Show Job Controls
Bid Cobra

BRAZOS BS 6-R (0049-09-087)

Items: 180

County: BRAZOS
Length: N/A
Highway: BS 6-R
District: BRYAN
Control Number: 0049-09-087
DBE Goal: N/A
Project: C 49-9-87
Guaranty: N/A
Time: 151 WORKING DAYS
Engineer's Estimate: $3,673,380.12
Date: 12/02/2021 (4 years ago)
Contract Number: N/A
Type: INSTALL RAISED MEDIAN
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$3,673,380.12
$4,137,992.91
Over/Under Est: 12.65% $464,612.79
Over/Under Est: 35.13% $1,290,296.76
Amt Left: 19.95% $825,683.97
Over/Under Est: 42.2% $1,550,088.86
Amt Left: 26.23% $1,085,476.07
Delta: -5.23% -$259,792.10
$5,438,827.16
Over/Under Est: 48.06% $1,765,447.04
Amt Left: 31.44% $1,300,834.25
Delta: -4.12% -$215,358.18
Subcontractor Percentage Amount
SARVICUS LLC 25.41% $1,065,164.11
CITYLYNX, INC. 24.18% $1,013,603.63
STRIPE LINES, INC. 2.55% $106,893.68
CEN TEX HYDROSEED, INC. 2.17% $90,964.43
HORSESHOE CONSTRUCTION, INC. 2.05% $85,934.14
BATTEN DRILLING, INC. 0.81% $33,954.46
JOHN WRIGHT CONSTRUCTION 0.64% $26,828.22
BROCK CONSTRUCTION, LLC 0.25% $10,479.77
LANDSHARK HYDROEXCAVATION SERVICES, INC. 0.17% $7,126.25
ELLIOTT CONSTRUCTION, LLC 0.00% $0.00
Total: 58.23% $2,440,948.69

Bid Items & Bid Tabulations

180 Total 0 of 180
BRAZOS  |  BS 6-R  |  BRYAN  |  0049-09-087  |  12/02/2021  |  $3,673,380.12  |  C 49-9-87  |  INSTL RAISED MEDIAN  |  151 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 40.400 $2,500.000 $4,900.000 $357.000 $5,000.000 $1,241.440
REMOVING CONC (PAV)
SY 2,619.000 $5.500 $13.000 $32.000 $34.000 $5.000
REMOVING CONC (RIPRAP)
SY 35.000 $32.000 $7.300 $24.500 $32.000 $24.830
REMOVING CONC (MEDIANS)
SY 93.000 $16.000 $12.000 $421.000 $106.000 $24.830
REMOVING CONC (DRIVEWAYS)
SY 1,202.000 $13.000 $8.300 $30.700 $29.000 $10.630
REMOVING CONC (CURB OR CURB & GUTTER)
LF 3,558.000 $8.000 $5.700 $27.000 $8.000 $5.460
REMOVING CONC (SIDEWALK OR RAMP)
SY 1,569.000 $25.000 $10.000 $23.000 $18.000 $10.630
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 1,800.000 $3.000 $15.000 $11.000 $34.000 $7.680
EXCAVATION (ROADWAY)
CY 1,329.000 $8.500 $22.000 $26.150 $30.000 $26.550
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 908.000 $9.000 $27.000 $40.150 $60.000 $31.040
FURNISHING AND PLACING TOPSOIL (4")
SY 12,235.000 $0.400 $3.100 $2.560 $3.000 $0.900
BLOCK SODDING
SY 8,156.000 $3.500 $4.300 $4.330 $3.900 $5.590
BROADCAST SEED (TEMP) (WARM)
SY 4,079.000 $0.250 $0.300 $0.280 $0.250 $0.170
BROADCAST SEED (TEMP) (COOL)
SY 4,079.000 $0.250 $0.300 $0.280 $0.250 $0.170
VEGETATIVE WATERING
MG 163.000 $22.000 $29.000 $42.000 $20.000 $36.200
LIME (HYDRATED LIME (SLURRY))
TON 2.500 $176.000 $1,300.000 $560.000 $500.000 $467.000
LIME TRT (EXST MATL)(8")
SY 2,162.000 $3.500 $13.500 $14.190 $31.000 $18.620
CM TRT(PT MX)(CL M)(TY D)(GR 4)(FN POS)
CY 695.000 $176.000 $120.000 $143.500 $174.000 $248.290
