BURNET SH 71 (0700-01-045)

Items: 114

County: BURNET
Length: N/A
Highway: SH 71
District: AUSTIN
Control Number: 0700-01-045
DBE Goal: N/A
Project: C 700-1-45
Guaranty: N/A
Time: 193 WORKING DAYS
Engineer's Estimate: $8,679,858.73
Date: 11/04/2021 (4 years ago)
Contract Number: N/A
Type: ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (7)
E
Engineer's Estimate
$8,679,858.73
$8,763,188.97
Over/Under Est: 0.96% $83,330.24
Over/Under Est: 6.29% $545,891.34
Amt Left: 5.28% $462,561.10
$10,800,745.43
Over/Under Est: 24.43% $2,120,886.70
Amt Left: 23.25% $2,037,556.46
Delta: -17.07% -$1,574,995.36
$10,899,539.68
Over/Under Est: 25.57% $2,219,680.95
Amt Left: 24.38% $2,136,350.71
Delta: -0.91% -$98,794.25
Over/Under Est: 36.89% $3,201,762.25
Amt Left: 35.59% $3,118,432.01
Delta: -9.01% -$982,081.30
$11,918,673.62
Over/Under Est: 37.31% $3,238,814.89
Amt Left: 36.01% $3,155,484.65
Delta: -0.31% -$37,052.64
Over/Under Est: 38.42% $3,334,680.92
Amt Left: 37.1% $3,251,350.68
Delta: -0.80% -$95,866.03
Subcontractor Percentage Amount
A GREATER AUSTIN DEVELOPMENT COMPANY, INC. 27.72% $3,000,096.05
LONE STAR PAVING COMPANY 17.19% $1,860,449.18
ENVIRONMENTAL SAFETY SERVICES, INC. 9.05% $979,468.59
TEXAS HIGHWAY WALLS 3.30% $357,154.29
JB PINNACLE GROUP, LLC 1.95% $211,045.72
FLASHER EQUIPMENT COMPANY 1.39% $150,437.72
D. I. J. CONSTRUCTION, INC. 1.12% $121,216.00
AUSTIN WOOD RECYCLING 0.42% $45,456.00
HERZOG FOUNDATION DRILLING, INC. 0.14% $15,152.00
HERMANOS STEEL, LLC 0.11% $11,905.14
Total: 62.39% $6,752,380.69

Bid Items & Bid Tabulations

114 Total 0 of 114
BURNET  |  SH 71  |  AUSTIN  |  0700-01-045  |  11/04/2021  |  $8,679,858.73  |  C 700-1-45  |  ROADWAY REHAB/RECON WITH NO ADDE  |  193 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PRODIRT SERVICES, LLC
CAPITAL EXCAVATION COMPANY
HUNTER INDUSTRIES, LTD.
DAN WILLIAMS COMPANY
TEXAS MATERIALS GROUP, INC.
FARIS INDUSTRIES, INC.
AARON CONCRETE CONTRACTORS, L.P.
