Job Info for 0923-00-067

County: BROWN Highway: VA Date: 09/05/2024 (2 months ago) Engineer's Estimate: $1,904,239 Control Number: 0923-00-067
Project: C 923-00-67 District: BROWNWOOD Time: 94 WORKING DAYS Type: PREVENTIVE MAINTENANCE
Bidder's List

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,904,239.42
SCOTT TUCKER CONSTRUCTION COMPANY, LLC   $1,607,645.15 1
-15.58% | -$296,594.27
STRUCTURAL INTEGRITY GROUP LLC   $1,700,296.00 2
-10.71% | -$203,943.42
5.76% | $92,650.85
AAD CONTRACTING INC.   $1,911,312.25 3
0.37% | $7,072.83
18.89% | $303,667.10
12.41% | $211,016.25
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC   $2,311,368.75 4
21.38% | $407,129.33
43.77% | $703,723.60
20.93% | $400,056.50
SCR CIVIL CONSTRUCTION, LLC   $2,344,314.75 5
23.11% | $440,075.33
45.82% | $736,669.60
1.43% | $32,946.00
RAGLE CONSTRUCTION, INC.   $2,542,258.75 6
33.51% | $638,019.33
58.14% | $934,613.60
8.44% | $197,944.00

Bid Items

Items: 41, 0 filtered
BROWN VA  |  BROWNWOOD  |  0923-00-067  |  09/05/2024  |  $1,904,239  |  C 923-00-67  |  PREVENT MAINT  |  94 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate SCOTT TUCKER CONSTRUCTION COMPANY, LLC STRUCTURAL INTEGRITY GROUP LLC AAD CONTRACTING INC. BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC SCR CIVIL CONSTRUCTION, LLC RAGLE CONSTRUCTION, INC.
100 7002 PREPARING ROW STA 2.000 $2,500.000 $2,383.000 $1,750.000 $1,500.000 $2,000.000 $5,000.000 $40,000.000
110 7002 EXCAV (CHANNEL) CY 58.000 $125.200 $247.000 $220.000 $20.000 $200.000 $192.000 $140.000
132 7005 EMBANK (FNL)(OC)(TY C) CY 1,700.000 $50.000 $82.000 $70.000 $50.000 $25.000 $62.000 $5.000
164 7007 BROADCAST SEED (TEMP_WARM_COOL) SY 1,400.000 $2.000 $1.000 $1.000 $1.500 $5.000 $1.200 $1.000
401 7001 FLOWABLE BACKFILL CY 102.000 $1,225.000 $559.000 $550.000 $275.000 $400.000 $800.000 $360.000
403 7001 TEMPORARY SPL SHORING SF 680.000 $84.600 $27.000 $70.000 $33.000 $250.000 $100.000 $10.000
420 7059 CL C CONC(PILE ENCASEMENT) LF 9.250 $1,715.900 $2,517.000 $2,500.000 $5,000.000 $2,000.000 $1,300.000 $850.000
420 7067 CL C CONC (MISC) CY 17.500 $3,000.000 $3,998.000 $8,900.000 $900.000 $850.000 $5,410.000 $3,000.000
420 7146 CL C CONC (WINGWALLS) CY 16.800 $3,206.000 $4,374.000 $5,500.000 $1,000.000 $2,500.000 $6,850.000 $3,200.000
428 7001 PENETRATING CONCRETE SURFACE TREATMENT SY 184.000 $121.250 $98.000 $50.000 $9.000 $20.000 $200.000 $25.000
429 7001 CONC STR REPAIR(CLEAN & COAT WTH EPOXY) SF 32.000 $256.250 $184.000 $145.000 $80.000 $325.000 $400.000 $150.000
429 7007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 542.000 $320.000 $201.000 $265.000 $250.000 $275.000 $425.000 $150.000
429 7010 CONC STR REPAIR (PAN GIRDER HOLE REPR) EA 107.000 $200.000 $125.000 $90.000 $200.000 $350.000 $550.000 $125.000
432 7002 RIPRAP (CONC)(5 IN) CY 25.200 $1,200.000 $621.000 $1,300.000 $300.000 $800.000 $1,600.000 $775.000
432 7041 RIPRAP (STONE PROTECTION)(12 IN) CY 60.000 $353.330 $301.000 $290.000 $180.000 $250.000 $360.000 $280.000
432 7045 RIPRAP (STONE PROTECTION)(24 IN) CY 283.000 $397.140 $369.000 $290.000 $220.000 $275.000 $360.000 $260.000
