REMOVING CONC (SIDEWALKS)
|
SY
|
270.000
|
$11.000
|
$30.000
|
$12.000
|
$20.000
|
|
|
|
REMOVING CONC (CURB)
|
LF
|
15.000
|
$6.000
|
$14.000
|
$96.000
|
$25.000
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
57.000
|
$24.000
|
$11.000
|
$90.000
|
$25.000
|
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
657.000
|
$20.000
|
$26.000
|
$30.500
|
$30.000
|
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
237.000
|
$138.000
|
$50.000
|
$50.000
|
$80.000
|
|
|
|
BLOCK SODDING
|
SY
|
72.000
|
$3.600
|
$8.000
|
$8.700
|
$8.000
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
2,599.000
|
$1.000
|
$0.750
|
$0.820
|
$0.750
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
1,302.000
|
$1.000
|
$0.750
|
$0.820
|
$0.750
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
1,302.000
|
$1.000
|
$0.750
|
$0.820
|
$0.750
|
|
|
|
VEGETATIVE WATERING
|
MG
|
26.700
|
$20.000
|
$25.000
|
$33.000
|
$15.000
|
|
|
|
SUPERPAVE MIXTURES SP-C PG70-22
|
TON
|
27,680.000
|
$75.000
|
$68.000
|
$68.500
|
$83.000
|
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
|
TON
|
3,893.000
|
$75.000
|
$82.000
|
$76.000
|
$85.000
|
|
|
|
TOM (ASPHALT) PG 70-22
|
TON
|
386.000
|
$55.000
|
$103.000
|
$105.000
|
$108.000
|
|
|
|
TOM - F (AGGREGATE) SAC - A
|
TON
|
5,374.000
|
$100.000
|
$103.000
|
$105.000
|
$108.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(17")
|
SY
|
6,173.000
|
$60.000
|
$64.000
|
$72.300
|
$75.000
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
84,307.000
|
$1.200
|
$0.800
|
$2.100
|
$1.600
|
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
11,393.000
|
$1.120
|
$0.800
|
$2.500
|
$1.300
|
|
|
|
PLANE ASPH CONC PAV(MICRO-MLLING)(3/4")
|
SY
|
138,728.000
|
$1.100
|
$0.800
|
$1.170
|
$0.600
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
452.000
|
$450.000
|
$430.000
|
$466.000
|
$450.000
|
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
138.000
|
$22.000
|
$58.000
|
$65.200
|
$85.000
|
|
|
|
RAIL (HANDRAIL)(TY C)
|
LF
|
8.000
|
$250.000
|
$250.000
|
$360.000
|
$400.000
|
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
246.000
|
$110.000
|
$98.000
|
$113.000
|
$120.000
|
|
|
|
ADJUSTING MANHOLES
|
EA
|
2.000
|
$850.000
|
$750.000
|
$900.000
|
$1,500.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$225,525.000
|
$100,000.000
|
$137,600.000
|
$243,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$1,800.000
|
$3,500.000
|
$2,700.000
|
$2,500.000
|
|
|
|
LANDSCAPE PAVERS
|
SY
|
161.000
|
$75.000
|
$75.000
|
$125.000
|
$100.000
|
|
|
|
COLORED TEXTURED CONC (6"-17")
|
SY
|
18.000
|
$120.000
|
$200.000
|
$700.000
|
$200.000
|
|
|
|
CONC CURB (TY II)
|
LF
|
25.000
|
$25.000
|
$29.000
|
$156.000
|
$40.000
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
235.000
|
$19.000
|
$30.000
|
$35.000
|
$30.000
|
|
|
|
CONC CURB (LANDSCAPE)
|
LF
|
49.000
|
$23.000
|
$30.000
|
$40.500
|
$40.000
|
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
629.000
|
$25.000
|
$22.000
|
$28.500
|
$36.000
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
464.000
|
$15.000
|
$16.000
|
$38.000
|
$20.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,110.000
|
$15.000
|
$22.000
|
$21.000
|
$20.000
|
|
|
|
DRIVEWAYS (ACP AND CONCRETE)
|
SY
|
47.000
|
$50.000
|
$115.000
|
$270.000
|
$100.000
|
|
|
|
CONC SIDEWALKS (5")
|
SY
|
290.000
|
$45.000
|
$55.000
|
$56.000
|
$70.000
|
|
|
|
CONC SIDEWALKS (6")
|
SY
|
107.000
|
$60.000
|
$75.000
|
$90.000
|
$85.000
|
|
|
|
CURB RAMPS (TY 1)
|
EA
|
16.000
|
$1,750.000
|
$1,700.000
|
$2,500.000
|
$1,750.000
|
|
|
|
CURB RAMPS (TY 5)
|
EA
|
6.000
|
$2,500.000
|
$2,700.000
|
$2,500.000
|
$2,500.000
|
|
|
|
CURB RAMPS (TY 7)
|
EA
|
1.000
|
$1,500.000
|
$1,900.000
|
$2,700.000
|
$1,750.000
|
|
|
|
CURB RAMPS (SPECIAL)
|
SY
|
4.000
|
$150.000
|
$390.000
|
$300.000
|
$250.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
48,148.000
|