PREPARING ROW
STA 131.000 $3,000.000 $750.000 $625.000 $739.260 $4,500.000 $4,205.000 $7,176.600 $300.000
REMOVING CONC (RIPRAP)
SY 612.000 $11.000 $20.000 $13.300 $13.320 $16.000 $26.000 $16.970 $36.000
REMOVING CONC (DRIVEWAYS)
SY 760.000 $14.000 $15.000 $34.700 $13.320 $22.000 $26.000 $18.450 $37.000
REMOVING STAB BASE & ASPH PAV (12")
SY 19,060.000 $4.000 $3.200 $8.050 $7.170 $3.500 $12.000 $7.990 $13.000
EXCAVATION (ROADWAY)
CY 21,758.000 $10.000 $8.500 $14.000 $15.600 $22.000 $25.000 $16.940 $12.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 29,567.000 $10.000 $6.000 $17.000 $17.000 $18.000 $25.000 $30.840 $23.000
FURNISHING AND PLACING TOPSOIL (4")
SY 53,549.000 $1.400 $2.000 $3.150 $1.540 $1.300 $1.500 $1.240 $1.500
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 53,549.000 $0.090 $0.270 $0.140 $0.150 $0.140 $0.150 $0.140 $0.300
VEGETATIVE WATERING
MG 90.000 $15.000 $250.000 $28.100 $26.640 $15.000 $20.000 $14.680 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 53,549.000 $1.000 $1.750 $0.800 $1.170 $0.850 $1.500 $1.060 $1.800
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 14,326.000 $46.000 $46.000 $40.500 $68.100 $52.500 $55.000 $54.590 $73.000
PRIME COAT (MULTI OPTION)
GAL 9,881.000 $4.000 $3.750 $3.850 $4.880 $3.700 $4.000 $5.030 $4.600
TOM (ASPHALT) PG 76-22
TON 424.000 $120.000 $110.000 $111.000 $118.530 $112.000 $118.000 $101.360 $134.000
TOM - C (AGGREGATE) SAC - B
TON 6,421.000 $90.000 $109.000 $117.000 $118.530 $112.000 $118.000 $101.360 $134.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 7,428.000 $18.000 $14.750 $16.000 $15.330 $17.500 $25.000 $20.850 $18.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 33,391.000 $1.500 $1.600 $1.600 $1.710 $2.000 $3.000 $2.090 $2.000
CUT & RESTORE ASPH PAVING
SY 194.000 $100.000 $25.000 $75.900 $131.540 $100.000 $230.000 $261.100 $152.000
FLOWABLE BACKFILL
CY 371.400 $240.000 $185.000 $183.000 $190.600 $150.000 $130.000 $165.070 $157.000
FLOWABLE BACKFILL (OPTION 1)
CY 402.000 $250.000 $190.000 $290.000 $190.600 $165.000 $130.000 $330.950 $154.000
TRENCH EXCAVATION PROTECTION
LF 263.000 $8.000 $2.000 $10.800 $54.530 $1.000 $13.000 $12.330 $11.000
TEMPORARY SPL SHORING
SF 13,722.000 $16.000 $15.000 $9.950 $58.350 $25.000 $15.000 $30.000 $43.000
DRILL SHAFT (42 IN)
LF 711.000 $250.000 $155.000 $209.000 $401.560 $405.000 $250.000 $79.900 $140.000
CL C CONC (FOOTING)
CY 236.400 $800.000 $645.000 $710.000 $634.230 $800.000 $760.000 $849.770 $765.000
CL C CONC (RAIL FOUNDATION)
CY 306.000 $415.000 $970.000 $650.000 $634.260 $650.000 $730.000 $815.000 $1,155.000
RETAINING WALL (MSE)
SF 5,269.000 $53.000 $60.000 $64.700 $83.090 $78.000 $65.000 $48.500 $80.000
RETAINING WALL (DRILL SHAFT) (FACIA)
SF 798.000 $50.000 $50.000 $106.000 $151.280 $102.000 $131.000 $95.000 $90.000
RIPRAP (CONC)(5 IN)
CY 1,619.100 $450.000 $600.000 $450.000 $501.980 $515.000 $525.000 $475.570 $725.000
RIPRAP CONC (8 IN)
CY 1,893.000 $352.500 $560.000 $420.000 $422.090 $425.000 $511.000 $399.890 $670.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 36.000 $200.000 $35.000 $138.000 $135.000 $170.000 $430.000 $185.000 $165.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 1,351.000 $158.000 $20.000 $174.000 $145.000 $145.000 $260.000 $137.500 $176.000
RIPRAP (MOW STRIP)(4 IN)
