Job Info for 0128-01-116

County: BROWN Highway: US 377 Date: 07/02/2021 (3 years ago) Engineer's Estimate: $968,535 Control Number: 0128-01-116
Project: F 2021(450)HES District: BROWNWOOD Time: 132 WORKING DAYS Type: SAFETY TREAT FIXED OBJECTS & RUMBLE STRIPS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $968,534.63
3LW CIVIL LLC   $991,311.02 1
2.35% | $22,776.39
ODUM SERVICES, LLC   $1,115,853.05 2
15.21% | $147,318.42
12.56% | $124,542.03
HJC FARMS, INC.   $1,120,496.90 3
15.69% | $151,962.27
13.03% | $129,185.88
0.42% | $4,643.85
DIGG COMMERCIAL, LLC   $1,160,321.04 4
19.8% | $191,786.41
17.05% | $169,010.02
3.55% | $39,824.14
SJ&J CONSTRUCTION, LLC   $1,240,522.05 5
28.08% | $271,987.42
25.14% | $249,211.03
6.91% | $80,201.01

Bid Items

Items: 33, 0 filtered
BROWN US 377  |  BROWNWOOD  |  0128-01-116  |  07/02/2021  |  $968,535  |  F 2021(450)HES  |  SAFETY TREAT FIXED OBJECTS & RUMBLE STRIPS  |  132 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate 3LW CIVIL LLC ODUM SERVICES, LLC HJC FARMS, INC. DIGG COMMERCIAL, LLC SJ&J CONSTRUCTION, LLC
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 123.000 $70.000 $5.000 $30.000 $85.000 $92.000 $15.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 1,519.000 $0.810 $0.100 $1.000 $0.200 $3.000 $1.000
168 6001 VEGETATIVE WATERING MG 8.400 $15.000 $1.000 $10.000 $8.350 $120.000 $10.000
216 6001 PROOF ROLLING HR 20.000 $49.710 $10.000 $90.000 $300.000 $180.000 $50.000
432 6002 RIPRAP (CONC)(5 IN) CY 1.900 $450.000 $500.000 $800.000 $1,075.000 $1,800.000 $900.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 321.090 $440.000 $500.000 $550.000 $577.500 $600.000 $600.000
462 6005 CONC BOX CULV (4 FT X 4 FT) LF 6.000 $465.000 $600.000 $850.000 $1,075.000 $1,123.000 $600.000
467 6148 SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C) EA 1.000 $7,500.000 $14,000.000 $20,000.000 $13,000.000 $14,000.000 $10,000.000
500 6001 MOBILIZATION LS 1.000 $85,000.000 $100,000.000 $95,000.000 $50,000.000 $100,000.000 $100,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $7,500.000 $10,000.000 $3,200.000 $2,500.000 $4,500.000 $6,000.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 500.000 $2.790 $0.750 $3.000 $5.000 $5.000 $3.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 500.000 $0.780 $0.500 $1.000 $1.000 $1.000 $1.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 164,540.000 $0.200 $0.100 $0.200 $0.150 $0.150 $0.500
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 82,270.000 $0.200 $0.100 $0.200 $0.150 $0.170 $0.500
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 12,650.000 $24.000 $25.000 $28.250 $32.500 $25.000 $29.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $1,800.000 $2,150.000 $2,110.000 $2,450.000 $2,000.000 $1,700.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 3.000 $1,200.000 $1,300.000 $1,400.000 $1,550.000 $1,988.000 $1,200.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 600.000 $58.940 $65.000 $90.000 $64.000 $64.000 $72.000
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 4.000 $432.900 $1,025.000 $1,100.000 $1,825.000 $1,400.000 $1,400.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 8,637.500 $2.000 $1.000 $2.500 $3.000 $5.000 $4.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 57.000 $2,600.000 $2,500.000 $2,500.000 $3,225.000 $3,150.000 $2,900.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 136.000 $25.000 $15.000 $45.000 $32.000 $32.000 $25.000
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 1.000 $45.000 $35.000 $60.000 $66.500 $120.000 $90.000
666 6034 REFL PAV MRK TY I (W)8"(SLD)(060MIL) LF 535.000 $1.000 $0.500 $3.000 $0.550 $0.900 $1.250
666 6298 RE PM W/RET REQ TY I (W)4"(BRK)(060MIL) LF 1,622.000 $0.270 $0.220 $0.750 $0.250 $0.330 $1.250
666 6301 RE PM W/RET REQ TY I (W)4"(SLD)(060MIL) LF 164,540.000 $0.200 $0.220 $0.350 $0.250 $0.320 $0.350
666 6310 RE PM W/RET REQ TY I (Y)4"(BRK)(060MIL) LF 16,006.000 $0.250 $0.220 $0.500 $0.210 $0.320 $0.500
666 6313 RE PM W/RET REQ TY I (Y)4"(SLD)(060MIL) LF 76,088.000 $0.250 $0.220 $0.350 $0.210 $0.320 $0.350
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 2.000 $300.000 $200.000 $300.000 $245.000 $300.000 $230.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 2.000 $300.000 $293.000 $300.000 $305.000 $350.000 $300.000
672 6007 REFL PAV MRKR TY I-C EA 82.000 $3.600 $3.600 $5.000 $3.500 $5.000 $4.000
672 6009 REFL PAV MRKR TY II-A-A EA 1,752.000 $3.100 $3.600 $4.000 $3.500 $4.000 $4.000
6185 6002 TMA (STATIONARY) DAY 152.000 $115.500 $50.000 $150.000 $150.000 $290.000 $100.000
Totals: $968,534.63 $991,311.02 $1,115,853.05 $1,120,496.91 $1,160,321.04 $1,240,522.05