Show Job Controls
Bid Cobra

BRAZORIA CR (0912-31-323)

Items: 85

County: BRAZORIA
Length: N/A
Highway: CR
District: HOUSTON
Control Number: 0912-31-323
DBE Goal: N/A
Project: BR 2022(986)
Guaranty: N/A
Time: 349 WORKING DAYS
Engineer's Estimate: $3,999,103.16
Date: 09/07/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,999,103.16
$3,799,246.85
Over/Under Est: -5% -$199,856.31
$4,246,590.10
Over/Under Est: 6.19% $247,486.94
Amt Left: 11.77% $447,343.25
Over/Under Est: 9.58% $382,915.93
Amt Left: 15.34% $582,772.24
Delta: -3.19% -$135,428.99
Subcontractor Percentage Amount
WEBER-BALKE FOUNDATION COMPANY, INC 5.87% $225,741.78
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 3.25% $124,984.80
TRAFFIC SIGNS & LINES, LLC 2.40% $92,296.47
CHERRY MOVING COMPANY, INC. 1.05% $40,379.71
STRIPES & STOPS COMPANY, INC. 0.87% $33,457.47
DORAN STEEL, INC. 0.57% $21,920.41
SK CONCRETE SERVICES LLC 0.36% $13,844.47
LONESTAR TRAFFIC SAFETY, LLC 0.30% $11,537.06
SCOTT DERR PAINTING CO, LLC 0.22% $8,460.51
Total: 14.89% $572,622.68