CY 297.300 $430.000 $850.000 $630.000 $485.440 $465.000 $475.000 $459.900 $670.000
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 305.000 $290.000 $50.000 $380.000 $350.000 $260.000 $455.000 $245.000 $425.000
RAIL (TY SSTR)
LF 1,781.000 $50.000 $58.000 $86.000 $62.910 $65.000 $56.000 $127.500 $69.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 485.000 $54.000 $85.000 $94.000 $68.530 $70.000 $61.000 $128.500 $75.000
RAIL (TY SSTR)(MOD)
LF 1,153.000 $70.000 $59.000 $88.000 $64.030 $66.000 $79.000 $127.500 $70.000
CMP (GAL STL 24 IN)
LF 20.000 $100.000 $45.000 $152.000 $155.850 $100.000 $300.000 $77.500 $164.000
CONC BOX CULV (4 FT X 3 FT)
LF 41.000 $260.000 $450.000 $640.000 $609.520 $550.000 $450.000 $485.000 $900.000
CONC BOX CULV (5 FT X 3 FT)
LF 130.000 $325.000 $550.000 $505.000 $482.710 $500.000 $422.000 $535.000 $494.000
RC PIPE (CL III)(18 IN)
LF 460.000 $58.000 $65.000 $69.000 $86.250 $67.000 $103.000 $72.500 $89.000
RC PIPE (CL III)(24 IN)
LF 627.000 $80.000 $80.000 $90.000 $109.340 $75.000 $111.000 $90.000 $110.000
RC PIPE (CL III)(30 IN)
LF 32.000 $95.000 $100.000 $128.000 $169.920 $130.000 $138.000 $115.000 $170.000
RC PIPE (CL III)(36 IN)
LF 315.000 $120.000 $135.000 $165.000 $179.100 $130.000 $169.000 $185.000 $190.000
RC PIPE (CL V)(36 IN)
LF 63.000 $160.000 $240.000 $280.000 $267.970 $300.000 $328.000 $260.000 $283.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 1.000 $6,500.000 $7,500.000 $3,640.000 $4,739.320 $8,500.000 $10,730.000 $4,490.000 $8,900.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $6,500.000 $11,000.000 $5,400.000 $4,739.320 $8,700.000 $16,200.000 $4,490.000 $12,800.000
WINGWALL (FW - S) (HW=4 FT)
EA 1.000 $11,000.000 $13,500.000 $3,130.000 $5,267.080 $12,000.000 $14,000.000 $4,990.000 $15,800.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $14,200.000 $21,000.000 $6,400.000 $11,283.580 $13,000.000 $27,000.000 $10,690.000 $24,300.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $13,000.000 $22,500.000 $11,300.000 $16,835.650 $14,000.000 $30,000.000 $15,950.000 $26,700.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 16.000 $1,500.000 $3,000.000 $1,380.000 $2,315.660 $1,500.000 $1,900.000 $1,350.000 $1,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 18.000 $1,300.000 $3,400.000 $1,910.000 $2,662.940 $1,800.000 $2,100.000 $1,725.000 $1,950.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,500.000 $3,400.000 $1,910.000 $2,695.660 $1,800.000 $2,300.000 $1,650.000 $2,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $2,600.000 $3,900.000 $2,190.000 $3,554.700 $2,100.000 $3,200.000 $1,950.000 $2,260.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 8.000 $4,000.000 $8,000.000 $3,870.000 $5,472.500 $5,000.000 $4,600.000 $3,750.000 $4,420.000
REMOV STR (SET)
EA 42.000 $400.000 $500.000 $240.000 $923.130 $350.000 $325.000 $250.000 $390.000
REMOV STR (HEADWALL)
EA 5.000 $1,300.000 $1,500.000 $2,400.000 $2,577.750 $1,550.000 $1,700.000 $1,653.000 $543.000
REMOV STR (PIPE)
LF 1,182.000 $14.000 $5.000 $9.300 $28.390 $25.000 $20.000 $19.560 $22.000
REMOV STR (BOX CULVERT)
LF 160.000 $65.000 $140.000 $40.050 $104.430 $75.000 $30.000 $25.450 $79.000
MOBILIZATION
