000 $3,000.000 $2,727.330
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 48.000 $170.000 $214.970 $186.870 $200.000 $185.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 6.000 $200.000 $275.610 $209.090 $220.000 $207.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 4.000 $483.000 $496.090 $542.430 $570.000 $537.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $432.000 $529.160 $449.500 $472.000 $445.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 9.000 $650.000 $727.600 $601.010 $630.000 $595.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 60.000 $275.000 $551.210 $368.690 $390.000 $365.000
REMOVE SM RD SN SUP&AM
EA 78.000 $75.000 $118.090 $65.660 $70.000 $65.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 291.000 $50.000 $58.430 $47.470 $50.000 $47.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 57.000 $20.000 $17.640 $18.180 $20.000 $18.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 78.000 $20.000 $56.220 $52.530 $56.000 $52.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,927.000 $0.340 $0.110 $0.200 $0.200 $0.100
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 177,354.000 $0.170 $0.190 $0.200 $0.200 $0.170
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 162,789.000 $0.170 $0.190 $0.200 $0.200 $0.170
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,008.000 $1.000 $0.500 $1.010 $1.600 $1.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 60.000 $6.000 $14.330 $6.060 $6.400 $13.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 177,354.000 $0.280 $0.320 $0.280 $0.300 $0.290
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,927.000 $0.340 $0.330 $0.300 $0.300 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 162,789.000 $0.280 $0.320 $0.280 $0.300 $0.290
REFL PAV MRKR TY II-A-A
EA 2,123.000 $3.000 $3.690 $3.030 $3.200 $3.350
TMA (STATIONARY)
EA 2.000 $7,500.000 $529.170 $16,433.830 $15,300.000 $18,000.000
TMA (MOBILE OPERATION)
HR 40.000 $75.000 $264.580 $56.970 $90.000 $50.000
Totals: $7,438,175.256 $7,444,233.300 $8,508,335.156 $9,568,001.550 $10,957,499.024