|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
16.000
|
$3.000
|
$50.000
|
$4.000
|
$126.000
|
$28.000
|
|
|
|
EMBANKMENT (VEHICLE)(DENS CONT)(TY C)
|
CY
|
284.000
|
$25.000
|
$30.000
|
$25.000
|
$75.000
|
$65.000
|
|
|
|
BACKFILL TY A
|
CY
|
26.000
|
$35.000
|
$50.000
|
$30.000
|
$167.000
|
$160.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
5,471.000
|
$0.500
|
$2.000
|
$5.000
|
$6.500
|
$8.000
|
|
|
|
BLOCK SODDING
|
SY
|
2,917.000
|
$4.000
|
$5.000
|
$5.000
|
$8.500
|
$3.700
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,744.000
|
$0.500
|
$1.000
|
$1.000
|
$0.500
|
$0.110
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,744.000
|
$0.500
|
$1.000
|
$1.000
|
$0.500
|
$0.100
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
5,471.000
|
$1.000
|
$1.000
|
$1.500
|
$1.000
|
$0.500
|
|
|
|
VEGETATIVE WATERING
|
MG
|
168.000
|
$28.000
|
$20.000
|
$10.000
|
$85.000
|
$19.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
2,663.000
|
$2.000
|
$3.000
|
$1.000
|
$2.500
|
$1.000
|
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
20.000
|
$170.000
|
$200.000
|
$150.000
|
$475.000
|
$210.000
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
136.000
|
$100.000
|
$100.000
|
$150.000
|
$165.000
|
$100.000
|
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
192.000
|
$55.000
|
$50.000
|
$110.000
|
$55.000
|
$90.000
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
23.000
|
$300.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
149.000
|
$4.300
|
$5.000
|
$35.000
|
$53.000
|
$80.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,656.000
|
$25.000
|
$5.000
|
$10.000
|
$123.250
|
$50.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
29.000
|
$465.000
|
$600.000
|
$900.000
|
$800.000
|
$610.000
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
24.000
|
$145.000
|
$200.000
|
$160.000
|
$300.000
|
$295.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
165.000
|
$440.000
|
$700.000
|
$650.000
|
$685.000
|
$550.000
|
|
|
|
GABION MATTRESSES (GALV)(9 IN)
|
SY
|
95.000
|
$250.000
|
$150.000
|
$100.000
|
$395.000
|
$70.000
|
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
812.000
|
$67.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
118.000
|
$80.000
|
$100.000
|
$75.000
|
$90.950
|
$170.000
|
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
14.000
|
$100.000
|
$150.000
|
$90.000
|
$192.000
|
$350.000
|
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
46.000
|
$120.000
|
$200.000
|
$110.000
|
$195.000
|
$240.000
|
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
74.000
|
$150.000
|
$300.000
|
$250.000
|
$225.000
|
$205.000
|
|
|
|
CMP (GAL STL 60 IN)
|
LF
|
44.000
|
$200.000
|
$500.000
|
$300.000
|
$261.500
|
$370.000
|
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
2.000
|
$110.000
|
$200.000
|
$90.000
|
$190.000
|
$420.000
|
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
8.000
|
$120.000
|
$300.000
|
$115.000
|
$180.000
|
$300.000
|
|
|
|
CMP AR (GAL STL DES 5)
|
LF
|
43.000
|
$130.000
|
$400.000
|
$170.000
|
$210.000
|
$330.000
|
|
|
|
CMP AR (GAL STL DES 8)
|
LF
|
10.000
|
$160.000
|
$500.000
|
$300.000
|
$760.000
|
$670.000
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
8.000
|
$550.000
|
$700.000
|
$600.000
|
$1,190.000
|
$1,500.000
|
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
42.000
|
$650.000
|
$800.000
|
$750.000
|
$1,450.000
|
$1,500.000
|
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
24.000
|
$100.000
|
$100.000
|
$60.000
|
$95.000
|
$220.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
214.000
|
$60.000
|
$125.000
|
$70.000
|
$62.000
|
$140.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
38.000
|
$60.000
|
$150.000
|
$90.000
|
$125.000
|
$205.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
24.000
|
$100.000
|
$200.000
|
$120.000
|
$145.000
|
$200.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
20.000
|
$120.000
|
$225.000
|
$150.000
|
$160.000
|
$420.000
|
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