ASPH (RC-250)
GAL 271.000 $3.780 $8.000 $10.000 $38.000 $18.620
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 8.000 $85.760 $200.000 $395.000 $3,100.000 $620.720
D-GR HMA(SQ) TY-D PG64-22
TON 84.000 $140.000 $140.000 $363.000 $500.000 $496.580
CONC PVMT (CONT REINF - CRCP) (12")
SY 3,291.000 $80.000 $90.500 $81.420 $124.000 $111.280
STRUCT EXCAV
CY 1,279.000 $3.200 $12.500 $36.390 $18.000 $18.620
CEM STABIL BKFL
CY 1,149.000 $80.000 $62.000 $71.900 $108.000 $124.140
CUT & RESTORE CONC PAVING
SY 148.000 $180.000 $110.000 $84.300 $250.000 $160.070
FLOWABLE BACKFILL
CY 25.000 $250.000 $89.500 $167.000 $300.000 $390.680
TRENCH EXCAVATION PROTECTION
LF 1,873.000 $8.900 $0.400 $11.890 $7.000 $12.410
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 176.000 $550.000 $360.000 $385.000 $340.000 $424.570
DRILL SHAFT (RDWY ILL POLE) (24 IN)
LF 84.000 $168.000 $140.000 $200.000 $130.000 $220.980
RIPRAP (CONC)(4 IN)
CY 17.000 $550.000 $450.000 $668.000 $700.000 $386.280
CONC BOX CULV (4 FT X 3 FT)
LF 1,336.000 $260.000 $240.000 $300.000 $416.000 $530.600
RC PIPE (CL III)(24 IN)
LF 405.000 $95.000 $61.000 $86.150 $140.000 $99.110
MANH (COMPL)(PRM)(48IN)
EA 6.000 $4,500.000 $7,000.000 $4,935.000 $8,000.000 $5,449.910
MANH (COMPL)(PRM)(72IN)
EA 2.000 $6,100.000 $11,000.000 $10,117.000 $11,000.000 $10,614.290
INLET (COMPL)(PCO)(4FT)(RIGHT)
EA 3.000 $4,820.000 $6,900.000 $7,800.000 $8,500.000 $8,460.400
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 3.000 $6,870.000 $8,900.000 $11,873.000 $11,500.000 $11,017.760
INLET (COMPL)(PCO)(6FT)(LEFT)
EA 3.000 $8,400.000 $8,700.000 $11,454.000 $11,700.000 $10,521.180
INLET (COMPL)(PCO)(6FT)(RIGHT)
EA 2.000 $8,400.000 $9,200.000 $11,852.000 $12,100.000 $11,781.240
INLET (COMPL)(PCO)(6FT)(BOTH)
EA 1.000 $8,530.000 $10,000.000 $12,900.000 $13,200.000 $13,730.300
INLET (COMPL)(PCU)(6FT)(LEFT)
EA 2.000 $7,000.000 $20,000.000 $9,000.000 $10,400.000 $8,627.990
INLET(COMPL)(PAZD)(FG)(5FTX5FT-3FTX3FT)
EA 3.000 $5,600.000 $7,300.000 $8,728.000 $9,500.000 $9,503.200
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (P)
EA 1.000 $8,600.000 $7,500.000 $15,700.000 $6,300.000 $16,089.030
REMOV STR (INLET)
EA 12.000 $760.000 $300.000 $1,850.000 $1,300.000 $531.880
REMOV STR (MANHOLE)
EA 1.000 $839.370 $300.000 $1,000.000 $1,600.000 $1,241.440
REMOV STR (SET)
EA 2.000 $460.000 $150.000 $650.000 $500.000 $1,241.440
REMOV STR (PIPE)
LF 981.000 $11.500 $19.500 $24.500 $30.000 $13.620
MOBILIZATION
LS 1.000 $350,000.000 $359,000.000 $415,000.000 $350,000.000 $533,818.160
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $6,000.000 $3,000.000 $3,500.000 $12,500.000 $14,897.250
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $28.000 $38.500 $40.000 $35.000 $31.270
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 622.000 $12.700 $26.500 $27.000 $24.000 $23.060
