Job Info for 6411-83-001

County: BRAZOS Highway: SH0006 Date: 08/03/2022 (2 years ago) Engineer's Estimate: $521,755 Control Number: 6411-83-001
Project: RMC - 641183001 District: BRYAN Time: 365 CALENDAR DAYS Type: METAL BEAM GUARD FENCE REPAIR
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13
Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $521,755.00
BK FIELD OPERATIONS LLC   $431,845.00 1
-17.23% | -$89,910.00
T&L CLEANING SERVICES LLC   $519,840.00 2
-0.37% | -$1,915.00
20.38% | $87,995.00
MILSTEAD HIGHWAY SERVICES, LLC   $527,560.00 3
1.11% | $5,805.00
22.16% | $95,715.00
1.49% | $7,720.00

Bid Items

Items: 47, 0 filtered
BRAZOS SH0006  |  BRYAN  |  6411-83-001  |  08/03/2022  |  $521,755  |  RMC - 641183001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate BK FIELD OPERATIONS LLC T&L CLEANING SERVICES LLC MILSTEAD HIGHWAY SERVICES, LLC
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 5.000 $600.000 $400.000 $100.000 $200.000
500 6033 MOBILIZATION (CALLOUT) EA 30.000 $500.000 $1.000 $200.000 $100.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 2,500.000 $26.000 $24.000 $30.000 $28.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 50.000 $36.000 $32.000 $30.000 $30.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 5.000 $2,300.000 $1,350.000 $1,500.000 $1,500.000
540 6010 MTL W-BEAM GD FEN ADJUSTMENT LF 50.000 $9.000 $7.000 $1.000 $2.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 5.000 $1,620.000 $1,900.000 $1,200.000 $2,000.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,000.000 $4.100 $0.100 $2.000 $6.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 5.000 $195.000 $200.000 $100.000 $100.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 5.000 $145.000 $1.000 $1.000 $1.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 20.000 $2,425.000 $2,750.000 $3,500.000 $3,600.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 15.000 $265.000 $200.000 $1.000 $1.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 4,000.000 $23.000 $24.000 $24.000 $25.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 15.000 $32.000 $25.000 $20.000 $21.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 20.000 $35.000 $35.000 $20.000 $21.000
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF 50.000 $24.000 $28.000 $30.000 $30.000
770 6006 RAISE RAIL ELEMENT LF 450.000 $4.000 $15.000 $1.000 $4.000
770 6012 REM / REPL TIMBER POST W / O CONC FND EA 150.000 $36.000 $20.000 $40.000 $50.000
770 6013 REM / REPL STEEL POST W / O CONC FND EA 25.000 $60.000 $30.000 $40.000 $42.000
770 6014 REM / REPL TIMBER POST W / CONC FND EA 30.000 $40.000 $20.000 $40.000 $50.000
770 6015 REM / REPL STEEL POST W / CONC FND EA 5.000 $60.000 $30.000 $40.000 $42.000
770 6016 REPAIR STEEL POST WITH BASE PLATE EA 5.000 $195.000 $1.000 $1.000 $1.000
770 6017 REALIGN POSTS EA 300.000 $22.000 $5.000 $10.000 $10.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 70.000 $24.500 $80.000 $10.000 $20.000
770 6020 REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS EA 25.000 $14.000 $1.000 $10.000 $10.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 125.000 $25.000 $40.000 $20.000 $25.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 40.000 $72.000 $40.000 $40.000 $45.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 25.000 $3,000.000 $4,500.000 $3,500.000 $3,500.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 10.000 $920.000 $1,100.000 $800.000 $1,000.000
770 6029 REM & RESET SGT IMPACT HEAD EA 10.000 $140.000 $1.000 $10.000 $15.000
770 6030 REPLACE SGT CABLE ASSEMBLY EA 10.000 $69.000 $1.000 $1.000 $50.000
770 6031 REPLACE SGT CABLE ANCHOR EA 10.000 $54.000 $1.000 $1.000 $50.000
770 6032 REPLACE SGT STRUT EA 10.000 $50.000 $1.000 $1.000 $50.000
770 6033 REPLACE SGT OBJECT MARKER EA 10.000 $40.000 $1.000 $30.000 $30.000
770 6060 REMOVE AND REPLACE DAT EA 10.000 $1,300.000 $1,400.000 $1,200.000 $1,200.000
771 6002 REPLACE POSTS (TL-4) EA 250.000 $130.000 $75.000 $200.000 $50.000
771 6004 CABLE SPLICE / TURNBUCKLE (TL-4) EA 10.000 $240.000 $1.000 $100.000 $20.000
771 6006 REPAIR CONCRETE FOUNDATION (TL-4) EA 10.000 $95.000 $1.000 $10.000 $10.000
771 6008 REPR OR REPLC CABLE BARR TERM SEC(TL-4) EA 10.000 $1,350.000 $300.000 $1,000.000 $1.000
771 6010 REPLACE CABLE (TL-4) LF 200.000 $3.000 $0.100 $0.500 $1.000
771 6011 CHECK / RE-TENSION CABLE EA 25.000 $85.000 $1.000 $1.000 $5.000
771 6012 REPLACE POST HARDWARE (TL-4) EA 100.000 $30.000 $25.000 $30.000 $20.000
774 6051 REMOVE AND REPLACE (FASTRACC) (W) EA 2.000 $28,000.000 $5.000 $20,000.000 $37,735.000
774 6054 REPAIR (FASTRACC) (W) LF 50.000 $100.000 $100.000 $100.000 $150.000
776 6004 REPAIR (STL POST W/ DOUBLED W-BEAMS-T6) LF 50.000 $50.000 $40.000 $50.000 $50.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 10.000 $100.000 $1.000 $1.000 $1.000
6185 6002 TMA (STATIONARY) DAY 70.000 $200.000 $1.000 $200.000 $200.000
Totals: $521,755.00 $431,845.00 $519,840.00 $527,560.00