$0.100
|
$0.300
|
$0.180
|
$0.150
|
|
|
|
CONCRETE MEDIAN (NOSE)
|
SY
|
10.000
|
$80.000
|
$110.000
|
$650.000
|
$200.000
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,100.000
|
$19.000
|
$21.000
|
$22.820
|
$18.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,950.000
|
$2,200.000
|
$2,337.000
|
$1,550.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
14.000
|
$1,200.000
|
$1,300.000
|
$1,359.000
|
$950.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
150.000
|
$2.600
|
$5.000
|
$5.400
|
$3.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,300.000
|
$2,600.000
|
$2,800.000
|
$2,450.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$150.000
|
$350.000
|
$380.000
|
$200.000
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,311.000
|
$1.150
|
$2.200
|
$1.000
|
$2.100
|
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
70.000
|
$18.000
|
$25.000
|
$28.000
|
$18.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
65.000
|
$450.000
|
$370.000
|
$387.000
|
$460.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
6.000
|
$500.000
|
$450.000
|
$425.000
|
$495.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$550.000
|
$500.000
|
$535.000
|
$545.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
18.000
|
$600.000
|
$540.000
|
$640.000
|
$582.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
2.000
|
$900.000
|
$400.000
|
$422.000
|
$560.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$750.000
|
$600.000
|
$900.000
|
$765.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
5.000
|
$1,100.000
|
$700.000
|
$824.000
|
$805.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$950.000
|
$770.000
|
$1,000.000
|
$845.000
|
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$500.000
|
$370.000
|
$435.000
|
$375.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
105.000
|
$100.000
|
$75.000
|
$76.000
|
$80.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$23.000
|
$29.000
|
$22.000
|
$12.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
36.000
|
$24.000
|
$29.000
|
$22.000
|
$18.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
31.000
|
$24.000
|
$29.000
|
$22.000
|
$18.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
1.000
|
$50.000
|
$45.000
|
$60.000
|
$75.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
200.000
|
$0.200
|
$5.000
|
$5.430
|
$5.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
730.000
|
$0.380
|
$2.000
|
$2.170
|
$2.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
100.000
|
$0.210
|
$5.000
|
$5.430
|
$5.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
380.000
|
$0.200
|
$5.000
|
$5.430
|
$5.000
|
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
240.000
|
$1.000
|
$5.000
|
$5.430
|
$5.000
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,826.000
|
$0.500
|
$1.500
|
$1.630
|
$1.500
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
6,082.000
|
$1.000
|
$0.800
|
$1.000
|
$1.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,594.000
|
$1.000
|
$0.800
|
$1.000
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
823.000
|
$2.100
|
$1.000
|
$1.090
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
17,972.000
|
$0.650
|
$0.630
|
$0.680
|
$0.630
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
954.000
|
$2.300
|
$2.500
|
$2.650
|
$2.440
|
|
|
|
REFL PAV MRK TY I (W)18"(SLD)(090MIL)
|
LF
|
137.000
|
$5.000
|
$5.000
|
$5.430
|
$5.000
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
3,844.000
|
$4.700
|
$5.000
|
$5.430
|
$5.000
|
|
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
20.000
|
$100.000
|
$115.000
|
$123.000
|
$113.000
|
|
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
|
EA
|
6.000
|
$160.000
|
$215.000
|
$230.000
|
$211.000
|
|
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
6.000
|
$100.000
|
$140.000
|
$150.000
|
$137.000
|
|
|
|
REFL PAV MRK TY I (W)(RR XING)(090MIL)
