Show Job Controls
Bid Cobra

BROWN US 67 (0054-06-105)

Items: 67

County: BROWN
Length: N/A
Highway: US 67
District: BROWNWOOD
Control Number: 0054-06-105
DBE Goal: N/A
Project: C 54-6-105
Guaranty: N/A
Time: 51 WORKING DAYS
Engineer's Estimate: $820,043.25
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$820,043.25
Over/Under Est: 4.2% $34,469.90
Over/Under Est: 17.18% $140,864.75
Amt Left: 12.45% $106,394.85
$1,003,477.60
Over/Under Est: 22.37% $183,434.35
Amt Left: 17.43% $148,964.45
Delta: -4.43% -$42,569.60

Bid Items & Bid Tabulations

67 Total 0 of 67
BROWN  |  US 67  |  BROWNWOOD  |  0054-06-105  |  04/05/2023  |  $820,043.25  |  C 54-6-105  |  INTERS IMPRVS WITH RIGHT AND/OR LEFT...  |  51 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY MILLS CONTRACTING, INCORPORATED
ACME BRIDGE COMPANY, INC.
3LW CIVIL LLC
REMOVING CONC (PAV)
SY 97.000 $45.000 $40.000 $60.000 $46.000
REMOVING CONC (CURB)
LF 171.000 $28.000 $45.000 $16.000 $21.000
REMOVING CONC (CURB AND GUTTER)
LF 454.000 $34.000 $50.000 $14.000 $25.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 152.000 $40.000 $40.000 $46.600 $33.000
REMOVING CONC (GND BOX W/ APRON)
EA 5.000 $825.000 $1,000.000 $740.000 $130.000
EXCAVATION (ROADWAY)
CY 734.000 $55.000 $55.000 $40.000 $46.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 150.000 $75.000 $60.000 $201.000 $59.000
BLOCK SODDING
SY 458.000 $15.000 $14.000 $22.200 $13.000
VEGETATIVE WATERING
MG 12.000 $100.000 $400.000 $190.000 $185.000
PROOF ROLLING
HR 2.000 $120.000 $250.000 $164.000 $5,000.000
HMCL ACP TY-B SAC-B AC-1.5
TON 20.000 $565.000 $330.000 $489.000 $1,100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 760.000 $150.000 $155.000 $164.000 $265.000
PLANE ASPH CONC PAV (1.5")
SY 1,054.000 $10.000 $11.000 $8.900 $6.500
PLANE ASPH CONC PAV (3")
SY 1,695.000 $9.000 $15.000 $8.700 $5.500
FLOWABLE BACKFILL
CY 15.000 $360.000 $330.000 $634.000 $411.000
RETAINING WALL (CAST - IN - PLACE)
SF 62.000 $185.000 $200.000 $300.000 $171.000
RC PIPE (CL III)(24 IN)
LF 42.000 $190.000 $180.000 $300.000 $169.000
INLET (COMPL)(TY C)
EA 2.000 $7,200.000 $9,000.000 $15,000.000 $8,500.000
ADJUSTING INLET (CAP)
EA 2.000 $6,000.000 $6,000.000 $2,470.000 $4,100.000
MOBILIZATION
LS 1.000 $75,000.000 $84,000.000 $82,000.000 $165,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $16,000.000 $18,000.000 $8,000.000 $21,000.000
SANDBAGS FOR EROSION CONTROL
EA 10.000 $45.000 $40.000 $14.800 $33.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 486.000 $6.500 $7.000 $7.400 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 486.000 $2.000 $1.500 $1.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 60.000 $22.000 $20.000 $14.800 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $3.000 $1.500 $1.500 $3.000
CONC CURB & GUTTER (TY II)
LF 547.000 $75.000 $75.000 $91.600 $75.000
DRIVEWAYS (CONC)
SY 117.000 $180.000 $170.000 $218.000 $142.000
CONC SIDEWALKS (4")
SY 146.000 $130.000 $121.000 $164.000 $101.000
CONC SIDEWALKS (6")
SY 31.000 $150.000 $137.500 $294.000 $145.000
CURB RAMPS (TY 2)
EA 2.000 $2,800.000 $4,000.000 $5,930.000 $3,250.000
CURB RAMPS (TY 10)
EA 1.000 $3,650.000 $4,000.000 $5,810.000 $3,150.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $1,050.000 $985.000 $2,960.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,800.000 $1,650.000 $2,960.000 $1,315.000
REMOVE SM RD SN SUP&AM
EA 2.000 $300.000 $275.000 $296.000 $190.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 24.000 $35.000 $39.010 $51.800 $37.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 4.000 $460.000 $529.450 $703.000 $490.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 2.000 $610.000 $668.780 $888.000 $625.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 280.000 $1.200 $1.390 $1.850 $1.550
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 25.000 $7.250 $6.690 $8.900 $6.250
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 100.000 $3.500 $4.460 $5.900 $4.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 500.000 $1.200 $1.390 $1.850 $1.550
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 200.000 $3.250 $3.000 $3.100 $6.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 100.000 $3.250 $3.000 $3.100 $3.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 78.000 $7.500 $6.690 $8.900 $6.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 890.000 $3.500 $3.340 $4.450 $3.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 176.000 $12.000 $11.150 $14.800 $12.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 14.000 $240.000 $278.660 $370.000 $275.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 10.000 $300.000 $306.520 $407.000 $290.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 80.000 $1.500 $1.110 $1.500 $1.200
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 640.000 $1.500 $1.110 $1.500 $1.250
REFL PAV MRKR TY I-C
EA 58.000 $8.500 $11.150 $14.800 $12.000
REFL PAV MRKR TY II-A-A
EA 32.000 $8.500 $11.150 $14.800 $11.200
ELIM EXT PAV MRK & MRKS (4")
LF 1,435.000 $1.000 $1.110 $1.500 $1.550
ELIM EXT PAV MRK & MRKS (8")
LF 160.000 $15.000 $1.670 $2.200 $2.100
ELIM EXT PAV MRK & MRKS (24")
LF 190.000 $10.000 $7.800 $10.400 $8.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $110.000 $167.190 $222.000 $169.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $110.000 $167.200 $222.000 $171.000
REMOVE PED POLE ASSEMBLY
EA 2.000 $1,600.000 $3,000.000 $1,480.000 $790.000
D-GR HMA TY-B PG64-22
TON 443.000 $235.000 $220.000 $318.000 $295.000
TACK COAT
GAL 130.000 $7.000 $5.500 $25.200 $4.500
SP MIXES SP-C SAC-B PG76-22
TON 459.000 $285.000 $282.000 $340.000 $295.000
TACK COAT
GAL 60.000 $7.000 $5.500 $26.600 $4.200
BONDING COURSE
GAL 372.000 $7.000 $5.500 $44.400 $4.100
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $120.000 $150.000 $128.000 $85.000
TMA (STATIONARY)
DAY 40.000 $300.000 $350.000 $220.000 $100.000
TMA (MOBILE OPERATION)
DAY 12.000 $500.000 $350.000 $885.000 $100.000
Totals: $820,043.250 $854,513.150 $960,908.000 $1,003,477.600