Job Info for 6422-55-001

County: BRAZOS Highway: SH0006 Date: 12/01/2022 (1 year ago) Engineer's Estimate: $517,500 Control Number: 6422-55-001
Project: MMC - 642255001 District: BRYAN Time: 180 CALENDAR DAYS Type: HOT MIX
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $517,500.00
KNIFE RIVER CORPORATION - SOUTH   $453,460.00 1
-12.37% | -$64,040.00
BRAZOS PAVING, INC.   $455,000.00 2
-12.08% | -$62,500.00
0.34% | $1,540.00
TEXAS MATERIALS GROUP, INC.   $476,750.00 3
-7.87% | -$40,750.00
5.14% | $23,290.00
4.78% | $21,750.00
VULCAN CONSTRUCTION MATERIALS, LLC   $509,750.00 4
-1.5% | -$7,750.00
12.41% | $56,290.00
6.92% | $33,000.00
WALLER COUNTY ASPHALT INC.   $528,475.00 5
2.12% | $10,975.00
16.54% | $75,015.00
3.67% | $18,725.00

Bid Items

Items: 2, 0 filtered
BRAZOS SH0006  |  BRYAN  |  6422-55-001  |  12/01/2022  |  $517,500  |  MMC - 642255001  |  HOT MIX  |  180 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate KNIFE RIVER CORPORATION - SOUTH BRAZOS PAVING, INC. TEXAS MATERIALS GROUP, INC. VULCAN CONSTRUCTION MATERIALS, LLC WALLER COUNTY ASPHALT INC.
8011 6001 D-GR HMA(SQ) TY D PG 64-22 (PICKUP) TON 500.000 $90.000 $80.000 $82.000 $85.000 $83.500 $89.000
8011 6002 D-GR HMA(SQ) TY D PG 64-22 (DELIVERY) TON 4,500.000 $105.000 $91.880 $92.000 $96.500 $104.000 $107.550
Totals: $517,500.00 $453,460.00 $455,000.00 $476,750.00 $509,750.00 $528,475.00