Job Info for 6418-03-001

County: BREWSTER Highway: SH0118 Date: 09/01/2022 (2 years ago) Engineer's Estimate: $106,650 Control Number: 6418-03-001
Project: MMC - 641803001 District: EL PASO Time: 120 CALENDAR DAYS Type: ASPHALTIC PATCHING MATERIAL
HCS
Pay Estimates: 1 | 2 | 3
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $106,650.00
TOUCHSTONE RESOURCES, LLC   $151,750.00 1
42.29% | $45,100.00

Bid Items

Items: 6, 0 filtered
BREWSTER SH0118  |  EL PASO  |  6418-03-001  |  09/01/2022  |  $106,650  |  MMC - 641803001  |  ASPHIC PATCHING MATERIAL  |  120 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate TOUCHSTONE RESOURCES, LLC
8019 6023 ASPH CONC PAT MAT(ASPPM)(DEL)(SITE 1) TON 100.000 $165.000 $235.000
8019 6024 ASPH CONC PAT MAT(ASPPM)(DEL)(SITE 2) TON 75.000 $165.000 $235.000
8019 6025 ASPH CONC PAT MAT(ASPPM)(DEL)(SITE 3) TON 75.000 $169.000 $240.000
8019 6026 ASPH CONC PAT MAT(ASPPM)(DEL)(SITE 4) TON 75.000 $166.000 $235.000
8019 6027 ASPH CONC PAT MAT(ASPPM)(DEL)(SITE 5) TON 150.000 $176.000 $250.000
8019 6028 ASPH CONC PAT MAT(ASPPM)(DEL)(SITE 6) TON 150.000 $175.000 $250.000
Totals: $106,650.00 $151,750.00