|
EA
|
4.000
|
$500.000
|
$450.000
|
$483.000
|
$444.000
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
34.000
|
$5.000
|
$10.000
|
$11.000
|
$10.000
|
|
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
1,297.000
|
$4.100
|
$5.000
|
$5.400
|
$5.000
|
|
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(090MIL)
|
EA
|
6.000
|
$125.000
|
$350.000
|
$374.000
|
$344.000
|
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,331.000
|
$0.100
|
$0.200
|
$0.220
|
$0.200
|
|
|
|
PAVEMENT SEALER 8"
|
LF
|
749.000
|
$0.250
|
$0.500
|
$0.540
|
$0.500
|
|
|
|
PAVEMENT SEALER 12"
|
LF
|
350.000
|
$0.650
|
$1.350
|
$1.450
|
$1.330
|
|
|
|
PAVEMENT SEALER 24"
|
LF
|
872.000
|
$1.000
|
$2.500
|
$2.680
|
$2.470
|
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
16.000
|
$45.000
|
$65.000
|
$68.500
|
$63.000
|
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
3.000
|
$55.000
|
$68.000
|
$73.000
|
$67.000
|
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
1.000
|
$175.000
|
$250.000
|
$265.000
|
$244.000
|
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
6.000
|
$80.000
|
$150.000
|
$157.000
|
$144.000
|
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
2.000
|
$120.000
|
$250.000
|
$269.000
|
$247.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
16,948.000
|
$0.290
|
$0.360
|
$0.390
|
$0.360
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
30,974.000
|
$0.290
|
$0.360
|
$0.390
|
$0.360
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
1,675.000
|
$0.290
|
$0.360
|
$0.390
|
$0.360
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
47,581.000
|
$0.290
|
$0.360
|
$0.390
|
$0.360
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
146.000
|
$181.900
|
$190.000
|
$205.400
|
$189.000
|
|
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$250.000
|
$450.000
|
$486.000
|
$447.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
123.000
|
$210.000
|
$225.000
|
$240.200
|
$221.000
|
|
|
|
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
|
EA
|
4.000
|
$500.000
|
$280.000
|
$301.000
|
$277.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
773.000
|
$3.300
|
$3.350
|
$3.600
|
$3.300
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
797.000
|
$3.300
|
$3.350
|
$3.600
|
$3.300
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
952.000
|
$2.600
|
$3.350
|
$3.600
|
$3.300
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
820.000
|
$0.460
|
$1.500
|
$1.630
|
$1.500
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
730.000
|
$0.950
|
$2.500
|
$2.720
|
$2.500
|
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
422.000
|
$0.750
|
$3.000
|
$3.260
|
$3.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
3.000
|
$75.000
|
$66.000
|
$70.000
|
$65.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$100.000
|
$66.000
|
$71.000
|
$65.000
|
|
|
|
TRACKLESS TACK COAT
|
GAL
|
70,480.000
|
$2.370
|
$0.000
|
$4.110
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$7,500.000
|
$5,000.000
|
$2,500.000
|
$7,500.000
|
|
|
|
VIVDS PROCESSOR SYSTEM
|
EA
|
3.000
|
$2,450.000
|
$5,000.000
|
$5,434.500
|
$7,900.000
|
|
|
|
VIVDS CAMERA ASSEMBLY
|
EA
|
6.000
|
$1,175.000
|
$2,000.000
|
$2,173.000
|
$900.000
|
|
|
|
VIVDS SET-UP SYSTEM
|
EA
|
2.000
|
$1,026.000
|
$500.000
|
$543.000
|
$1,000.000
|
|
|
|
VIVDS COMMUNICATION CABLE (COAXIAL)
|
LF
|
839.000
|
$1.700
|
$10.000
|
$10.870
|
$4.000
|
|
|
|
RADAR ADVANCED DETECTION DEVICE
|
EA
|
4.000
|
$8,200.000
|
$7,000.000
|
$7,608.000
|
$9,500.000
|
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$8,000.000
|
$7,000.000
|
$1,087.000
|
$12,500.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$250.000
|
$200.000
|
$380.000
|
$250.000
|
|
1
|
|
MEMBRANE UNDERSEAL
|
GAL
|
66,946.000
|
$2.490
|
$2.800
|
$0.000
|
$3.000
|
|
Totals: |
$5,096,576.920
|
$4,710,743.690
|
$5,164,272.910
|
$5,487,573.790
|