BROWN US 377 (0128-01-111)

Items: 132

County: BROWN
Length: N/A
Highway: US 377
District: BROWNWOOD
Control Number: 0128-01-111
DBE Goal: N/A
Project: F 2022(487)
Guaranty: N/A
Time: 149 WORKING DAYS
Engineer's Estimate: $3,427,369.24
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$3,427,369.24
$4,045,900.20
Over/Under Est: 18.05% $618,530.96
Over/Under Est: 27.96% $958,337.90
Amt Left: 8.4% $339,806.94
$4,550,217.96
Over/Under Est: 32.76% $1,122,848.72
Amt Left: 12.46% $504,317.76
Delta: -3.75% -$164,510.82
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 12.42% $502,500.80
WILLIS ELECTRIC CO., LP 9.05% $366,153.97
GRIDER PAVING LLC 8.62% $348,756.60
D. I. J. CONSTRUCTION, INC. 3.61% $146,057.00
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 2.30% $93,055.70
TEXOP CONSTRUCTION 1.80% $72,826.20
CONTRACTORS SERVICE, LTD. 0.84% $33,985.56
HJC FARMS, INC. 0.67% $27,107.53
DALLAS LITE AND BARRICADE, INC. 0.02% $809.18
FUSION COMMUNICATIONS, LLC 0.00% $0.00
Total: 39.33% $1,591,252.54

Bid Items & Bid Tabulations

132 Total 0 of 132
BROWN  |  US 377  |  BROWNWOOD  |  0128-01-111  |  05/05/2022  |  $3,427,369.24  |  F 2022(487)  |  REHAB EXIST ROADWAY  |  149 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PRATER DIRT WORK LLC
FOUTSCO PAVING COMPANY, LLC
A. L. HELMCAMP, INC.
PREPARING ROW
STA 1.000 $5,000.000 $25,000.000 $1,000.000 $55,000.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 9.000 $1,000.000 $2,500.000 $2,000.000 $900.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 1.000 $4,500.000 $5,000.000 $5,000.000 $3,900.000
PREP ROW (TREE PRUNING)
EA 3.000 $1,500.000 $5,000.000 $20,000.000 $1,400.000
REMOVING CONC (FOUNDATIONS)
SY 1.050 $1,000.000 $1,000.000 $1,500.000 $1,400.000
REMOVING CONC (DRIVEWAYS)
SY 365.000 $20.000 $100.000 $16.000 $50.000
REMOVING CONC (RETAINING WALLS)
SY 15.000 $50.000 $100.000 $700.000 $275.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 3,507.000 $15.000 $15.000 $20.000 $25.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 1,418.000 $15.000 $15.000 $17.000 $28.000
EXCAVATION (ROADWAY)
CY 3,163.000 $20.000 $32.000 $80.000 $45.000
EXCAVATION (SPECIAL)
CY 37.000 $50.000 $60.000 $100.000 $65.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 75.000 $15.000 $100.000 $150.000 $60.000
FURNISHING AND PLACING TOPSOIL
CY 34.000 $65.000 $120.000 $120.000 $60.000
BLOCK SODDING
SY 368.000 $12.000 $120.000 $15.000 $11.000
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 463.000 $5.000 $6.000 $6.000 $5.600
IRRIGATION SYSTEM
LS 1.000 $7,000.000 $14,500.000 $20,000.000 $14,000.000
PLANT MATERIAL (3-GAL)
EA 71.000 $20.000 $80.000 $100.000 $75.000
PLANT MATERIAL (5-GAL)
EA 18.000 $35.000 $160.000 $200.000 $145.000
PLANT MATERIAL (15-GAL)
EA 6.000 $125.000 $750.000 $700.000 $660.000
LANDSCAPE EDGE
LF 216.000 $20.000 $30.000 $30.000 $60.000
PLANT BED PREPARATION
SY 164.000 $5.000 $125.000 $150.000 $110.000
PLANT MATERIAL (30 GAL) (TREE)
EA 3.000 $300.000 $1,300.000 $1,400.000 $1,100.000
PROOF ROLLING
HR 12.000 $120.000 $500.000 $125.000 $100.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 128.000 $80.000 $100.000 $275.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $75.000 $138.000 $100.000 $93.000
PLANE ASPH CONC PAV (2")
SY 75,152.000 $1.750 $2.200 $1.500 $3.000
FLOWABLE BACKFILL
CY 31.000 $250.000 $210.000 $250.000 $220.000
DRILL SHAFT (24 IN)
LF 30.000 $180.000 $300.000 $250.000 $270.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 52.000 $320.000 $500.000 $415.000 $440.000
CL C CONC (COLLAR)
EA 12.000 $1,300.000 $1,350.000 $2,000.000 $1,400.000
RETAINING WALL (CAST - IN - PLACE)
SF 411.000 $75.000 $70.000 $80.000 $68.000
RETAINING WALL (SPECIAL)
SF 921.000 $100.000 $70.000 $80.000 $145.000
RIPRAP (CONC)(4 IN)
CY 1.000 $600.000 $1,600.000 $2,000.000 $2,000.000
RC PIPE (CL III)(18 IN)
LF 78.500 $75.000 $110.000 $120.000 $110.000
INLET (COMPL)(CURB)(TY C)
