Show Job Controls
Bid Cobra

BROWN VARIOUS (0923-00-067)

Items: 41

County: BROWN
Length: 1.0000 MILES
Highway: VARIOUS
District: BROWNWOOD
Control Number: 0923-00-067
DBE Goal: 0.0%
Project: C 923-00-67
Guaranty: $38,000.00
Time: 94 WORKING DAYS
Engineer's Estimate: $1,904,239.42
Date: 09/05/2024 (1 year ago)
Contract Number: 9243034
Type: PREVENTIVE MAINTENANCE
Project ID: A00176103
Project Description: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
JASON SCANTLING
JORDAN PERRY
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$1,904,239.42
Over/Under Est: -15.58% -$296,594.27
Over/Under Est: -10.71% -$203,943.42
Amt Left: 5.76% $92,650.85
$1,911,312.25
Over/Under Est: 0.37% $7,072.83
Amt Left: 18.89% $303,667.10
Delta: -12.41% -$211,016.25
Over/Under Est: 21.38% $407,129.33
Amt Left: 43.77% $703,723.60
Delta: -20.93% -$400,056.50
Over/Under Est: 23.11% $440,075.33
Amt Left: 45.82% $736,669.60
Delta: -1.43% -$32,946.00
Over/Under Est: 33.51% $638,019.33
Amt Left: 58.14% $934,613.60
Delta: -8.44% -$197,944.00

