Show Job Controls
Bid Cobra

BRAZOS FM 1179 (1316-01-067)

Items: 76

County: BRAZOS
Length: N/A
Highway: FM 1179
District: BRYAN
Control Number: 1316-01-067
DBE Goal: N/A
Project: STP 2021(771)HES
Guaranty: N/A
Time: 119 WORKING DAYS
Engineer's Estimate: $1,349,104.76
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: INSTALL RAISED MEDIAN
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$1,349,104.76
$1,423,096.93
Over/Under Est: 5.48% $73,992.17
Over/Under Est: 7.57% $102,108.28
Amt Left: 1.98% $28,116.11
Over/Under Est: 18.84% $254,129.04
Amt Left: 12.66% $180,136.87
Delta: -10.48% -$152,020.76
Over/Under Est: 23.76% $320,576.60
Amt Left: 17.33% $246,584.43
Delta: -4.14% -$66,447.56
Subcontractor Percentage Amount
STRIPE LINES, INC. 8.50% $120,963.24
SPEEDY PAVING 4.63% $65,889.39
SARVICUS LLC 1.47% $20,919.53
CITYLYNX, INC. 1.25% $17,788.71
CEN TEX HYDROSEED, INC. 0.27% $3,842.36
Total: 16.12% $229,403.23

