BRAZORIA SH0288 (6364-36-001)

Items: 59

County: BRAZORIA
Length: N/A
Highway: SH0288
District: HOUSTON
Control Number: 6364-36-001
DBE Goal: N/A
Project: RMC - 636436001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $356,463.50
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$356,463.50
$344,376.00
Over/Under Est: -3.39% -$12,087.50
Over/Under Est: -1.48% -$5,271.00
Amt Left: 1.98% $6,816.50

Bid Items & Bid Tabulations

59 Total 0 of 59
BRAZORIA  |  SH0288  |  HOUSTON  |  6364-36-001  |  08/06/2020  |  $356,463.50  |  RMC - 636436001  |  GUARDRAIL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
ISI CONTRACTING, INC.
REMOVING CONCRETE(MOW STRIP)
LF 132.000 $10.000 $8.000 $10.000
REMOVING CONC (CCA SLAB)
SY 10.000 $15.000 $100.000 $10.000
REMOVING STAB BASE AND ASPH PAV (4")
SY 70.000 $15.000 $40.000 $12.000
CONC STR REPAIR (STANDARD)
SF 7.000 $95.000 $50.000 $95.000
RIPRAP (MOW STRIP)(4 IN)
CY 42.000 $675.000 $400.000 $675.000
MOBILIZATION (CALLOUT)
EA 15.000 $200.000 $100.000 $200.000
MOBILIZATION (EMERGENCY)
EA 3.000 $800.000 $2,000.000 $800.000
PORT CTB (MOVE)(F-SHAPE)(TY 4)
LF 240.000 $5.000 $30.000 $6.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 90.000 $18.000 $30.000 $18.000
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $20.000 $20.000 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 25.000 $55.000 $28.000 $37.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 9.000 $2,400.000 $1,400.000 $2,400.000
SHORT RADIUS
LF 219.000 $45.000 $30.000 $43.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 3.000 $790.000 $1,500.000 $790.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,200.000 $1,150.000 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $600.000 $800.000 $500.000
REMOVE METAL BEAM GUARD FENCE
LF 325.000 $1.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,900.000 $3,200.000 $2,900.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $750.000 $1,000.000 $750.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 1.000 $26,000.000 $19,000.000 $26,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 1.000 $31,000.000 $19,000.000 $31,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,150.000 $15.000 $20.000 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 20.000 $15.000 $70.000 $15.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 10.000 $30.000 $50.000 $30.000
REM/REPAIR RAIL ELEMENT (CURVED RAIL)
LF 25.000 $30.000 $40.000 $28.000
RAISE RAIL ELEMENT
LF 100.000 $5.000 $12.000 $5.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 100.000 $40.000 $22.000 $40.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 100.000 $45.000 $60.000 $45.000
REM / REPL STEEL POST W / CONC FND
EA 1.000 $110.000 $200.000 $80.000
REPAIR STEEL POST WITH BASE PLATE
EA 3.000 $225.000 $200.000 $225.000
REALIGN POSTS
EA 18.000 $8.000 $50.000 $8.000
REMOVE & REPLACE BLOCKOUT
EA 63.000 $10.000 $15.000 $9.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,125.000 $23.000 $28.000 $23.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 98.000 $44.000 $80.000 $44.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 17.000 $3,000.000 $3,100.000 $2,900.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 27.000 $1,000.000 $800.000 $975.000
REM & RESET SGT IMPACT HEAD
EA 6.000 $100.000 $200.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 23.000 $75.000 $65.000 $90.000
REPLACE SGT CABLE ANCHOR
EA 23.000 $70.000 $70.000 $85.000
REPLACE SGT STRUT
EA 14.000 $60.000 $65.000 $90.000
REPLACE SGT OBJECT MARKER
EA 29.000 $25.000 $15.000 $25.000
REMOVE AND REPLACE LONG SPAN CRT POST
EA 2.000 $55.000 $200.000 $55.000
REMOVE AND REPLACE DAT
EA 1.000 $1,200.000 $1,500.000 $1,200.000
REPLACE POSTS (TL-3)
EA 36.000 $105.000 $140.000 $125.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 1.000 $300.000 $600.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 1.000 $35.000 $500.000 $35.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 1.000 $1,150.000 $3,000.000 $900.000
CHECK / RE-TENSION CABLE
EA 3.000 $250.000 $400.000 $225.000
REPAIR (TRACC)
LF 5.000 $100.000 $400.000 $100.000
REPAIR (ENERGY ABSORB SYS) (GDRAIL)
EA 2.000 $2,000.000 $4,000.000 $2,000.000
REPAIR REACT (MISC) (HARDWARE)
EA 1.000 $1,000.000 $1,000.000 $1,000.000
REPAIR REACT (CYLINDERS)
EA 1.000 $3,200.000 $1,000.000 $3,200.000
REPAIR (SHORTRACC)
LF 10.000 $220.000 $300.000 $200.000
REPAIR TAU II (N)
LF 10.000 $425.000 $200.000 $400.000
REPAIR TAU II (W)
LF 10.000 $500.000 $200.000 $475.000
REPAIR (SMTC) (N)
LF 10.000 $125.000 $200.000 $125.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 15.000 $20.000 $50.000 $20.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 12.500 $5.000 $100.000 $5.000
TMA (STATIONARY)
DAY 50.000 $270.000 $100.000 $220.000
Totals: $356,463.500 $344,376.000 $351,192.500