Show Job Controls
Bid Cobra

BRAZOS SH0006 (6411-83-001)

Items: 47

County: BRAZOS
Length: N/A
Highway: SH0006
District: BRYAN
Control Number: 6411-83-001
DBE Goal: N/A
Project: RMC - 641183001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $521,755.00
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$521,755.00
$431,845.00
Over/Under Est: -17.23% -$89,910.00
Over/Under Est: -0.37% -$1,915.00
Amt Left: 20.38% $87,995.00
Over/Under Est: 1.11% $5,805.00
Amt Left: 22.16% $95,715.00
Delta: -1.49% -$7,720.00

Bid Items & Bid Tabulations

47 Total 0 of 47
BRAZOS  |  SH0006  |  BRYAN  |  6411-83-001  |  08/03/2022  |  $521,755.00  |  RMC - 641183001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
T&L CLEANING SERVICES LLC
MILSTEAD HIGHWAY SERVICES, LLC
RIPRAP (MOW STRIP)(4 IN)
CY 5.000 $600.000 $400.000 $100.000 $200.000
MOBILIZATION (CALLOUT)
EA 30.000 $500.000 $1.000 $200.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,500.000 $26.000 $24.000 $30.000 $28.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $36.000 $32.000 $30.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,300.000 $1,350.000 $1,500.000 $1,500.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $9.000 $7.000 $1.000 $2.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,620.000 $1,900.000 $1,200.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 2,000.000 $4.100 $0.100 $2.000 $6.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $195.000 $200.000 $100.000 $100.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $145.000 $1.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $2,425.000 $2,750.000 $3,500.000 $3,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $265.000 $200.000 $1.000 $1.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,000.000 $23.000 $24.000 $24.000 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 15.000 $32.000 $25.000 $20.000 $21.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 20.000 $35.000 $35.000 $20.000 $21.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 50.000 $24.000 $28.000 $30.000 $30.000
RAISE RAIL ELEMENT
LF 450.000 $4.000 $15.000 $1.000 $4.000
REM / REPL TIMBER POST W / O CONC FND
EA 150.000 $36.000 $20.000 $40.000 $50.000
REM / REPL STEEL POST W / O CONC FND
EA 25.000 $60.000 $30.000 $40.000 $42.000
REM / REPL TIMBER POST W / CONC FND
EA 30.000 $40.000 $20.000 $40.000 $50.000
REM / REPL STEEL POST W / CONC FND
EA 5.000 $60.000 $30.000 $40.000 $42.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $195.000 $1.000 $1.000 $1.000
REALIGN POSTS
EA 300.000 $22.000 $5.000 $10.000 $10.000
REMOVE & REPLACE BLOCKOUT
EA 70.000 $24.500 $80.000 $10.000 $20.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 25.000 $14.000 $1.000 $10.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 125.000 $25.000 $40.000 $20.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 40.000 $72.000 $40.000 $40.000 $45.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 25.000 $3,000.000 $4,500.000 $3,500.000 $3,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $920.000 $1,100.000 $800.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $140.000 $1.000 $10.000 $15.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $69.000 $1.000 $1.000 $50.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $54.000 $1.000 $1.000 $50.000
REPLACE SGT STRUT
EA 10.000 $50.000 $1.000 $1.000 $50.000
REPLACE SGT OBJECT MARKER
EA 10.000 $40.000 $1.000 $30.000 $30.000
REMOVE AND REPLACE DAT
EA 10.000 $1,300.000 $1,400.000 $1,200.000 $1,200.000
REPLACE POSTS (TL-4)
EA 250.000 $130.000 $75.000 $200.000 $50.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $240.000 $1.000 $100.000 $20.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $95.000 $1.000 $10.000 $10.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,350.000 $300.000 $1,000.000 $1.000
REPLACE CABLE (TL-4)
LF 200.000 $3.000 $0.100 $0.500 $1.000
CHECK / RE-TENSION CABLE
EA 25.000 $85.000 $1.000 $1.000 $5.000
REPLACE POST HARDWARE (TL-4)
EA 100.000 $30.000 $25.000 $30.000 $20.000
REMOVE AND REPLACE (FASTRACC) (W)
EA 2.000 $28,000.000 $5.000 $20,000.000 $37,735.000
REPAIR (FASTRACC) (W)
LF 50.000 $100.000 $100.000 $100.000 $150.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 50.000 $50.000 $40.000 $50.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $100.000 $1.000 $1.000 $1.000
TMA (STATIONARY)
DAY 70.000 $200.000 $1.000 $200.000 $200.000
Totals: $521,755.000 $431,845.000 $519,840.000 $527,560.000