County: BRAZORIA Highway: CS Date: 02/01/2023 (1 year ago) Engineer's Estimate: $2,586,489 Control Number: 0912-72-558
Project: BR 2022(517) District: HOUSTON Time: 171 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,586,488.60
ARANDA BROTHERS CONSTRUCTION CO., INC.   $2,503,743.90 1
-3.2% | -$82,744.70
JOHN REED AND COMPANY, LLC   $2,671,421.13 2
3.28% | $84,932.53
6.7% | $167,677.23
STERLING DELAWARE HOLDING COMPANY, INC.   $2,828,627.73 3
9.36% | $242,139.13
12.98% | $324,883.83
5.88% | $157,206.60
TEXAS MATERIALS GROUP, INC.   $2,979,189.54 4
15.18% | $392,700.94
18.99% | $475,445.64
5.32% | $150,561.81
NBG CONSTRUCTORS, INC.   $3,099,873.84 5
19.85% | $513,385.24
23.81% | $596,129.94
4.05% | $120,684.30
R CONSTRUCTION CIVIL, LLC   $3,157,184.54 6
22.06% | $570,695.94
26.1% | $653,440.64
1.85% | $57,310.70
Subcontractor Percentage Amount
BELL BOTTOM FOUNDATION CO. 1.52% $38,056.91
DORAN STEEL, INC. 0.17% $4,256.36
HOUSTON SAWING & DRILLING 0.13% $3,254.87
CURB PLANET INC. 0.03% $751.12
Total: 1.85% $46,319.26

Bid Items

Items: 82, 0 filtered
BRAZORIA CS  |  HOUSTON  |  0912-72-558  |  02/01/2023  |  $2,586,489  |  BR 2022(517)  |  BRIDGE REPL  |  171 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ARANDA BROTHERS CONSTRUCTION CO., INC. JOHN REED AND COMPANY, LLC STERLING DELAWARE HOLDING COMPANY, INC. TEXAS MATERIALS GROUP, INC. NBG CONSTRUCTORS, INC. R CONSTRUCTION CIVIL, LLC
100 6002 PREPARING ROW STA 6.000 $13,000.000 $40,000.000 $5,000.000 $23,257.000 $13,500.000 $16,000.000 $7,000.000
104 6001 REMOVING CONC (PAV) SY 1,446.000 $7.000 $5.000 $5.000 $7.320 $20.000 $15.000 $25.000
104 6009 REMOVING CONC (RIPRAP) SY 308.000 $10.000 $5.000 $4.000 $4.340 $29.000 $15.000 $30.000
104 6015 REMOVING CONC (SIDEWALKS) SY 35.000 $11.000 $5.000 $5.000 $12.360 $46.000 $16.000 $50.000
110 6001 EXCAVATION (ROADWAY) CY 200.000 $6.500 $8.000 $35.000 $12.000 $44.000 $30.000 $30.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 1,785.000 $20.000 $13.500 $45.000 $30.000 $37.000 $25.000 $25.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 405.000 $15.000 $13.500 $45.000 $30.000 $76.000 $27.000 $25.000
132 6035 EMBANK(FINAL)(DC)(TY E)(CSBE) CY 1,600.000 $45.000 $70.000 $70.000 $75.000 $71.000 $80.000 $60.000
162 6002 BLOCK SODDING SY 2,112.000 $4.800 $5.000 $4.500 $6.320 $5.500 $6.000 $6.000
162 6003 STRAW OR HAY MULCH SY 2,112.000 $0.200 $1.000 $0.300 $2.840 $1.500 $0.900 $3.000
164 6041 DRILL SEEDING (TEMP) (WARM) SY 1,056.000 $0.100 $1.000 $0.250 $2.220 $1.000 $0.450 $2.250
164 6043 DRILL SEEDING (TEMP) (COOL) SY 1,056.000 $0.100 $1.000 $0.250 $2.220 $1.000 $0.450 $2.250
166 6001 FERTILIZER AC 0.880 $670.000 $2,500.000 $750.000 $2,321.160 $2,000.000 $1,500.000 $2,500.000
168 6001 VEGETATIVE WATERING MG 106.000 $30.000 $60.000 $20.000 $21.000 $27.000 $50.000 $30.000
260 6012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 17.000 $290.000 $300.000 $185.000 $260.000 $260.000 $280.000 $350.000
260 6073 LIME TRT (SUBGRADE)(8") SY 966.000 $6.750 $5.000 $8.000 $12.000 $26.000 $12.000 $10.000
360 6002 CONC PVMT (CONT REINF - CRCP) (8") SY 860.000 $100.000 $75.000 $98.000 $115.000 $104.000 $75.000 $88.000
360 6050 CONC PAV (CONT REINF)(FAST TRK)(11") SY 667.000 $110.000 $98.500 $110.000 $137.000 $140.000 $200.000 $115.000
400 6005 CEM STABIL BKFL CY 26.000 $50.000 $70.000 $90.000 $60.000 $60.000 $80.000 $50.000
400 6009 CEMENT STAB BACKFILL (INLET OR MH) CY 58.000 $50.000 $70.000 $90.000 $60.000 $60.000 $80.000 $50.000