CONSTRUCTION EXITS (REMOVE)
SY 622.000 $4.700 $12.000 $12.000 $5.000 $7.870
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,735.000 $2.500 $3.200 $3.260 $2.900 $2.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,735.000 $1.100 $0.800 $0.840 $0.750 $0.790
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,842.000 $6.200 $6.600 $6.740 $6.000 $3.530
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,842.000 $1.300 $1.100 $1.000 $1.000 $1.240
CONC CURB & GUTTER (TY II)
LF 2,966.000 $21.700 $22.000 $32.890 $33.000 $26.460
DRIVEWAYS (CONC)
SY 497.000 $71.000 $51.500 $108.380 $98.000 $73.720
CONC SIDEWALKS (6")
SY 2,929.000 $56.000 $46.500 $53.450 $66.000 $64.190
CURB RAMPS (TY 7)
EA 9.000 $1,600.000 $1,200.000 $1,500.000 $2,600.000 $1,772.260
CONC MEDIAN
SY 724.000 $60.000 $83.500 $116.800 $124.000 $60.410
CONCRETE MEDIAN (NOSE)
SY 11.000 $98.000 $100.000 $481.000 $400.000 $186.220
REMOVE RD IL ASM (SHOE-BASE)
EA 2.000 $660.000 $390.000 $241.000 $360.000 $266.290
REMOVE RD IL ASM (TRANS-BASE)
EA 4.000 $787.000 $390.000 $241.000 $360.000 $266.290
CONDT (PVC) (SCH 40) (2")
LF 2,065.000 $8.400 $13.000 $8.990 $12.000 $9.930
CONDT (PVC) (SCH 40) (2") (BORE)
LF 500.000 $13.500 $19.500 $19.100 $18.000 $21.100
CONDT (PVC) (SCH 80) (2")
LF 505.000 $9.500 $18.000 $11.520 $16.500 $12.720
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,345.000 $15.900 $23.500 $21.630 $22.000 $23.900
CONDT (PVC) (SCH 80) (4")
LF 215.000 $11.700 $36.000 $25.840 $33.000 $28.550
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,225.000 $20.400 $47.500 $33.710 $43.000 $37.240
ELEC CONDR (NO.12) INSULATED
LF 700.000 $0.900 $1.700 $1.120 $1.600 $1.240
ELEC CONDR (NO.8) INSULATED
LF 5,375.000 $1.300 $1.700 $1.820 $1.600 $2.010
ELEC CONDR (NO.6) BARE
LF 3,040.000 $1.400 $1.900 $1.980 $1.750 $2.180
ELEC CONDR (NO.4) BARE
LF 35.000 $1.600 $2.600 $2.650 $2.400 $2.930
ELEC CONDR (NO.4) INSULATED
LF 70.000 $1.700 $1.900 $3.030 $2.800 $3.350
ELEC CONDR (NO.2) INSULATED
LF 5,130.000 $2.400 $4.300 $3.930 $3.900 $4.350
GROUND BOX TY D (162922)W/APRON
EA 16.000 $1,050.000 $900.000 $1,274.000 $850.000 $1,407.790
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 2.000 $5,220.000 $5,900.000 $6,512.000 $5,400.000 $7,195.370
ALUMINUM SIGNS (TY A)
SF 158.000 $29.180 $31.000 $23.600 $30.000 $47.240
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $440.000 $550.000 $719.000 $550.000 $595.840
REMOVE SM RD SN SUP&AM
EA 28.000 $74.000 $100.000 $95.500 $100.000 $104.940
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 2,303.000 $0.900 $1.500 $0.900 $1.350 $1.490
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 8,364.000 $0.600 $1.000 $0.900 $0.900 $1.120
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 3,710.000 $1.500 $1.900 $1.800 $1.800 $2.300
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 263.000 $6.500 $8.800 $5.620 $8.000 $8.780
