Bid Cobra

BRAZOS SH0006 (6364-17-001)

Items: 46

County: BRAZOS
Length: N/A
Highway: SH0006
District: BRYAN
Control Number: 6364-17-001
DBE Goal: N/A
Project: RMC - 636417001
Guaranty: N/A
Time: 731 CALENDAR DAYS
Engineer's Estimate: $1,097,700.00
Date: 08/05/2020 (5 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,097,700.00
$865,110.00
Over/Under Est: -21.19% -$232,590.00
Over/Under Est: -3.73% -$40,950.00
Amt Left: 22.15% $191,640.00
$1,161,560.00
Over/Under Est: 5.82% $63,860.00
Amt Left: 34.27% $296,450.00
Delta: -9.92% -$104,810.00
Over/Under Est: 17.07% $187,410.00
Amt Left: 48.55% $420,000.00
Delta: -10.64% -$123,550.00

Bid Items & Bid Tabulations

46 Total 0 of 46
BRAZOS  |  SH0006  |  BRYAN  |  6364-17-001  |  08/05/2020  |  $1,097,700.00  |  RMC - 636417001  |  METAL BEAM GUARD FENCE REPAIR  |  731 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
BK FIELD OPERATIONS LLC
ISI CONTRACTING, INC.
MARCOM'S MOWING SERVICE, LLC
RIPRAP (MOW STRIP)(4 IN)
CY 15.000 $325.000 $400.000 $300.000 $735.000 $400.000
MOBILIZATION (CALLOUT)
EA 60.000 $500.000 $1.000 $200.000 $750.000 $500.000
MTL W-BEAM GD FEN (TIM POST)
LF 150.000 $26.500 $20.000 $22.000 $25.000 $23.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $28.000 $30.000 $26.000 $52.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,500.000 $1,500.000 $1,400.000 $2,700.000 $1,860.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 100.000 $10.000 $1.000 $15.000 $11.000 $10.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,250.000 $1,200.000 $1,100.000 $1,475.000 $1,250.000
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $2.400 $2.000 $1.000 $1.500 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $150.000 $100.000 $100.000 $5.000 $750.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $125.000 $1.000 $50.000 $100.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $2,800.000 $2,900.000 $2,800.000 $3,300.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $325.000 $1.000 $100.000 $270.000 $500.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 15,000.000 $22.000 $21.000 $20.000 $18.000 $24.950
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 120.000 $25.250 $20.000 $70.000 $25.000 $60.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 250.000 $24.000 $20.000 $50.000 $25.000 $60.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 20.000 $15.000 $30.000 $30.000 $25.000 $42.000
RAISE RAIL ELEMENT
LF 8,500.000 $8.500 $1.000 $12.000 $9.000 $12.000
REM / REPL TIMBER POST W / O CONC FND
EA 200.000 $60.000 $35.000 $22.000 $42.000 $58.000
REM / REPL STEEL POST W / O CONC FND
EA 50.000 $70.000 $42.000 $60.000 $52.000 $72.000
REM / REPL TIMBER POST W / CONC FND
EA 40.000 $120.000 $35.000 $80.000 $42.000 $58.000
REM / REPL STEEL POST W / CONC FND
EA 10.000 $150.000 $42.000 $150.000 $52.000 $80.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $250.000 $1.000 $200.000 $250.000 $350.000
REALIGN POSTS
EA 900.000 $14.000 $10.000 $20.000 $7.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 175.000 $35.000 $10.000 $5.000 $15.000 $30.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 50.000 $5.000 $10.000 $10.000 $15.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 400.000 $25.000 $25.000 $30.000 $31.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $50.000 $45.000 $75.000 $42.000 $80.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 100.000 $3,500.000 $2,900.000 $2,900.000 $3,430.000 $3,250.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $950.000 $1,000.000 $800.000 $1,150.000 $1,100.000
REM & RESET SGT IMPACT HEAD
EA 15.000 $83.000 $10.000 $200.000 $135.000 $250.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $60.000 $1.000 $75.000 $115.000 $110.000
REPLACE SGT CABLE ANCHOR
EA 15.000 $60.000 $1.000 $90.000 $115.000 $110.000
REPLACE SGT STRUT
EA 25.000 $55.000 $1.000 $100.000 $158.000 $110.000
REPLACE SGT OBJECT MARKER
EA 20.000 $30.000 $30.000 $15.000 $32.000 $50.000
REMOVE AND REPLACE DAT
EA 15.000 $890.000 $1,200.000 $1,250.000 $1,475.000 $1,250.000
REPLACE POSTS (TL-4)
EA 200.000 $100.000 $30.000 $150.000 $200.000 $225.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 15.000 $90.000 $1.000 $400.000 $570.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 15.000 $60.000 $10.000 $650.000 $34.000 $250.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,500.000 $1.000 $2,800.000 $1,110.000 $1,100.000
REPLACE CABLE (TL-4)
LF 800.000 $1.450 $1.000 $5.000 $3.700 $5.000
CHECK / RE-TENSION CABLE
EA 10.000 $125.000 $1.000 $400.000 $200.000 $250.000
REMOVE AND REPLACE (FASTRACC) (W)
EA 2.000 $15,000.000 $20,000.000 $19,000.000 $37,000.000 $32,000.000
REPAIR (FASTRACC) (W)
LF 50.000 $100.000 $100.000 $300.000 $375.000 $500.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 50.000 $50.000 $50.000 $100.000 $115.000 $60.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $125.000 $1.000 $125.000 $180.000 $250.000
TMA (STATIONARY)
DAY 125.000 $300.000 $200.000 $75.000 $285.000 $250.000
Totals: $1,097,700.000 $865,110.000 $1,056,750.000 $1,161,560.000 $1,285,110.000