Bid Items & Bid Tabulations

76 Total 0 of 76
BRAZOS  |  FM 1179  |  BRYAN  |  1316-01-067  |  08/04/2021  |  $1,349,104.76  |  STP 2021(771)HES  |  INSTL RAISED MEDIAN  |  119 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
TEXCON GENERAL CONTRACTORS
REMOVING CONC (PAV)
SY 46.000 $10.000 $21.640 $42.700 $70.000 $42.000
REMOVING CONC (CURB)
LF 695.000 $6.000 $9.620 $8.980 $6.000 $25.900
REMOVING CONC (CURB OR CURB & GUTTER)
LF 216.000 $7.950 $9.620 $16.000 $22.000 $15.000
REMOVING CONC (PAVERS)
SY 433.000 $11.000 $20.240 $61.480 $25.000 $38.000
EXCAVATION (ROADWAY)
CY 393.000 $10.000 $45.370 $16.600 $28.000 $13.000
FURNISHING AND PLACING TOPSOIL
CY 25.000 $20.000 $82.280 $19.000 $56.000 $88.000
BLOCK SODDING
SY 252.000 $3.000 $7.200 $6.500 $6.000 $6.670
VEGETATIVE WATERING
MG 3.800 $42.500 $61.610 $36.000 $36.000 $245.000
CEM TRT(PLNT MX)(CL M)(TY A)(GR 4)(8")
SY 511.000 $14.000 $34.960 $21.500 $32.000 $35.000
PRIME COAT (MC-30 OR EC-30)
GAL 102.000 $4.530 $8.000 $7.000 $18.000 $20.000
D-GR HMA(SQ) TY-D PG64-22
TON 325.000 $150.000 $102.060 $212.000 $176.000 $200.000
STONE-MTRX-ASPH SMA-F SAC-A PG76-22
TON 3,332.000 $125.000 $138.870 $122.400 $150.500 $121.000
PLANE ASPH CONC PAV(2" TO 4")
SY 18,182.000 $2.890 $1.920 $1.050 $2.750 $2.000
PLANE ASPH CONC PAV (1 1/4")
SY 3,230.000 $1.500 $2.860 $2.000 $2.000 $1.550
PLANE ASPH CONC PAV (5")
SY 3,573.000 $4.000 $2.210 $3.140 $7.000 $5.790
PLANE ASPH CONC PAV (1" TO 4")
SY 2,317.000 $1.370 $1.840 $2.600 $2.500 $3.800
PLANE ASPH CONC PAV (2 1/4")
SY 26,311.000 $2.800 $1.800 $1.150 $2.000 $1.560
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $200.000 $325.070 $295.000 $324.000 $234.000
ADJUSTING MANHOLES
EA 12.000 $810.000 $350.000 $961.000 $954.000 $2,000.000
ADJUSTING MANHOLES (SANITARY)
EA 4.000 $350.000 $350.000 $809.000 $1,040.000 $2,000.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 5.000 $350.000 $85.000 $660.000 $518.000 $500.000
MOBILIZATION
LS 1.000 $135,000.000 $77,022.940 $145,400.000 $142,101.000 $163,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,002.000 $9,813.110 $5,965.000 $5,599.000 $20,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 328.000 $5.500 $6.000 $5.430 $5.000 $5.550
BIODEG EROSN CONT LOGS (REMOVE)
LF 328.000 $1.350 $2.400 $2.170 $2.000 $2.250
LANDSCAPE PAVERS
SY 1,131.000 $105.000 $119.290 $134.000 $83.000 $116.000
CONC CURB & GUTTER (TY II)
LF 622.000 $23.000 $24.310 $40.400 $31.000 $15.000
CONCRETE CURB (SPECIAL)
LF 2,576.000 $25.000 $20.060 $19.600 $25.000 $20.000
CONC SIDEWALKS (5")
SY 146.000 $54.000 $50.470 $107.000 $77.000 $116.000
CURB RAMPS (TY 1)
EA 1.000 $1,800.000 $1,455.520 $1,425.000 $5,761.000 $750.000
CURB RAMPS (TY 2)
EA 1.000 $1,500.000 $2,106.400 $1,425.000 $5,761.000 $1,500.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 76.000 $175.000 $88.960 $118.000 $122.000 $121.000
CURB RAMPS (SPECIAL)
SY 7.000 $121.260 $233.540 $353.000 $650.000 $1,500.000
CONC MEDIAN
SY 1,120.000 $69.000 $92.560 $102.000 $138.000 $92.000
CONC MEDIAN(MONO NOSE)
SY 27.000 $100.000 $98.350 $309.000 $135.000 $1,120.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $3,000.000 $1,208.840 $1,095.000 $1,457.000 $1,030.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 1.000 $3,000.000 $4,513.210 $4,090.000 $5,057.000 $3,900.000
CONDT (PVC) (SCH 40) (2")
LF 224.000 $10.000 $14.670 $13.290 $17.000 $11.900
CONDT (PVC) (SCH 40) (2") (BORE)
LF 100.000 $20.000 $17.410 $15.780 $17.000 $14.100
ELEC CONDR (NO.8) INSULATED
LF 960.000 $1.500 $1.560 $1.410 $4.000 $1.520
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,000.000 $1,079.400 $978.000 $1,387.000 $775.000
REMOVE GROUND BOX
EA 2.000 $110.000 $661.750 $600.000 $447.000 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 22.000 $440.000 $557.140 $505.000 $505.000 $537.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 5.000 $600.000 $730.730 $662.000 $662.000 $595.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $500.000 $630.950 $572.000 $572.000 $679.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $700.000 $791.290 $717.000 $717.000 $800.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $350.000 $418.350 $379.000 $379.000 $642.000
REMOVE SM RD SN SUP&AM
EA 37.000 $80.000 $59.970 $54.000 $88.000 $63.150
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 50.000 $1.750 $1.800 $1.630 $2.000 $3.150
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 3,880.000 $1.700 $1.800 $1.630 $2.000 $1.580
WK ZN PAV MRK REMOV (W)(ARROW)
EA 16.000 $190.000 $245.860 $223.000 $223.000 $158.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 16.000 $190.000 $245.860 $223.000 $223.000 $184.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 32,089.000 $0.700 $0.840 $0.760 $1.000 $0.760
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,375.000 $1.000 $0.650 $1.000 $1.000 $3.000
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 40.000 $0.600 $3.600 $3.260 $3.000 $1.580
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 6,905.000 $1.000 $0.960 $0.870 $1.000 $1.370
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 207.000 $3.000 $4.670 $4.230 $4.000 $3.160
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 3,067.000 $7.000 $6.600 $5.980 $6.000 $6.050
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 40.000 $170.000 $149.920 $136.000 $136.000 $158.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 40.000 $170.000 $149.920 $136.000 $136.000 $179.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 3,950.000 $0.650 $1.030 $0.930 $1.000 $0.510
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 190.000 $0.500 $1.440 $1.300 $1.000 $0.580
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 760.000 $0.500 $1.440 $1.300 $1.000 $0.580
REFL PAV MRKR TY I-C
EA 7.000 $4.000 $11.990 $11.000 $11.000 $6.320
REFL PAV MRKR TY II-A-A
EA 19.000 $4.000 $7.200 $7.000 $6.500 $15.000
REFL PAV MRKR TY II-C-R
EA 580.000 $4.000 $6.000 $5.430 $5.000 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 6,009.000 $0.550 $0.420 $0.380 $0.500 $1.680
ELIM EXT PAV MRK & MRKS (8")
LF 1,578.000 $0.750 $0.420 $0.380 $0.500 $0.740
RELOCATE PED POLE ASSEMBLY
EA 1.000 $2,100.000 $772.040 $700.000 $2,175.000 $920.000
RELOCATE PED PUSH BUTTON POST ASSEM
EA 1.000 $1,300.000 $661.750 $600.000 $1,087.000 $920.000
TREE TRIMMING AND BRUSH REMOVAL
LF 100.000 $10.000 $20.000 $79.700 $22.000 $82.000
SP MIXES SP-B PG64-22
TON 252.000 $100.000 $124.530 $109.000 $170.000 $96.600
UNDERSEAL COURSE
GAL 9,659.000 $2.840 $4.610 $4.450 $3.000 $7.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $5,000.000 $6,836.210 $1,170.000 $7,950.000 $1,000.000
TMA (STATIONARY)
DAY 96.000 $150.000 $250.430 $245.000 $164.000 $250.000
TMA (MOBILE OPERATION)
DAY 25.000 $150.000 $250.430 $715.000 $164.000 $1,000.000
Totals: $1,349,104.760 $1,423,096.938 $1,451,213.040 $1,603,233.800 $1,669,681.360