WK ZN PAV MRK REMOV (W)(ARROW)
EA 24.000 $180.000 $190.000 $152.000 $170.000 $184.680
WK ZN PAV MRK REMOV (W)(WORD)
EA 25.000 $190.000 $240.000 $152.000 $220.000 $227.390
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,889.000 $0.650 $1.100 $0.900 $1.000 $0.850
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 603.000 $0.600 $3.300 $1.000 $1.000 $1.240
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 86.000 $0.150 $3.300 $1.000 $1.000 $1.530
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 132.000 $1.900 $2.200 $2.000 $2.000 $1.260
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,380.000 $1.000 $1.700 $2.000 $1.500 $1.040
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 352.000 $6.600 $7.700 $6.290 $7.000 $7.490
REFL PAV MRK TY II (W) 4" (BRK)
LF 1,420.000 $0.200 $0.400 $0.510 $0.400 $0.180
REFL PAV MRK TY II (W) 4" (SLD)
LF 630.000 $0.200 $0.400 $0.510 $0.400 $0.160
REFL PAV MRK TY II (W) 8" (DOT)
LF 132.000 $0.500 $0.400 $0.900 $0.400 $0.560
REFL PAV MRK TY II (W) 8" (SLD)
LF 3,380.000 $0.400 $0.400 $0.560 $0.400 $1.030
REFL PAV MRK TY II (W) 24" (SLD)
LF 352.000 $2.800 $5.500 $3.370 $5.000 $3.720
REFL PAV MRK TY II (Y) 4" (BRK)
LF 220.000 $0.120 $0.400 $0.510 $0.400 $0.530
REFL PAV MRK TY II (Y) 4" (SLD)
LF 870.000 $0.200 $0.400 $0.510 $0.400 $0.500
PAVEMENT SEALER 24"
LF 757.000 $1.100 $0.300 $0.730 $0.250 $1.280
PAVEMENT SEALER (ARROW)
EA 25.000 $30.200 $11.000 $28.000 $10.000 $18.620
PAVEMENT SEALER (WORD)
EA 25.000 $31.300 $11.000 $28.000 $10.000 $18.620
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,420.000 $0.800 $0.800 $0.840 $0.700 $0.870
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 630.000 $0.700 $0.800 $1.350 $0.700 $0.930
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 220.000 $0.300 $0.800 $1.350 $0.700 $0.970
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 870.000 $0.600 $0.800 $1.350 $0.700 $0.930
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 757.000 $12.800 $16.500 $16.850 $15.000 $18.620
PREFAB PAV MRK TY C (W) (ARROW)
EA 25.000 $202.000 $240.000 $320.000 $220.000 $266.910
PREFAB PAV MRK TY C (W) (WORD)
EA 25.000 $215.000 $280.000 $320.000 $255.000 $297.950
REFL PAV MRKR TY I-C
EA 58.000 $3.200 $5.500 $5.620 $5.000 $7.450
REFL PAV MRKR TY II-A-A
EA 22.000 $2.900 $5.500 $6.740 $5.000 $8.690
REFL PAV MRKR TY II-C-R
EA 180.000 $3.500 $5.500 $5.060 $5.000 $6.210
ELIM EXT PAV MRK & MRKS (4")
LF 15,926.000 $0.300 $0.400 $0.290 $0.320 $0.630
ELIM EXT PAV MRK & MRKS (8")
LF 2,875.000 $0.700 $0.900 $0.570 $0.800 $0.990
ELIM EXT PAV MRK & MRKS (24")
LF 552.000 $1.600 $2.400 $1.380 $2.200 $5.030
ELIM EXT PAV MRK & MRKS (ARROW)
EA 13.000 $70.000 $38.500 $39.000 $35.000 $84.420
ELIM EXT PAV MRK & MRKS (WORD)
EA 12.000 $82.000 $44.000 $39.000 $40.000 $93.110
PAV SURF PREP FOR MRK (4")
LF 2,270.000 $0.100 $0.010 $0.220 $0.010 $0.250