12.000
|
$170.000
|
$300.000
|
$345.000
|
$310.000
|
$690.000
|
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
46.000
|
$100.000
|
$300.000
|
$150.000
|
$248.000
|
$400.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,000.000
|
$4,500.000
|
$6,000.000
|
$6,250.000
|
$6,300.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$6,000.000
|
$5,000.000
|
$6,500.000
|
$7,300.000
|
$8,500.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
4.000
|
$7,000.000
|
$8,200.000
|
$7,200.000
|
$7,950.000
|
$7,300.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$9,000.000
|
$10,000.000
|
$9,000.000
|
$10,100.000
|
$14,000.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 60 IN)
|
EA
|
5.000
|
$13,000.000
|
$14,500.000
|
$16,000.000
|
$17,600.000
|
$18,000.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
2.000
|
$6,000.000
|
$5,000.000
|
$6,000.000
|
$6,400.000
|
$7,400.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
1.000
|
$8,000.000
|
$10,000.000
|
$8,500.000
|
$8,850.000
|
$11,000.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
1.000
|
$10,000.000
|
$12,000.000
|
$13,500.000
|
$13,700.000
|
$13,000.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
1.000
|
$14,000.000
|
$17,000.000
|
$18,000.000
|
$18,150.000
|
$16,000.000
|
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
2.000
|
$27,000.000
|
$30,000.000
|
$25,000.000
|
$30,500.000
|
$40,000.000
|
|
|
|
SET (PIPE RUNNER ASSEMBLY)
|
EA
|
2.000
|
$2,220.000
|
$2,000.000
|
$2,500.000
|
$2,300.000
|
$1,200.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
4.000
|
$7,000.000
|
$500.000
|
$7,000.000
|
$7,350.000
|
$6,000.000
|
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$810.000
|
$500.000
|
$650.000
|
$875.000
|
$1,600.000
|
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$800.000
|
$600.000
|
$1,100.000
|
$875.000
|
$1,600.000
|
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
129.000
|
$1,000.000
|
$600.000
|
$800.000
|
$925.000
|
$1,700.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$900.000
|
$650.000
|
$700.000
|
$925.000
|
$1,900.000
|
|
|
|
SET (TY II) (24 IN) (CMP) (3: 1) (C)
|
EA
|
32.000
|
$1,000.000
|
$600.000
|
$1,000.000
|
$1,175.000
|
$2,100.000
|
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
3.000
|
$1,000.000
|
$700.000
|
$1,000.000
|
$1,175.000
|
$2,100.000
|
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$800.000
|
$1,100.000
|
$3,700.000
|
$2,100.000
|
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
27.000
|
$1,300.000
|
$900.000
|
$1,300.000
|
$1,400.000
|
$2,100.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,200.000
|
$1,000.000
|
$1,100.000
|
$1,250.000
|
$2,000.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,300.000
|
$1,000.000
|
$1,200.000
|
$1,375.000
|
$2,000.000
|
|
|
|
SET (TY II) (30 IN) (CMP) (3: 1) (C)
|
EA
|
3.000
|
$1,500.000
|
$800.000
|
$1,200.000
|
$1,300.000
|
$2,300.000
|
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$1,600.000
|
$900.000
|
$1,800.000
|
$1,820.000
|
$3,600.000
|
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,600.000
|
$1,000.000
|
$2,500.000
|
$2,720.000
|
$4,400.000
|
|
|
|
SET (TY II) (30 IN) (HDPE) (6: 1) (P)
|
EA
|
2.000
|
$2,600.000
|
$1,200.000
|
$1,900.000
|
$1,875.000
|
$3,500.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$1,300.000
|
$2,500.000
|
$2,450.000
|
$6,700.000
|
|
|
|
SET (TY II) (36 IN) (CMP) (3: 1) (C)
|
EA
|
3.000
|
$2,900.000
|
$1,500.000
|
$3,300.000
|
$3,550.000
|
$5,400.000
|
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$3,200.000
|
$2,500.000
|
$5,000.000
|
$4,600.000
|
$6,300.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$2,200.000
|
$1,000.000
|
$2,500.000
|
$3,550.000
|
$5,800.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$4,000.000
|
$2,000.000
|
$5,000.000
|
$4,600.000
|
$6,600.000
|
|
|
|
SET (TY II) (DES 3) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
$2,500.000
|
$2,700.000
|
$2,500.000
|
|
|
|