EA 6.000 $4,500.000 $4,900.000 $5,000.000 $5,500.000
INLET(COMPL)(EXT)(TY E)
EA 3.000 $2,000.000 $3,800.000 $4,000.000 $3,800.000
ADJUSTING INLET (CAP)
EA 3.000 $2,500.000 $3,000.000 $3,000.000 $3,000.000
REMOV STR (INLET)
EA 3.000 $750.000 $1,000.000 $1,000.000 $1,000.000
REMOV STR (PIPE)
LF 10.500 $15.000 $35.000 $50.000 $35.000
MOBILIZATION
LS 1.000 $271,418.150 $145,000.000 $420,000.000 $440,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $10,000.000 $6,000.000 $4,500.000 $18,000.000
SANDBAGS FOR EROSION CONTROL
EA 40.000 $7.000 $49.000 $4.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $2.500 $10.000 $12.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $1.000 $3.000 $1.000 $1.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $5.000 $10.000 $10.000 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.000 $3.000 $1.000 $1.100
COLORED TEXTURED CONC (4")
SY 409.000 $85.000 $115.000 $130.000 $120.000
LANDSCAPE PAVERS
SY 4.000 $85.000 $105.000 $250.000 $110.000
CONC CURB & GUTTER (TY I)
LF 286.000 $30.000 $45.000 $55.000 $48.000
CONC CURB & GUTTER (TY II)
LF 2,239.000 $45.000 $45.000 $55.000 $48.000
INTERSECTIONS (ACP)
SY 374.000 $50.000 $50.000 $150.000 $68.000
DRIVEWAYS (CONC)
SY 148.500 $95.000 $99.000 $150.000 $100.000
CONC SIDEWALKS (4")
SY 1,120.000 $80.000 $70.000 $80.000 $68.000
CONC SIDEWALKS (6")
SY 580.000 $110.000 $72.000 $100.000 $75.000
CURB RAMPS (TY 1)
EA 8.000 $2,200.000 $1,900.000 $2,000.000 $2,000.000
CURB RAMPS (TY 2)
EA 5.000 $1,950.000 $2,000.000 $3,000.000 $2,100.000
CURB RAMPS (TY 7)
EA 4.000 $2,200.000 $1,900.000 $4,000.000 $2,000.000
CURB RAMPS (TY 10)
EA 5.000 $2,500.000 $2,200.000 $3,000.000 $2,300.000
CONCRETE SIDEWALK (STEPS)
SY 1.600 $500.000 $1,100.000 $2,000.000 $1,100.000
CONDT (PVC) (SCH 40) (2")
LF 245.000 $15.000 $30.000 $30.000 $32.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 285.000 $25.000 $30.000 $30.000 $32.000
CONDT (PVC) (SCH 40) (3")
LF 320.000 $17.000 $35.000 $35.000 $37.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 285.000 $30.000 $35.000 $50.000 $37.000
ELEC CONDR (NO.6) BARE
LF 1,405.000 $2.250 $2.000 $3.000 $2.200
ELEC CONDR (NO.6) INSULATED
LF 220.000 $1.750 $2.500 $3.000 $2.700
TRAY CABLE (4 CONDR) (12 AWG)
LF 2,460.000 $4.500 $5.000 $5.000 $5.500
GROUND BOX TY D (162922)W/APRON
EA 6.000 $1,250.000 $2,100.000 $1,600.000 $2,300.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $5,000.000 $8,500.000 $8,500.000 $9,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $500.000 $150.000 $700.000 $910.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 6.000 $500.000 $700.000 $500.000 $640.000
REMOVE SM RD SN SUP&AM
EA 16.000 $100.000 $700.000 $50.000 $130.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 5,648.000 $45.000 $3.000 $1.000 $0.450
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 168.000 $1.200 $3.000 $2.000 $0.450
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 5,372.000 $0.200 $2.000 $1.000 $0.450
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 751.000 $0.550 $6.000 $1.000 $0.800
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 156.000 $6.000 $14.000 $7.000 $17.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 22.000 $70.000 $125.000 $120.000 $270.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 12.000 $84.000 $125.000 $150.000 $290.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 3,491.000 $0.240 $3.500 $1.000 $0.450
WK ZN PAV MRK REMOV (W)(ARROW)
EA 6.000 $250.000 $224.000 $500.000 $550.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 2.000 $300.000 $300.000 $800.000 $550.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,220.000 $1.300 $2.000 $1.000 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,050.000 $1.200 $2.000 $1.000 $0.650
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,895.000 $1.000 $1.150 $1.000 $0.850