LS 1.000 $788,954.130 $250,000.000 $450,000.000 $670,871.120 $1,050,000.000 $1,114,000.000 $1,313,589.170 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $8,000.000 $2,500.000 $6,500.000 $4,912.320 $21,500.000 $6,000.000 $2,579.060 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 464.000 $29.000 $36.000 $33.350 $33.610 $35.000 $31.000 $30.560 $43.000
ROCK FILTER DAMS (REMOVE)
LF 464.000 $10.000 $26.000 $20.000 $14.030 $25.000 $12.000 $12.760 $31.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 266.000 $20.000 $16.000 $17.950 $30.730 $17.000 $30.000 $27.940 $19.000
CONSTRUCTION EXITS (REMOVE)
SY 266.000 $7.000 $12.000 $15.400 $7.480 $11.500 $7.000 $6.800 $14.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,620.000 $2.700 $4.750 $2.900 $3.340 $4.500 $3.500 $3.040 $5.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,620.000 $0.700 $1.500 $0.350 $0.740 $1.250 $0.750 $0.670 $1.500
CONSTRUCTING DETOURS (TY 1)
SY 5,517.000 $55.000 $22.750 $39.150 $46.950 $40.000 $47.320 $69.000 $52.000
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
LF 420.000 $40.000 $100.000 $18.750 $51.120 $35.000 $26.000 $100.000 $36.000
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
LF 420.000 $8.000 $50.000 $18.750 $20.790 $15.000 $28.000 $70.000 $36.000
DRIVEWAYS (CONC)
SY 1,122.000 $70.000 $86.000 $80.000 $87.480 $82.000 $90.000 $89.390 $89.000
DRIVEWAYS (ACP)
SY 2,593.000 $40.000 $48.500 $77.100 $48.360 $60.000 $75.000 $43.870 $76.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,250.000 $21.500 $29.000 $28.400 $27.710 $27.000 $26.000 $27.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,750.000 $2,100.000 $2,080.000 $2,523.550 $2,100.000 $2,600.000 $1,910.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,500.000 $1,500.000 $1,510.000 $1,470.080 $1,500.000 $1,300.000 $1,325.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 5,324.000 $2.000 $3.200 $1.550 $1.500 $2.000 $3.000 $0.900 $3.700
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $200.000 $175.000 $260.000 $250.000 $175.000 $270.000 $175.000 $183.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $2,650.000 $3,500.000 $3,170.000 $3,095.360 $3,200.000 $3,200.000 $2,930.000 $4,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000 $400.000 $300.000 $210.000 $204.780 $225.000 $400.000 $275.000 $304.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $800.000 $900.000 $1,280.000 $1,250.000 $800.000 $520.000 $1,000.000 $1,033.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $20,000.000 $27,000.000 $27,500.000 $25,075.000 $30,000.000 $13,400.000 $26,855.000 $30,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $8,000.000 $9,000.000 $9,300.000 $7,375.000 $8,000.000 $10,000.000 $9,175.000 $10,800.000
PIPE UNDERDRAINS (TY 6) (6")
LF 760.000 $10.000 $5.000 $35.500 $49.990 $22.000 $30.000 $45.000 $94.000
RELOCATE EXISTING MAILBOX
EA 27.000 $525.000 $550.000 $169.000 $165.000 $250.000 $450.000 $500.000 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 30.000 $530.000 $750.000 $610.000 $590.790 $600.000 $600.000 $550.000 $720.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $620.000 $550.000 $730.000 $713.210 $700.000 $675.000 $585.000 $870.000
REMOVE SM RD SN SUP&AM