SET (TY II) (DES 3) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,100.000
|
$1,500.000
|
$3,600.000
|
$3,100.000
|
$3,800.000
|
|
|
|
SET (TY II) (DES 4) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$3,500.000
|
$4,500.000
|
$3,300.000
|
|
|
|
SET (TY II) (DES 5) (CMP) (3: 1) (C)
|
EA
|
6.000
|
$3,000.000
|
$2,000.000
|
$6,600.000
|
$6,500.000
|
$5,600.000
|
|
|
|
SET (TY II) (DES 8) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$4,000.000
|
$4,000.000
|
$7,500.000
|
$8,500.000
|
$6,500.000
|
|
|
|
REMOV STR (SET)
|
EA
|
13.000
|
$430.000
|
$500.000
|
$400.000
|
$450.000
|
$500.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,200.000
|
$2,000.000
|
$1,500.000
|
$1,650.000
|
$9,000.000
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
5.000
|
$1,000.000
|
$3,000.000
|
$1,200.000
|
$1,250.000
|
$5,000.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
1,500.000
|
$15.000
|
$10.000
|
$15.000
|
$15.000
|
$20.000
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
48.000
|
$56.000
|
$50.000
|
$80.000
|
$185.000
|
$100.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$124,335.000
|
$125,000.000
|
$100,000.000
|
$339,178.190
|
$240,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$5,000.000
|
$5,000.000
|
$6,000.000
|
$2,102.080
|
$20,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
763.000
|
$30.000
|
$10.000
|
$23.000
|
$35.000
|
$31.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
763.000
|
$8.500
|
$1.000
|
$8.000
|
$10.000
|
$9.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
815.000
|
$3.500
|
$3.000
|
$3.000
|
$3.550
|
$2.500
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
815.000
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
$0.600
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,125.000
|
$21.000
|
$40.000
|
$31.000
|
$25.000
|
$21.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,800.000
|
$2,000.000
|
$1,700.000
|
$1,800.000
|
$2,400.000
|
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$900.000
|
$2,500.000
|
$1,100.000
|
$1,500.000
|
$1,000.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
875.000
|
$2.750
|
$5.000
|
$4.000
|
$4.500
|
$2.500
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,600.000
|
$400.000
|
$2,900.000
|
$2,950.000
|
$2,700.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$270.000
|
$500.000
|
$700.000
|
$500.000
|
$320.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$440.000
|
$600.000
|
$550.000
|
$675.000
|
$550.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$470.000
|
$600.000
|
$650.000
|
$500.000
|
$650.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$80.000
|
$300.000
|
$80.000
|
$175.000
|
$80.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
79.000
|
$16.000
|
$50.000
|
$20.000
|
$35.000
|
$17.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
8.000
|
$63.000
|
$100.000
|
$90.000
|
$85.000
|
$65.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
79.000
|
$23.000
|
$100.000
|
$27.000
|
$50.000
|
$27.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
53.000
|
$96.000
|
$150.000
|
$120.000
|
$85.000
|
$37.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
80.000
|
$0.320
|
$25.000
|
$3.000
|
$2.500
|
$0.300
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
72.000
|
$0.320
|
$25.000
|
$3.000
|
$2.500
|
$0.310
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4.000
|
$3.000
|
$60.000
|
$5.000
|
$20.000
|
$3.000
|
|
|
|
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
|
LF
|
120.000
|
$22.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,000.000
|
$275.000
|
$8,000.000
|
$25,000.000
|
$20,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
180.000
|
$160.000
|
$375.000
|
$100.000
|
$380.000
|
$200.000
|
|
1
|
|
FLOWABLE BACKFILL
|
CY
|
5.000
|
$300.000
|
$300.000
|
$180.000
|
$250.000
|
$170.000
|
|
1
|
|
CMP (GAL STL 18 IN)
|
LF
|
932.000
|
$67.000
|
$85.000
|
$60.000
|
$61.500
|
$120.000
|
|
Totals: |
$1,432,201.090
|
$1,378,418.000
|
$1,468,583.500
|
$2,277,669.930
|
$2,373,099.960
|