PAV SURF PREP FOR MRK (8")
LF 3,512.000 $0.300 $0.010 $0.020 $0.010 $0.500
PAV SURF PREP FOR MRK (24")
LF 1,109.000 $0.700 $0.010 $0.060 $0.010 $0.740
PAV SURF PREP FOR MRK (ARROW)
EA 25.000 $10.900 $0.010 $11.240 $0.010 $12.410
PAV SURF PREP FOR MRK (WORD)
EA 25.000 $11.700 $0.010 $11.240 $0.010 $12.410
INSTALL HWY TRF SIG (SYSTEM)
EA 2.000 $28,700.000 $31,000.000 $41,177.000 $29,000.000 $45,498.690
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,800.000 $4,600.000 $2,892.000 $4,200.000 $3,195.460
TEMP TRAF SIGNALS
EA 1.000 $50,000.000 $46,000.000 $75,433.000 $60,000.000 $83,351.360
VEH SIG SEC (12")LED(GRN)
EA 20.000 $153.000 $210.000 $184.500 $200.000 $203.910
VEH SIG SEC (12")LED(GRN ARW)
EA 14.000 $150.000 $210.000 $185.000 $200.000 $204.840
VEH SIG SEC (12")LED(YEL)
EA 20.000 $157.000 $210.000 $185.000 $200.000 $204.840
VEH SIG SEC (12")LED(YEL ARW)
EA 20.000 $146.000 $210.000 $185.000 $200.000 $204.840
VEH SIG SEC (12")LED(RED)
EA 20.000 $156.000 $210.000 $185.000 $200.000 $204.840
VEH SIG SEC (12")LED(RED ARW)
EA 10.000 $148.000 $210.000 $185.000 $200.000 $204.840
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $460.000 $560.000 $565.000 $550.000 $624.440
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 24.000 $99.000 $160.000 $138.000 $150.000 $152.700
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 2.000 $143.000 $180.000 $169.000 $170.000 $186.220
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 4.000 $140.000 $210.000 $191.000 $190.000 $211.040
TRF SIG CBL (TY A)(14 AWG)(1 CONDR)
LF 3,815.000 $1.350 $1.400 $1.350 $1.300 $1.490
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,620.000 $1.700 $2.100 $2.130 $1.900 $2.360
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 2,795.000 $2.300 $2.300 $2.250 $2.100 $2.480
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 3,055.000 $3.000 $2.700 $2.580 $2.500 $2.860
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 2,560.000 $1.700 $1.700 $1.800 $1.600 $1.990
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 1.000 $25,125.000 $35,000.000 $37,900.000 $32,000.000 $41,878.660
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $28,770.000 $37,000.000 $39,424.000 $34,000.000 $43,562.040
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 2.000 $16,600.000 $38,000.000 $40,635.000 $35,000.000 $44,900.310
INS TRF SIG PL AM(S)1 ARM(65')
EA 1.000 $25,355.590 $34,000.000 $37,274.000 $32,000.000 $41,187.170
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 3.000 $19,700.000 $39,000.000 $41,606.000 $36,000.000 $45,974.160
PED POLE ASSEMBLY
EA 10.000 $1,660.000 $2,200.000 $2,205.000 $2,000.000 $2,436.940
PED DETECT PUSH BUTTON (APS)
EA 12.000 $620.000 $840.000 $941.500 $770.000 $1,040.320
SP MIXES SP-B PG64-22
TON 715.000 $95.000 $110.000 $115.200 $160.000 $172.810
SP MIXES SP-C SAC-A PG76-22