EA 29.000 $93.000 $100.000 $103.000 $100.000 $50.000 $100.000 $300.000 $120.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 30.000 $20.000 $50.000 $19.950 $19.470 $18.000 $25.000 $25.000 $24.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 5.000 $23.000 $40.000 $20.300 $19.800 $18.000 $30.000 $35.000 $24.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 41,054.000 $0.120 $0.350 $0.250 $0.330 $0.300 $0.280 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 12,559.000 $0.130 $0.360 $0.250 $0.360 $0.330 $0.280 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 65,610.000 $0.200 $0.350 $0.270 $0.330 $0.300 $0.280 $0.280 $0.300
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 16,044.000 $0.700 $0.550 $0.700 $0.550 $0.500 $0.700 $0.630 $0.800
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 23,993.000 $0.700 $0.550 $0.700 $0.550 $0.500 $0.700 $0.630 $0.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 704.000 $0.840 $1.750 $1.050 $1.650 $1.500 $1.500 $0.800 $1.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 172.000 $8.000 $9.500 $7.200 $9.870 $9.000 $9.000 $10.000 $8.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $160.000 $250.000 $159.000 $219.430 $200.000 $160.000 $200.000 $190.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $158.000 $300.000 $190.000 $274.290 $250.000 $190.000 $200.000 $225.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,839.000 $0.420 $0.500 $0.350 $0.530 $0.480 $0.400 $0.400 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,820.000 $0.300 $0.500 $0.350 $0.530 $0.480 $0.400 $0.400 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 27,280.000 $0.330 $0.480 $0.350 $0.470 $0.430 $0.400 $0.380 $0.450
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 27,475.000 $0.600 $1.000 $0.700 $0.880 $0.800 $0.750 $0.620 $0.900
REFL PAV MRKR TY I-C
EA 342.000 $3.500 $7.500 $7.200 $7.680 $7.000 $7.000 $5.000 $8.500
REFL PAV MRKR TY II-A-A
EA 682.000 $3.100 $4.500 $7.200 $4.390 $4.000 $4.000 $5.000 $8.500
ELIM EXT PAV MRK & MRKS (4")
LF 80,844.000 $0.300 $0.100 $0.440 $0.080 $0.070 $0.500 $0.570 $0.500
FULL - WIDTH MOWING
CYC 3.000 $4,000.000 $5,000.000 $1,090.000 $7,000.000 $1,000.000 $4,000.000 $3,500.000 $7,900.000
LITTER REMOVAL
CYC 3.000 $3,000.000 $1,500.000 $1,240.000 $4,401.020 $500.000 $2,700.000 $1,600.000 $4,300.000
D-GR HMA TY-D PG76-22
TON 4,076.000 $76.000 $86.800 $95.000 $89.820 $90.000 $100.000 $99.360 $108.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 1,377.000 $80.000 $94.500 $100.000 $100.860 $98.000 $125.000 $99.550 $118.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 218.000 $80.000 $92.000 $94.600 $100.860 $92.000 $155.000 $132.100 $114.000
UNDERSEAL COURSE
GAL 24,232.000 $3.000 $3.000 $3.000 $3.490 $2.900 $4.000 $3.050 $3.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,000.000 $20,000.000 $10,100.000 $7,841.730 $12,000.000 $14,000.000 $20,000.000 $14,600.000
TMA (STATIONARY)
DAY 50.000 $190.000 $1,250.000 $420.000 $365.950 $200.000 $160.000 $200.000 $1,500.000
TMA (MOBILE OPERATION)
HR 50.000 $75.000 $225.000 $41.610 $230.020 $220.000 $80.000 $100.000 $104.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $1,300.000 $2,500.000 $2,330.000 $5,000.000 $1,000.000 $1,300.000 $3,500.000 $820.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 5.000 $1,700.000 $2,500.000 $2,640.000 $5,000.000 $2,000.000 $2,200.000 $6,400.000 $4,300.000
Totals: $8,679,858.730 $8,763,188.970 $9,225,750.070 $10,800,745.442 $10,899,539.680 $11,881,620.980 $11,918,673.643 $12,014,539.650