BRAZOS SH 30 (2446-01-026)

Items: 66

County: BRAZOS
Length: N/A
Highway: SH 30
District: BRYAN
Control Number: 2446-01-026
DBE Goal: N/A
Project: STP 2017(759)
Guaranty: N/A
Time: 50 WORKING DAYS
Engineer's Estimate: $2,046,236.97
Date: 02/03/2017 (9 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,046,236.97
$1,679,419.00
Over/Under Est: -17.93% -$366,817.97
Over/Under Est: 11.8% $241,478.49
Amt Left: 36.22% $608,296.46
$2,593,011.06
Over/Under Est: 26.72% $546,774.09
Amt Left: 54.4% $913,592.06
Delta: -13.34% -$305,295.60

Bid Items & Bid Tabulations

66 Total 0 of 66
BRAZOS  |  SH 30  |  BRYAN  |  2446-01-026  |  02/03/2017  |  $2,046,236.97  |  STP 2017(759)  |  OVERLAY  |  50 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
BRAZOS PAVING, INC.
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 4.000 $300.000 $638.000 $500.000 $400.000
REMOVING CONC (RIPRAP)
SY 5.000 $15.000 $441.250 $50.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 401.000 $14.000 $36.500 $25.000 $12.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 65.000 $7.000 $68.000 $50.000 $10.000
REMOVE CONC (MISC)
EA 1.000 $500.000 $1,331.500 $1,000.000 $1,200.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 17.000 $12.000 $232.000 $100.000 $25.000
BLOCK SODDING
SY 261.000 $3.800 $7.500 $10.000 $7.700
VEGETATIVE WATERING
MG 8.000 $20.000 $102.000 $100.000 $150.000
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 3,046.000 $100.000 $71.500 $89.000 $96.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 8,483.000 $105.000 $94.000 $125.000 $135.000
PLANE ASPH CONC PAV(2" TO 4")
SY 52,095.000 $5.000 $2.250 $3.000 $2.020
PLANE ASPH CONC PAV (2")
SY 24,919.000 $1.500 $2.000 $3.000 $1.020
PLANE ASPH CONC PAV (3")
SY 204.000 $2.100 $15.500 $10.000 $11.200
PLANE ASPH CONC PAV (4")
SY 13,849.000 $2.400 $3.000 $3.000 $1.850
TEMPORARY SPL SHORING
SF 432.000 $15.000 $69.000 $75.000 $25.000
RIPRAP (CONC)(4 IN)
CY 6.900 $500.000 $794.000 $750.000 $600.000
RAIL (HANDRAIL)(TY E)
LF 70.000 $120.000 $253.500 $150.000 $150.000
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
LF 4.000 $760.000 $1,588.000 $3,500.000 $1,666.000
INLET(COMPL)(CURB)(SPL)
EA 1.000 $7,000.000 $3,703.000 $6,000.000 $2,400.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $31,000.000 $27,508.000 $25,000.000 $14,307.000
REMOV STR (WINGWALL)
EA 1.000 $1,500.000 $2,116.000 $3,000.000 $3,000.000
MOBILIZATION
LS 1.000 $186,650.000 $71,928.150 $200,000.000 $111,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $5,000.000 $1,964.750 $12,500.000 $11,385.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 30.000 $40.000 $58.250 $75.000 $32.400
ROCK FILTER DAMS (REMOVE)
LF 30.000 $6.500 $10.500 $10.000 $32.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 115.000 $3.000 $25.000 $7.000 $6.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 115.000 $0.650 $2.250 $3.000 $2.150
CONC CURB (TY II)
LF 123.000 $40.000 $56.000 $50.000 $20.000
DRIVEWAYS (ACP)
SY 156.000 $40.000 $38.000 $50.000 $48.000
DRIVEWAYS (CONC) (HES)
SY 401.000 $92.000 $72.000 $125.000 $117.000
CONC SIDEWALKS (6")
SY 682.000 $100.000 $58.250 $125.000 $58.500
CURB RAMPS (TY 1)
EA 6.000 $1,500.000 $1,361.500 $2,500.000 $650.000
CURB RAMPS (TY 6)
EA 2.000 $2,050.000 $1,478.500 $2,500.000 $1,295.000
CURB RAMPS (TY 7)
EA 5.000 $1,500.000 $1,007.400 $2,500.000 $850.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 94.000 $75.000 $96.000 $150.000 $93.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 29.000 $65.000 $141.000 $150.000 $93.000
REMOVE METAL BEAM GUARD FENCE
LF 390.000 $2.000 $6.250 $5.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $180.000 $691.250 $250.000 $150.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 1.000 $50.000 $59.250 $100.000 $150.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,409.000 $0.300 $0.250 $0.200 $0.220
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 86.000 $0.620 $0.500 $0.500 $0.540
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 5,840.000 $0.350 $0.500 $0.500 $0.540
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 610.000 $2.800 $3.250 $3.100 $3.350
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,868.000 $0.250 $0.200 $0.200 $0.220
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 12,696.000 $0.200 $0.200 $0.200 $0.220
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,808.000 $1.000 $1.000 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,120.000 $1.000 $1.000 $1.000 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 86.000 $1.250 $1.000 $1.000 $1.080
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,645.000 $0.800 $0.750 $0.700 $0.680
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,790.000 $5.500 $5.250 $5.000 $5.400
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 3.000 $250.000 $359.750 $340.000 $367.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,559.000 $0.340 $0.400 $0.360 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,829.000 $0.280 $0.400 $0.360 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 12,663.000 $0.300 $0.400 $0.360 $0.400
PREFAB PAV MRK TY C (W) (ARROW)
EA 58.000 $190.000 $202.100 $200.000 $206.000
PREFAB PAV MRK TY C (W) (WORD)
EA 41.000 $245.000 $233.000 $225.000 $238.000
REFL PAV MRKR TY I-C
EA 616.000 $3.500 $4.250 $4.000 $4.320
REFL PAV MRKR TY II-A-A
EA 806.000 $3.100 $4.250 $4.000 $4.320
PAV SURF PREP FOR MRK (4")
LF 45.000 $0.500 $1.100 $1.000 $1.080
PAV SURF PREP FOR MRK (8")
LF 487.000 $0.600 $2.250 $2.000 $2.160
PAV SURF PREP FOR MRK (24")
LF 266.000 $2.000 $3.250 $3.000 $3.240
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $15.000 $53.000 $50.000 $54.000
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $20.000 $53.000 $50.000 $54.000
MEMBRANE UNDERSEAL
GAL 11,552.000 $1.844 $0.000 $0.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $11,638.000 $9,500.000 $3,240.000
1
TRACKLESS TACK COAT
GAL 4,620.000 $4.611 $7.500 $5.000 $0.000
Totals: $2,067,538.858 $1,679,419.000 $2,287,715.460 $2,593,011.060