Bid Items & Bid Tabulations

85 Total 0 of 85
BRAZORIA  |  CR  |  HOUSTON  |  0912-31-323  |  09/07/2023  |  $3,999,103.16  |  BR 2022(986)  |  BRIDGE REPL  |  349 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MAIN LANE INDUSTRIES LTD.
C. E. BARKER, LTD.
HARPER BROTHERS CONSTRUCTION LLC
PREPARING ROW
STA 20.560 $15,000.000 $4,000.000 $10,710.000 $6,425.000
RMV TRT & UNTRT BASE & ASPH PV(12"-18")
SY 3,114.000 $18.000 $10.000 $13.990 $10.000
EXCAVATION (ROADWAY)
CY 1,097.000 $30.000 $25.000 $14.730 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 3,701.000 $30.000 $25.000 $19.640 $30.000
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 1,155.000 $70.000 $65.000 $32.730 $100.000
BLOCK SODDING
SY 2,865.000 $5.400 $8.000 $7.850 $8.070
STRAW OR HAY MULCH
SY 2,865.000 $0.300 $5.000 $0.560 $5.050
BROADCAST SEED (TEMP) (WARM)
SY 2,865.000 $0.400 $2.000 $0.960 $2.210
FERTILIZER
AC 1.190 $1,350.000 $5,500.000 $841.500 $5,627.220
VEGETATIVE WATERING
MG 44.700 $150.000 $75.000 $107.290 $75.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 5,350.000 $40.000 $45.000 $42.640 $50.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 101.000 $300.000 $400.000 $319.770 $325.000
LIME TRT (SUBGRADE)(8")
SY 5,591.000 $7.000 $9.000 $10.800 $15.000
PRIME COAT (MC-30)
GAL 1,277.000 $10.000 $8.000 $5.610 $6.500
STRUCT EXCAV
CY 520.000 $80.000 $12.000 $19.640 $12.500
CEM STABIL BKFL
CY 525.000 $100.000 $50.000 $168.300 $85.000
TRENCH EXCAVATION PROTECTION
LF 122.000 $16.000 $10.000 $5.900 $5.000
DRILL SHAFT (18 IN)
LF 100.000 $160.000 $160.000 $326.640 $200.000
DRILL SHAFT (36 IN)
LF 730.000 $220.000 $500.000 $329.440 $600.000
CL C CONC (ABUT)
CY 89.000 $1,160.000 $1,500.000 $1,734.900 $2,000.000
CL C CONC (RAIL FOUNDATION)
CY 2.500 $1,010.000 $1,500.000 $948.380 $775.000
REINF CONC SLAB
SF 4,648.000 $30.000 $35.000 $35.500 $60.000
APPROACH SLAB
CY 85.000 $700.000 $900.000 $658.210 $775.000
PRESTR CONC GIRDER (TX28)
LF 278.000 $250.000 $225.000 $327.940 $325.000
PRESTR CONC GIRDER (TX34)
LF 337.170 $260.000 $225.000 $315.210 $325.000
RIPRAP (CONC)(5 IN)
CY 272.000 $620.000 $640.000 $548.450 $950.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 109.000 $420.000 $700.000 $645.510 $850.000
RIPRAP (MOW STRIP)(4 IN)
CY 70.000 $565.000 $700.000 $409.890 $850.000
RAIL (TY T223)
LF 528.300 $175.000 $175.000 $298.790 $185.000
ARMOR JOINT (SEALED)
LF 142.000 $150.000 $110.000 $140.250 $225.000
CONC BOX CULV (9 FT X 6 FT)
LF 68.000 $1,200.000 $2,500.000 $1,203.030 $1,725.000
CONC BOX CULV (9FT X 4FT)
LF 32.000 $850.000 $2,400.000 $1,087.940 $525.000
RC PIPE (CL III)(18 IN)
LF 640.000 $110.000 $100.000 $96.220 $40.000
RC PIPE (CL III)(24 IN)
LF 176.000 $120.000 $105.000 $116.090 $185.000
RC PIPE (CL III)(36 IN)
LF 84.000 $230.000 $150.000 $191.740 $315.000
RC PIPE (CL III)(72 IN)
LF 87.000 $500.000 $700.000 $674.960 $850.000
WINGWALL (PW - 2) (HW=10 FT)
EA 2.000 $65,000.000 $30,000.000 $61,289.250 $100,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $1,100.000 $1,250.000 $1,107.980 $2,100.000
SET (TY II) (18 IN) (RCP) (3: 1) (P)
EA 1.000 $1,350.000 $1,250.000 $1,107.980 $2,100.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,400.000 $1,300.000 $1,136.030 $2,200.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,450.000 $1,350.000 $1,248.230 $2,300.000
REMOV STR (PIPE)
LF 681.000 $25.000 $28.000 $21.750 $20.000
REMOV STR (BOX CULVERT)
LF 32.000 $130.000 $350.000 $129.730 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $37,200.000 $25,000.000 $25,245.000 $55,500.000
REMOV STR (RET WALL)
LF 56.000 $100.000 $50.000 $104.990 $100.000
REMOVING ROCK RIPRAP
LF 150.000 $100.000 $1.000 $42.080 $25.000
MOBILIZATION
LS 1.000 $343,736.660 $380,000.000 $477,799.390 $190,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $10,000.000 $700.000 $7,613.890 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 240.000 $42.000 $65.000 $74.760 $75.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 468.000 $35.000 $70.000 $31.660 $60.000
CONSTRUCTION EXITS (REMOVE)
SY 468.000 $10.000 $10.000 $13.820 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,846.000 $3.750 $7.000 $6.730 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,846.000 $1.200 $1.000 $1.680 $1.500
CONSTRUCTING DETOURS
SY 829.000 $110.000 $140.000 $141.510 $50.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 5.000 $6,000.000 $4,200.000 $1,402.500 $4,800.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 360.000 $80.000 $80.000 $50.490 $90.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 360.000 $25.000 $30.000 $19.640 $30.000
DRIVEWAYS (ACP)
SY 1,017.000 $65.000 $80.000 $100.980 $90.000
MTL W-BEAM GD FEN (TIM POST)
LF 750.000 $30.000 $25.000 $27.210 $24.250
MTL BEAM GD FEN TRANS (TL2)
EA 8.000 $1,405.000 $1,000.000 $1,632.510 $1,455.000
SHORT RADIUS
LF 150.000 $60.000 $35.000 $61.710 $55.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 11.000 $1,100.000 $790.000 $1,178.100 $1,050.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,615.000 $1,500.000 $1,755.930 $1,565.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,535.000 $3,250.000 $3,422.100 $3,050.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,450.000 $2,200.000 $1,122.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $20,000.000 $35,000.000 $32,538.000 $8,500.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 2.000 $550.000 $260.000 $799.400 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $700.000 $650.000 $566.610 $505.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $700.000 $650.000 $611.490 $545.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 2.000 $300.000 $60.000 $437.580 $390.000
REMOVE SM RD SN SUP&AM
EA 14.000 $140.000 $60.000 $100.980 $90.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 41.000 $30.000 $30.000 $28.050 $25.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 6.000 $360.000 $220.000 $235.620 $210.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 6.000 $360.000 $220.000 $235.620 $210.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 7.000 $25.000 $20.000 $28.050 $50.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 2,046.000 $1.500 $1.350 $2.240 $2.100
PAVEMENT SEALER 6"
LF 7,764.000 $0.250 $0.550 $0.220 $0.100
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 3,654.000 $0.950 $1.300 $1.680 $1.450
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 4,110.000 $1.000 $1.300 $1.680 $1.450
REFL PAV MRKR TY II-A-A
EA 53.000 $8.000 $7.500 $8.980 $10.000
PAV SURF PREP FOR MRK (6")
LF 7,764.000 $0.200 $0.150 $0.060 $0.050
TACK COAT
GAL 301.000 $10.000 $5.000 $8.980 $6.500
D-GR HMA TY-D SAC-B PG70-22 (EXEMPT)
TON 410.000 $160.000 $225.000 $258.060 $200.000
D-GR HMA TY-D PG70-22 (EXEMPT)
TON 418.000 $180.000 $230.000 $258.060 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,498.000 $160.000 $5.000 $112.200 $25.000
Totals: $3,999,103.160 $3,799,246.850 $4,246,590.121 $4,382,019.092