TON 325.000 $95.000 $120.000 $177.000 $190.000 $177.050
BONDING COURSE
GAL 183.000 $4.000 $15.000 $3.500 $12.000 $5.320
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $6,750.000 $4,700.000 $2,800.000 $10,000.000 $3,724.310
ITS SYSTEM SUPPORT EQUIPMENT
LS 2.000 $2,200.000 $3,500.000 $8,889.000 $3,500.000 $9,822.250
ITS COM CBL (ETHERNET)
LF 140.000 $2.600 $0.200 $2.310 $1.000 $2.560
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 7,645.000 $4.250 $4.000 $4.160 $3.600 $4.590
ITS MULTI-DUCT CND (PVC-80)
LF 3,220.000 $23.650 $33.000 $33.840 $31.000 $37.390
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 460.000 $29.530 $69.500 $31.650 $64.000 $34.970
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 2.000 $5,640.000 $9,500.000 $7,471.000 $8,700.000 $8,255.560
TMA (STATIONARY)
DAY 150.000 $181.000 $160.000 $427.000 $150.000 $124.140
TMA (MOBILE OPERATION)
DAY 2.000 $129.000 $160.000 $880.000 $250.000 $620.720
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 3.000 $6,386.970 $6,400.000 $6,676.000 $5,800.000 $6,461.680
IN RD IL AM (TY ST) 35T-15 (250W) S
EA 14.000 $1,000.000 $7,100.000 $7,820.000 $6,500.000 $5,958.900
VIVDS PROSR SYS
EA 2.000 $8,040.000 $9,900.000 $10,145.000 $9,000.000 $9,993.570
VIVDS CAM ASSY VAR LNS
EA 8.000 $1,560.000 $1,700.000 $1,894.000 $1,600.000 $2,296.660
VIVDS CNTRL SOFTWARE
EA 2.000 $920.000 $520.000 $250.000 $500.000 $217.250
VIVDS CABLING
LF 2,065.000 $1.400 $2.600 $1.570 $2.500 $2.790
SANITARY SEWER (6 IN) (PVC) (SDR 26)
LF 10.000 $60.000 $300.000 $331.430 $250.000 $71.510
SANITARY SEWER (8 IN) (PVC) (SDR 26)
LF 189.000 $60.000 $310.000 $342.670 $255.000 $82.090
MANHOLE (SAN SEWER) ( 4' DIA)
EA 4.000 $5,000.000 $13,000.000 $13,347.000 $11,100.000 $6,232.020
JCK BOR OR TUN CSNG(STL)(SAN SWR)(16IN)
LF 57.000 $100.000 $780.000 $758.360 $1,050.000 $620.720
ABANDON SANITARY SEWER (6IN)
EA 563.000 $100.000 $18.000 $56.180 $15.000 $310.360
CUT AND RESTORE PAVEMENT
SY 176.000 $100.000 $65.000 $90.000 $260.000 $217.250
CONNECTION TO EXIST MANHOLE (SAN SWR)
EA 2.000 $100.000 $1,200.000 $2,174.000 $1,000.000 $1,862.160
CONNECT EXIST SAN SWR TO MANHOLE
EA 1.000 $5,000.000 $1,200.000 $2,174.000 $1,000.000 $3,103.590
PRE-CONSTRUCTION TELEVISION INSPECTION
LF 781.000 $50.000 $4.900 $5.600 $4.000 $12.410
POST CONSTRUCTION TELEVISION INSPECTION
LF 848.000 $50.000 $4.900 $5.600 $4.000 $3.480
ABANDON MANHOLE
EA 1.000 $672.300 $3,800.000 $5,730.000 $3,200.000 $1,669.240
BYPASS PUMPING
LS 1.000 $38,797.000 $6,100.000 $21,350.000 $5,000.000 $72,246.080
SERVICE LATERALS
LF 30.000 $5.000 $120.000 $450.000 $100.000 $2,482.880
PIPE BURST HOST PIPE (6IN TO 8IN)(COMP)
LF 410.000 $300.000 $250.000 $640.400 $210.000 $124.140
HORIZ DIRECTIONAL DRILL (SAN SEWER)(8")
LF 371.000 $200.000 $180.000 $449.400 $150.000 $155.180
Totals: $3,673,380.120 $4,137,992.910 $4,963,676.880 $5,223,468.980 $5,438,827.166