PREPARING ROW
|
STA
|
12.870
|
$12,000.000
|
$3,000.000
|
$9,600.000
|
$7,500.000
|
|
|
RMV TRT & UNTRT BASE & ASPH PV(12"-18")
|
SY
|
2,589.000
|
$5.500
|
$18.000
|
$15.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
313.000
|
$9.000
|
$40.000
|
$45.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
3,531.000
|
$10.500
|
$28.000
|
$45.000
|
$25.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
1,725.000
|
$50.000
|
$62.000
|
$70.000
|
$90.000
|
|
|
BLOCK SODDING
|
SY
|
2,736.000
|
$3.500
|
$3.500
|
$4.000
|
$6.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
2,736.000
|
$0.500
|
$0.200
|
$0.250
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,736.000
|
$0.150
|
$0.250
|
$0.250
|
$1.000
|
|
|
FERTILIZER
|
AC
|
1.131
|
$650.000
|
$500.000
|
$800.000
|
$1,750.000
|
|
|
VEGETATIVE WATERING
|
MG
|
42.681
|
$20.000
|
$40.000
|
$50.000
|
$80.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
3,892.000
|
$25.000
|
$21.000
|
$40.000
|
$35.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
72.000
|
$200.000
|
$270.000
|
$300.000
|
$210.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
4,005.000
|
$5.000
|
$6.000
|
$3.000
|
$7.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
945.000
|
$5.000
|
$5.500
|
$8.000
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
210.000
|
$50.000
|
$50.000
|
$60.000
|
$80.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
653.000
|
$15.000
|
$100.000
|
$10.000
|
$25.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,352.000
|
$170.000
|
$349.000
|
$360.000
|
$458.000
|
|
|
CL C CONC (ABUT)
|
CY
|
131.200
|
$950.000
|
$1,900.000
|
$1,800.000
|
$1,550.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
13.000
|
$450.000
|
$780.000
|
$1,000.000
|
$1,150.000
|
|
|
REINF CONC SLAB
|
SF
|
7,800.000
|
$18.000
|
$33.000
|
$25.000
|
$22.500
|
|
|
APPROACH SLAB
|
CY
|
149.000
|
$850.000
|
$635.000
|
$600.000
|
$750.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
967.500
|
$170.000
|
$215.000
|
$275.000
|
$260.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
211.000
|
$550.000
|
$525.000
|
$400.000
|
$485.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
96.000
|
$435.000
|
$585.000
|
$400.000
|
$475.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
43.000
|
$700.000
|
$678.000
|
$600.000
|
$650.000
|
|
|
RAIL (TY T223)
|
LF
|
557.500
|
$120.000
|
$183.000
|
$125.000
|
$150.000
|
|
|
RAIL (TY T631LS)
|
LF
|
172.000
|
$90.000
|
$80.000
|
$90.000
|
$225.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
240.000
|
$120.000
|
$237.000
|
$145.000
|
$150.000
|
|
|
CONC BOX CULV (10 FT X 7 FT)
|
LF
|
76.000
|
$900.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
26.000
|
$95.000
|
$114.000
|
$72.000
|
$125.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
138.000
|
$120.000
|
$130.000
|
$97.000
|
$155.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
53.000
|
$125.000
|
$170.000
|
$146.000
|
$195.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
2.000
|
$50,000.000
|
$46,000.000
|
$70,000.000
|
$37,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$3,000.000
|
$2,350.000
|
$2,500.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,000.000
|
$2,550.000
|
$2,500.000
|
$3,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
5.000
|
$3,000.000
|
$2,450.000
|
$2,000.000
|
$4,250.000
|
|
|
SET (TY II) (36 IN) (RCP) (2.5: 1) (C)
|
EA
|
1.000
|
$3,500.000
|
$2,550.000
|
$4,144.000
|
$5,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
50.000
|
$35.000
|
$25.000
|
$10.000
|
$20.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
4.000
|
$35,000.000
|
$22,000.000
|
$66,000.000
|
$50,000.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
36.000
|
$40.000
|
$225.000
|
$100.000
|
$50.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
4.000
|
$200.000
|
$1,000.000
|
$1,800.000
|
$3,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$240,629.270
|
$310,000.000
|
$370,000.000
|
$475,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$7,000.000
|
$7,500.000
|
$12,500.000
|
$6,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
640.000
|
$30.000
|
$30.000
|
$40.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
800.000
|
$30.000
|
$140.000
|
$40.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
800.000
|
$7.500
|
$18.000
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,414.000
|
$2.500
|
$3.250
|
$3.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,414.000
|
$0.750
|
$0.800
|
$1.000
|
$2.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
462.000
|
$100.000
|
$85.000
|
$60.000
|
$40.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$30.000
|
$28.000
|
$38.000
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$1,150.000
|
$1,400.000
|
$1,300.000
|
$1,850.000
|
|
|
SHORT RADIUS
|
LF
|
112.500
|
$270.000
|
$60.000
|
$64.000
|
$75.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$1,000.000
|
$1,200.000
|
$1,300.000
|
$2,150.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
40.000
|
$3.500
|
$5.500
|
$1.000
|
$10.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$350.000
|
$550.000
|
$200.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,300.000
|
$3,500.000
|
$3,000.000
|
$2,550.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
2.000
|
$300.000
|
$400.000
|
$400.000
|
$557.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$520.000
|
$650.000
|
$700.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$580.000
|
$700.000
|
$1,220.000
|
$1,950.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$80.000
|
$90.000
|
$50.000
|
$450.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
16.000
|
$25.000
|
$27.000
|
$30.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
25.000
|
$35.000
|
$32.000
|
$20.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
8.000
|
$300.000
|
$225.000
|
$175.000
|
$1,500.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
8.000
|
$310.000
|
$225.000
|
$175.000
|
$1,500.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$35.000
|
$27.000
|
$15.000
|
$20.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
33.000
|
$5.500
|
$13.000
|
$15.000
|
$20.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
4,502.000
|
$0.200
|
$0.250
|
$0.200
|
$1.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
33.000
|
$1.500
|
$4.500
|
$1.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,744.000
|
$0.500
|
$0.800
|
$2.850
|
$4.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
150.000
|
$0.500
|
$1.000
|
$2.850
|
$4.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,608.000
|
$0.500
|
$0.900
|
$2.850
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
26.000
|
$4.500
|
$8.000
|
$15.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,502.000
|
$0.050
|
$0.400
|
$0.060
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
33.000
|
$0.150
|
$2.250
|
$0.250
|
$1.000
|
|
|
TACK COAT
|
GAL
|
227.000
|
$2.500
|
$5.000
|
$8.000
|
$10.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22 (EXEMPT)
|
TON
|
306.000
|
$180.000
|
$220.000
|
$180.000
|
$250.000
|
|
|
D-GR HMA TY-D PG70-22 (EXEMPT)
|
TON
|
310.000
|
$160.000
|
$220.000
|
$180.000
|
$275.000
|
|
|
ASBESTOS ABATEMENT (COATINGS)
|
SF
|
60.000
|
$820.000
|
$100.000
|
$100.000
|
$470.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
962.000
|
$130.000
|
$50.000
|
$20.000
|
$100.000
|
|
Totals: |
$2,751,921.890
|
$3,440,532.590
|
$3,709,052.320
|
$3,939,754.230
|