402 6001 TRENCH EXCAVATION PROTECTION LF 580.000 $3.000 $2.000 $4.000 $1.000 $2.000 $2.000 $5.000
403 6001 TEMPORARY SPL SHORING SF 1,227.000 $15.000 $30.000 $3.000 $13.000 $27.000 $2.000 $50.000
416 6003 DRILL SHAFT (30 IN) LF 1,260.000 $200.000 $285.000 $300.000 $260.000 $235.000 $300.000 $450.000
420 6013 CL C CONC (ABUT) CY 39.200 $1,000.000 $1,100.000 $1,500.000 $1,320.000 $1,600.000 $1,500.000 $1,900.000
420 6029 CL C CONC (CAP) CY 35.800 $1,200.000 $1,150.000 $1,500.000 $2,230.000 $1,700.000 $2,000.000 $1,750.000
420 6037 CL C CONC (COLUMN) CY 42.600 $1,200.000 $1,000.000 $1,500.000 $1,500.000 $1,850.000 $1,500.000 $1,750.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 7,546.000 $20.000 $16.500 $20.000 $19.000 $23.000 $17.000 $22.000
422 6015 APPROACH SLAB CY 113.000 $650.000 $550.000 $900.000 $585.000 $690.000 $850.000 $800.000
423 6005 RETAINING WALL (SPREAD FOOTING) SF 2,802.000 $95.000 $35.000 $80.000 $92.000 $125.000 $135.000 $110.000
425 6011 PRESTR CONC SLAB BEAM (4SB15) LF 148.520 $210.000 $260.000 $250.000 $248.000 $250.000 $210.000 $235.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 1,336.680 $215.000 $260.000 $250.000 $214.000 $250.000 $210.000 $240.000
432 6001 RIPRAP (CONC)(4 IN) CY 3.000 $550.000 $385.000 $600.000 $767.000 $850.000 $1,500.000 $900.000
432 6008 RIPRAP (CONC)(CL B)(RR8&RR9) CY 101.000 $435.000 $405.000 $400.000 $760.000 $670.000 $850.000 $800.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 17.000 $550.000 $380.000 $600.000 $793.000 $900.000 $1,400.000 $1,000.000
442 6007 STR STEEL (MISC NON - BRIDGE) LB 380.000 $15.000 $25.000 $15.000 $24.000 $22.000 $25.000 $32.000
450 6006 RAIL (TY T223) LF 214.000 $175.000 $150.000 $100.000 $187.000 $164.000 $210.000 $200.000
450 6032 RAIL (TY C223) LF 200.000 $140.000 $250.000 $130.000 $250.000 $248.000 $290.000 $235.000
450 6103 RAIL (TY PR11) LF 256.000 $140.000 $150.000 $105.000 $108.000 $156.000 $130.000 $200.000
454 6018 SEALED EXPANSION JOINT (4 IN) (SEJ - M) LF 102.000 $215.000 $205.000 $175.000 $187.000 $246.000 $225.000 $280.000
464 6003 RC PIPE (CL III)(18 IN) LF 68.000 $100.000 $85.000 $140.000 $212.000 $192.000 $160.000 $95.000
465 6665 INLET (COMPL)(TY BB) EA 2.000 $12,000.000 $3,500.000 $5,000.000 $4,200.000 $5,000.000 $6,200.000 $8,500.000
479 6006 ADJUSTING INLET (CAP) EA 2.000 $1,500.000 $750.000 $700.000 $2,600.000 $900.000 $2,500.000 $300.000
496 6002 REMOV STR (INLET) EA 1.000 $740.000 $500.000 $400.000 $690.000 $900.000 $2,000.000 $900.000
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 1.000 $150,000.000 $65,000.000 $133,000.000 $72,000.000 $55,000.000 $130,000.000 $40,000.000
496 6099 REMOVE STR (RAIL) LF 165.000 $30.000 $12.000 $10.000 $10.000 $10.000 $15.000 $30.000
500 6001 MOBILIZATION LS 1.000 $229,966.000 $215,000.000 $250,000.000 $280,000.000 $270,000.000 $300,000.000 $275,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 $8,050.000 $2,500.000 $2,000.000 $2,400.000 $1,400.000 $2,100.000 $4,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 89.000 $38.000 $30.000 $35.000 $48.610 $38.000 $55.000 $50.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 89.000 $15.000 $10.000 $20.000 $17.570 $15.000 $20.000 $18.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 333.000 $40.000 $30.000 $35.000 $43.950 $37.000 $50.000 $45.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 333.000 $10.000 $10.000 $20.000 $13.710 $12.000 $12.000 $14.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 959.000 $4.000 $4.000 $4.000 $5.000 $5.000 $5.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 959.000 $0.700 $1.000 $1.500 $1.460 $1.500 $1.000 $1.500