Bid Items & Bid Tabulations

41 Total 0 of 41
BROWN  |  VARIOUS  |  BROWNWOOD  |  0923-00-067  |  09/05/2024  |  $1,904,239.42  |  C 923-00-67  |  PREVENT MAINT  |  94 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
STRUCTURAL INTEGRITY GROUP LLC
AAD CONTRACTING INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
SCR CIVIL CONSTRUCTION, LLC
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 2.000 $2,500.000 $2,383.000 $1,750.000 $1,500.000 $2,000.000 $5,000.000 $40,000.000
EXCAV (CHANNEL)
CY 58.000 $125.200 $247.000 $220.000 $20.000 $200.000 $192.000 $140.000
EMBANK (FNL)(OC)(TY C)
CY 1,700.000 $50.000 $82.000 $70.000 $50.000 $25.000 $62.000 $5.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 1,400.000 $2.000 $1.000 $1.000 $1.500 $5.000 $1.200 $1.000
FLOWABLE BACKFILL
CY 102.000 $1,225.000 $559.000 $550.000 $275.000 $400.000 $800.000 $360.000
TEMPORARY SPL SHORING
SF 680.000 $84.600 $27.000 $70.000 $33.000 $250.000 $100.000 $10.000
CL C CONC(PILE ENCASEMENT)
LF 9.250 $1,715.900 $2,517.000 $2,500.000 $5,000.000 $2,000.000 $1,300.000 $850.000
CL C CONC (MISC)
CY 17.500 $3,000.000 $3,998.000 $8,900.000 $900.000 $850.000 $5,410.000 $3,000.000
CL C CONC (WINGWALLS)
CY 16.800 $3,206.000 $4,374.000 $5,500.000 $1,000.000 $2,500.000 $6,850.000 $3,200.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 184.000 $121.250 $98.000 $50.000 $9.000 $20.000 $200.000 $25.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 32.000 $256.250 $184.000 $145.000 $80.000 $325.000 $400.000 $150.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 542.000 $320.000 $201.000 $265.000 $250.000 $275.000 $425.000 $150.000
CONC STR REPAIR (PAN GIRDER HOLE REPR)
EA 107.000 $200.000 $125.000 $90.000 $200.000 $350.000 $550.000 $125.000
RIPRAP (CONC)(5 IN)
CY 25.200 $1,200.000 $621.000 $1,300.000 $300.000 $800.000 $1,600.000 $775.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 60.000 $353.330 $301.000 $290.000 $180.000 $250.000 $360.000 $280.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 283.000 $397.140 $369.000 $290.000 $220.000 $275.000 $360.000 $260.000
RIPRAP (STONE PROTECTION)(36 IN)
CY 402.500 $421.400 $342.000 $290.000 $300.000 $300.000 $360.000 $260.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 351.750 $72.260 $34.000 $68.000 $75.000 $65.000 $45.000 $55.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 1,062.000 $74.200 $28.000 $83.000 $95.000 $65.000 $50.000 $50.000
WATERPROOFING (TY 10)
SY 12.000 $200.000 $88.000 $50.000 $120.000 $25.000 $200.000 $185.000
SET (TY I)(S= 8 FT)(HW= 10 FT)(3:1)(C)
EA 4.000 $30,000.000 $27,932.000 $15,000.000 $22,000.000 $125,000.000 $73,660.000 $25,000.000
CLEAN EXIST CULVERTS
CY 89.000 $191.250 $155.000 $325.000 $200.000 $2,500.000 $280.000 $250.000
RAISING EXIST STRUCT (REF NO. 1)
EA 1.000 $12,500.000 $43,280.000 $33,000.000 $125,000.000 $100,000.000 $19,400.000 $100,000.000
RAISING EXIST STRUCT (REF NO. 2)
EA 1.000 $12,500.000 $43,280.000 $39,000.000 $125,000.000 $100,000.000 $19,400.000 $100,000.000
ADJUST STL SHOES
EA 1.000 $12,000.000 $11,483.000 $10,000.000 $2,000.000 $10,000.000 $9,000.000 $40,000.000
MOBILIZATION
LS 1.000 $190,000.000 $160,769.000 $190,000.000 $250,000.000 $150,000.000 $233,900.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $17,000.000 $13,286.000 $12,500.000 $10,000.000 $3,500.000 $13,200.000 $30,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 5.000 $354.170 $139.000 $150.000 $350.000 $100.000 $300.000 $650.000
TMA (STATIONARY)
DAY 121.000 $315.170 $377.000 $1.000 $350.000 $300.000 $500.000 $345.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 900.000 $5.000 $4.000 $1.000 $4.000 $5.000 $12.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 900.000 $2.000 $2.000 $1.000 $1.000 $2.000 $3.000 $2.000
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $4.000 $4.000 $10.000 $4.000 $7.000 $30.000 $5.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $100.000 $173.000 $900.000 $90.000 $50.000 $300.000 $450.000
DRIFTWOOD REMOVAL
CY 4.500 $2,200.000 $1,132.000 $750.000 $200.000 $1,000.000 $500.000 $1,000.000
REPLACE(STEEL RAIL)
LF 60.000 $400.000 $307.000 $325.000 $300.000 $100.000 $330.000 $300.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 25.000 $1,360.100 $570.000 $420.000 $200.000 $350.000 $1,000.000 $750.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 79.000 $125.000 $122.000 $130.000 $95.000 $115.000 $210.000 $250.000
STEEL BRIDGE ZONE PAINTING REF STR #2
EA 1.000 $38,250.000 $21,444.000 $29,750.000 $30,000.000 $33,000.000 $39,200.000 $150,000.000
STEEL BRIDGE ZONE PAINTING REF STR #3
EA 1.000 $38,250.000 $21,444.000 $31,350.000 $30,000.000 $33,000.000 $39,200.000 $150,000.000
STEEL BRIDGE ZONE PAINTING REF STR #4
EA 1.000 $89,250.000 $93,428.000 $58,500.000 $230,000.000 $130,000.000 $149,000.000 $268,500.000
STEEL BRIDGE ZONE PAINTING REF STR #5
EA 1.000 $76,500.000 $39,292.000 $51,000.000 $160,000.000 $60,000.000 $67,190.000 $268,500.000
Totals: $1,904,239.420 $1,607,645.150 $1,700,296.000 $1,911,312.250 $2,311,368.750 $2,344,314.750 $2,542,258.750