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,012.000 $7.000 $9.250 $7.000 $7.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 7,985.000 $0.500 $0.650 $0.500 $0.560
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 13,714.000 $0.500 $0.590 $0.500 $0.560
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,650.000 $0.500 $0.650 $0.600 $0.560
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 24,127.000 $0.500 $0.590 $0.500 $0.560
PREFAB PAV MRK TY B (W)(U-LT ARROW)
EA 1.000 $400.000 $1,200.000 $600.000 $4,000.000
PREFAB PAV MRK TY B (W)(RR XING)
EA 8.000 $800.000 $1,800.000 $2,000.000 $2,200.000
PREFAB PAV MRK TY B (W)(18")(YLD TRI)
EA 8.000 $200.000 $110.000 $70.000 $82.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 7.000 $250.000 $250.000 $275.000 $290.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $275.000 $370.000 $350.000 $290.000
REFL PAV MRKR TY I-C
EA 408.000 $4.000 $8.500 $5.000 $5.500
REFL PAV MRKR TY II-A-A
EA 575.000 $4.000 $8.500 $5.000 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 14,305.000 $0.500 $1.250 $0.360 $1.200
ELIM EXT PAV MRK & MRKS (8")
LF 282.000 $0.700 $3.500 $0.720 $2.700
ELIM EXT PAV MRK & MRKS (24")
LF 153.000 $3.100 $5.000 $4.300 $4.600
REMOVING TRAFFIC SIGNALS
EA 1.000 $8,000.000 $15,000.000 $15,000.000 $16,000.000
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 1.000 $28,000.000 $14,500.000 $15,000.000 $16,000.000
VEH SIG SEC (12")LED(GRN)
EA 10.000 $300.000 $275.000 $350.000 $290.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $300.000 $275.000 $350.000 $290.000
VEH SIG SEC (12")LED(YEL)
EA 10.000 $300.000 $275.000 $350.000 $290.000
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $300.000 $275.000 $350.000 $290.000
VEH SIG SEC (12")LED(RED)
EA 10.000 $300.000 $275.000 $350.000 $290.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $300.000 $275.000 $350.000 $290.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $650.000 $850.000 $1,000.000 $900.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 10.000 $100.000 $200.000 $200.000 $220.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000 $100.000 $225.000 $200.000 $240.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,080.000 $1.500 $2.500 $2.500 $2.700
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,080.000 $2.000 $3.000 $3.000 $3.200
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 715.000 $2.250 $4.000 $3.500 $4.300
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 1,060.000 $3.750 $7.000 $5.000 $7.500
INS TRF SIG PL AM(S)1 ARM(48')LUM&ILSN
EA 4.000 $12,000.000 $29,500.000 $25,000.000 $31,000.000
PED POLE ASSEMBLY
EA 5.000 $3,000.000 $1,250.000 $6,000.000 $1,400.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $750.000 $750.000 $1,500.000 $800.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,500.000 $4,500.000 $10,000.000 $4,800.000
LANDSCAPE AMENITY (TY 1)
EA 1.000 $19,500.000 $20,000.000 $5,000.000 $20,000.000
LANDSCAPE AMENITY (TY 2)
EA 1.000 $21,500.000 $20,000.000 $5,000.000 $24,000.000
D-GR HMA TY-B PG64-22
TON 3,224.000 $115.000 $150.000 $145.000 $132.000
TACK COAT
GAL 1,427.000 $3.500 $10.000 $0.100 $3.500
SP MIXES SP-C SAC-B PG76-22
TON 8,597.000 $115.000 $150.880 $160.000 $172.000
BONDING COURSE
GAL 10,522.000 $3.500 $10.000 $0.100 $2.900
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 150.000 $100.000 $300.000 $300.000 $130.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $7,500.000 $10,000.000 $5,000.000 $11,000.000
ILSN (LED) (6 D)
EA 4.000 $2,800.000 $4,000.000 $10,000.000 $4,500.000
TMA (STATIONARY)
DAY 104.000 $200.000 $400.000 $200.000 $240.000
TMA (MOBILE OPERATION)
DAY 72.000 $225.000 $400.000 $50.000 $100.000
VIVDS PROSR SYS (INSTALL ONLY)
EA 1.000 $1,000.000 $1,000.000 $1,500.000 $1,100.000
VIVDS CAM ASSY (INSTALL ONLY)
EA 4.000 $450.000 $800.000 $2,000.000 $850.000
VIVDS CABLING (INSTALL ONLY)
LF 1,230.000 $1.000 $1.000 $10.000 $1.100
Totals: $3,427,369.240 $4,045,900.200 $4,385,707.140 $4,550,217.960