432 7048 RIPRAP (STONE PROTECTION)(36 IN) CY 402.500 $421.400 $342.000 $290.000 $300.000 $300.000 $360.000 $260.000
438 7004 CLEANING AND SEALING EXIST JOINTS (CL3) LF 351.750 $72.260 $34.000 $68.000 $75.000 $65.000 $45.000 $55.000
438 7007 CLEANING AND SEALING EXIST JOINTS (CL7) LF 1,062.000 $74.200 $28.000 $83.000 $95.000 $65.000 $50.000 $50.000
458 7007 WATERPROOFING (TY 10) SY 12.000 $200.000 $88.000 $50.000 $120.000 $25.000 $200.000 $185.000
467 7199 SET (TY I)(S= 8 FT)(HW= 10 FT)(3:1)(C) EA 4.000 $30,000.000 $27,932.000 $15,000.000 $22,000.000 $125,000.000 $73,660.000 $25,000.000
480 7002 CLEAN EXIST CULVERTS CY 89.000 $191.250 $155.000 $325.000 $200.000 $2,500.000 $280.000 $250.000
495 7003 RAISING EXIST STRUCT (REF NO. 1) EA 1.000 $12,500.000 $43,280.000 $33,000.000 $125,000.000 $100,000.000 $19,400.000 $100,000.000
495 7004 RAISING EXIST STRUCT (REF NO. 2) EA 1.000 $12,500.000 $43,280.000 $39,000.000 $125,000.000 $100,000.000 $19,400.000 $100,000.000
499 7001 ADJUST STL SHOES EA 1.000 $12,000.000 $11,483.000 $10,000.000 $2,000.000 $10,000.000 $9,000.000 $40,000.000
500 7001 MOBILIZATION LS 1.000 $190,000.000 $160,769.000 $190,000.000 $250,000.000 $150,000.000 $233,900.000 $400,000.000
502 7001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $17,000.000 $13,286.000 $12,500.000 $10,000.000 $3,500.000 $13,200.000 $30,000.000
503 7001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 5.000 $354.170 $139.000 $150.000 $350.000 $100.000 $300.000 $650.000
505 7001 TMA (STATIONARY) DAY 121.000 $315.170 $377.000 $1.000 $350.000 $300.000 $500.000 $345.000
506 7039 TEMP SEDMT CONT FENCE (INSTALL) LF 900.000 $5.000 $4.000 $1.000 $4.000 $5.000 $12.000 $3.000
506 7041 TEMP SEDMT CONT FENCE (REMOVE) LF 900.000 $2.000 $2.000 $1.000 $1.000 $2.000 $3.000 $2.000
542 7001 REMOVE METAL BEAM GUARD FENCE LF 350.000 $4.000 $4.000 $10.000 $4.000 $7.000 $30.000 $5.000
658 7056 INSTL OM ASSM (OM-2Y)(WC)GND EA 4.000 $100.000 $173.000 $900.000 $90.000 $50.000 $300.000 $450.000
735 7060 DRIFTWOOD REMOVAL CY 4.500 $2,200.000 $1,132.000 $750.000 $200.000 $1,000.000 $500.000 $1,000.000
776 7024 REPLACE(STEEL RAIL) LF 60.000 $400.000 $307.000 $325.000 $300.000 $100.000 $330.000 $300.000
778 7004 CONCRETE RAIL REPLACEMENT (IN-KIND) LF 25.000 $1,360.100 $570.000 $420.000 $200.000 $350.000 $1,000.000 $750.000
780 7002 CNC CRACK REPAIR (DISCRETE)(INJECT) LF 79.000 $125.000 $122.000 $130.000 $95.000 $115.000 $210.000 $250.000
4010 7003 STEEL BRIDGE ZONE PAINTING REF STR #2 EA 1.000 $38,250.000 $21,444.000 $29,750.000 $30,000.000 $33,000.000 $39,200.000 $150,000.000
4010 7004 STEEL BRIDGE ZONE PAINTING REF STR #3 EA 1.000 $38,250.000 $21,444.000 $31,350.000 $30,000.000 $33,000.000 $39,200.000 $150,000.000
4010 7005 STEEL BRIDGE ZONE PAINTING REF STR #4 EA 1.000 $89,250.000 $93,428.000 $58,500.000 $230,000.000 $130,000.000 $149,000.000 $268,500.000
4010 7006 STEEL BRIDGE ZONE PAINTING REF STR #5 EA 1.000 $76,500.000 $39,292.000 $51,000.000 $160,000.000 $60,000.000 $67,190.000 $268,500.000
Totals: $1,904,239.42 $1,607,645.15 $1,700,296.00 $1,911,312.25 $2,311,368.75 $2,344,314.75 $2,542,258.75