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 90.000 $5.000 $6.000 $4.500 $6.200 $6.000 $7.000 $6.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 90.000 $1.100 $1.000 $1.500 $2.180 $1.500 $1.000 $2.000
529 6011 CONC CURB (DOWEL) LF 759.000 $12.000 $9.000 $20.000 $14.000 $24.000 $13.000 $4.000
529 6012 CONC CURB (SLOTTED) LF 27.000 $20.000 $15.000 $70.000 $18.000 $56.000 $15.000 $5.000
531 6001 CONC SIDEWALKS (4") SY 158.000 $55.000 $70.000 $111.390 $75.000 $115.000 $120.000 $80.000
531 6004 CURB RAMPS (TY 1) EA 1.000 $2,700.000 $1,650.000 $2,500.000 $1,570.000 $2,700.000 $3,500.000 $2,500.000
531 6010 CURB RAMPS (TY 7) EA 1.000 $2,200.000 $1,650.000 $2,500.000 $1,570.000 $2,700.000 $3,200.000 $2,500.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 138.000 $25.000 $45.000 $27.800 $27.760 $28.000 $28.000 $30.000
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 4.000 $1,300.000 $2,000.000 $1,578.000 $1,578.000 $1,600.000 $1,600.000 $1,600.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000 $1,450.000 $1,500.000 $1,505.000 $1,505.000 $1,600.000 $1,550.000 $1,550.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 611.000 $3.000 $5.000 $1.670 $1.670 $9.000 $3.000 $10.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 $3,400.000 $2,850.000 $3,115.000 $3,115.000 $3,000.000 $3,200.000 $3,000.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 9.000 $500.000 $850.000 $585.000 $585.000 $600.000 $600.000 $600.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 7.000 $22.000 $50.000 $25.000 $25.000 $25.000 $25.000 $25.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 6.000 $35.000 $55.000 $25.000 $25.000 $32.000 $25.000 $32.000
666 6225 PAVEMENT SEALER 6" LF 2,208.000 $0.160 $0.200 $0.010 $0.010 $0.010 $0.010 $0.010
666 6230 PAVEMENT SEALER 24" LF 76.000 $0.270 $0.200 $0.010 $0.010 $0.010 $0.010 $0.010
672 6009 REFL PAV MRKR TY II-A-A EA 14.000 $4.500 $15.000 $10.000 $10.000 $10.000 $10.000 $10.000
678 6002 PAV SURF PREP FOR MRK (6") LF 2,208.000 $0.050 $0.200 $0.050 $0.050 $0.050 $0.050 $0.050
678 6008 PAV SURF PREP FOR MRK (24") LF 76.000 $0.500 $0.250 $0.150 $0.150 $0.150 $0.150 $0.150
5026 6001 ASBESTOS ABATEMENT (COATINGS) SF 400.000 $100.000 $30.000 $25.000 $17.000 $10.000 $30.000 $100.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 1.000 $9,000.000 $18,500.000 $9,000.000 $6,900.000 $10,000.000 $10,000.000 $18,000.000
6038 6004 MULTIPOLYMER PAV MRK (W)(6")(SLD) LF 1,036.000 $0.650 $3.000 $2.750 $2.750 $2.800 $3.000 $3.000
6038 6013 MULTIPOLYMER PAV MRK (W)(24")(SLD) LF 76.000 $7.500 $13.500 $12.500 $12.500 $12.500 $13.000 $12.500
6038 6017 MULTIPOLYMER PAV MRK (Y)(6")(SLD) LF 1,172.000 $1.000 $3.500 $2.750 $2.750 $2.800 $3.000 $2.750
7049 6014 WATER MAIN PIPE (PVC) (12IN) (C-900) LF 567.000 $130.000 $70.000 $120.000 $154.000 $152.000 $150.000 $100.000
7049 6029 WATER MAIN PIPE (STL) (12IN) LF 190.000 $300.000 $250.000 $240.000 $310.000 $300.000 $320.000 $260.000
7049 6110 AIR RELEASE/VACUUM RELEASE VALVE (12IN) EA 1.000 $6,500.000 $6,500.000 $960.000 $9,300.000 $3,000.000 $3,700.000 $4,000.000
7049 6220 ABAND/FILL EXIST WATER PIPE (12IN) LF 475.000 $25.000 $20.000 $3.000 $19.000 $26.000 $14.000 $25.000
Totals: $2,586,488.60 $2,503,743.90 $2,671,421.13 $2,828,627.73 $2,979,189.54 $3,099,873.84 $3,157,184.54