BROOKS SH 285 (0102-07-045)

Items: 64

County: BROOKS
Length: N/A
Highway: SH 285
District: PHARR
Control Number: 0102-07-045
DBE Goal: N/A
Project: STP 1902(052)
Guaranty: N/A
Time: 138 WORKING DAYS
Engineer's Estimate: $9,481,407.90
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$9,481,407.90
$11,330,610.73
Over/Under Est: 19.5% $1,849,202.83

Bid Items & Bid Tabulations

64 Total 0 of 64
BROOKS  |  SH 285  |  PHARR  |  0102-07-045  |  06/04/2019  |  $9,481,407.90  |  STP 1902(052)  |  OVERLAY  |  138 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
REMOVING CONCRETE(MOW STRIP)
LF 4,163.000 $8.500 $6.000
BACKFILL (TY A)
STA 681.030 $120.000 $160.000
SUPERPAVE MIXTURES SP-D SAC-A PG76-22
TON 12,492.000 $98.000 $105.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 60,278.000 $98.000 $120.000
PLANE ASPH CONC PAV (1.5")
SY 366,271.000 $2.000 $1.800
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 27,355.000 $1.500 $2.600
PAV JT UNDERSEAL (24")
LF 1,075.000 $15.300 $37.000
RIPRAP (MOW STRIP)(4 IN)
CY 110.000 $340.000 $425.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,075.000 $25.000 $33.000
MOBILIZATION
LS 1.000 $450,000.000 $750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $3,500.000 $7,500.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 360.000 $3.500 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 9,724.000 $0.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 9,364.000 $3.500 $5.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,673.000 $24.000 $21.000
REMOVE METAL BEAM GUARD FENCE
LF 3,583.000 $8.800 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $2,873.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 18.000 $625.000 $280.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 13,301.000 $0.750 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 16,509.000 $0.500 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 12,759.000 $0.900 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 9,970.000 $3.300 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,656.000 $6.300 $4.200
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 27.000 $127.000 $120.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 27.000 $238.000 $230.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,630.000 $3.000 $1.600
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 3,804.000 $3.000 $1.600
REFL PAV MRK TY II (W) 4" (BRK)
LF 18,470.000 $0.150 $0.300
REFL PAV MRK TY II (W) 4" (SLD)
LF 472.000 $0.150 $0.300
REFL PAV MRK TY II (W) 8" (SLD)
LF 6,293.000 $0.400 $0.550
REFL PAV MRK TY II (Y) 4" (BRK)
LF 11,880.000 $0.150 $0.270
REFL PAV MRK TY II (Y) 4" (SLD)
LF 59,897.000 $0.180 $0.270
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 41,320.000 $0.360 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 98,846.000 $0.340 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 18,610.000 $0.300 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 118,395.000 $0.320 $0.400
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 101,302.000 $0.500 $0.900
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 3,950.000 $0.500 $0.900
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 93,693.000 $0.550 $0.900
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 4.000 $350.000 $500.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 169.000 $207.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 77.000 $253.000 $290.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 6.000 $550.000 $535.000
REFL PAV MRKR TY I-C
EA 2,324.000 $3.000 $4.000
REFL PAV MRKR TY II-A-A
EA 6,159.000 $2.750 $4.000
REFL PAV MRKR TY II-C-R
EA 365.000 $5.800 $4.000
TRAFFIC BUTTON TY Y
EA 2,687.000 $2.200 $2.000
TRAFFIC BUTTON TY B
EA 4,163.000 $1.700 $2.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,320.000 $0.550 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 1,357.000 $0.850 $2.000
ELIM EXT PAV MRK & MRKS (12")
LF 3,353.000 $1.450 $2.500
ELIM EXT PAV MRK & MRKS (24")
LF 1,873.000 $3.000 $5.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 12.000 $43.000 $50.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 10.000 $48.000 $50.000
PAV SURF PREP FOR MRK (4")
LF 2,320.000 $0.100 $0.120
PAV SURF PREP FOR MRK (8")
LF 1,197.000 $0.100 $0.220
PAV SURF PREP FOR MRK (12")
LF 1,681.000 $0.150 $0.350
PAV SURF PREP FOR MRK (24")
LF 528.000 $0.500 $0.650
PAV SURF PREP FOR MRK (ARROW)
EA 8.000 $2.100 $1.600
PAV SURF PREP FOR MRK (WORD)
EA 8.000 $1.350 $1.600
PAV SURF PREP FOR MRK (RPM)
EA 174.000 $0.100 $0.250
VEH LP DETECT (SAWCUT)
LF 17,885.000 $10.000 $11.000
TMA (STATIONARY)
EA 2.000 $4,435.000 $4,500.000
TMA (MOBILE OPERATION)
DAY 180.000 $240.000 $150.000
Totals: $9,481,407.900 $11,330,610.730