BRAZORIA SH 288 (0598-02-116)

Items: 204

County: BRAZORIA
Length: N/A
Highway: SH 288
District: HOUSTON
Control Number: 0598-02-116
DBE Goal: N/A
Project: F 2022(929)
Guaranty: N/A
Time: 629 WORKING DAYS
Engineer's Estimate: $53,828,977.00
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT BRIDGE
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$53,828,977.00
$49,368,479.40
Over/Under Est: -8.29% -$4,460,497.60
Over/Under Est: -8.16% -$4,390,411.55
Amt Left: 0.14% $70,086.05
$51,562,118.80
Over/Under Est: -4.21% -$2,266,858.20
Amt Left: 4.44% $2,193,639.40
Delta: -4.30% -$2,123,553.35
Over/Under Est: -2.3% -$1,238,391.29
Amt Left: 6.53% $3,222,106.31
Delta: -1.99% -$1,028,466.91
Over/Under Est: -2% -$1,074,831.88
Amt Left: 6.86% $3,385,665.72
Delta: -0.31% -$163,559.41
Subcontractor Percentage Amount
JAMES CONSTRUCTION GROUP, LLC 6.55% $3,406,903.58
HB FARMER FOUNDATION, LLC 2.79% $1,451,184.88
QUALITY TURF FARMS, L.C. 2.26% $1,175,511.77
C.G. ANTHONY DELIVERIES, LLC 1.65% $858,227.62
GMJ PAVING COMPANY LLC 1.49% $775,005.55
MILSTEAD HIGHWAY SERVICES, LLC 0.94% $488,929.67
PROFESSIONAL TRAFFIC CONTROL LLC 0.87% $452,520.02
KLP COMMERCIAL, L.L.C. 0.78% $405,707.60
ROMAR UNLIMITED, INC. 0.74% $384,902.08
A&J REBAR LLC 0.66% $343,291.05
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC 0.65% $338,089.67
ALLSTATE SIGNAL & CONSTRUCTION, LLC 0.61% $317,284.15
AARON CONCRETE CONTRACTORS, LLC 0.60% $312,082.77
A BROTHERS MILLING, LLC 0.56% $291,277.25
CREACOM, INC. 0.41% $213,256.56
REPUBLIC TRAFFIC SAFETY, INC. 0.38% $197,652.42
SB FLEET - LUBE, LLC 0.31% $161,242.76
FORDE CONSTRUCTION COMPANY, INC. 0.28% $145,638.63
BLS SERVICES 0.26% $135,235.87
ROADWAY SPECIALTIES, INC. 0.25% $130,034.49
WILLOW CITY SIGN & RAIL, INC. 0.22% $114,430.35
PRIMATE CONSTRUCTION, LP 0.21% $109,228.97
A&J REBAR LLC 0.12% $62,416.55
JRB ENGINEERING, LLC 0.11% $57,215.17
SCOTT DERR PAINTING CO, LLC 0.11% $57,215.17
STEEL EFFECTS 0.10% $52,013.80
YELLOWSTONE LANDSCAPE - CENTRAL, INC. 0.09% $46,812.42
ANTIGO CONSTRUCTION, INC. 0.05% $26,006.90
SB FLEET - LUBE, LLC 0.00% $0.00
Total: 24.05% $12,509,317.72

Bid Items & Bid Tabulations

204 Total 0 of 204
BRAZORIA  |  SH 288  |  HOUSTON  |  0598-02-116  |  08/04/2022  |  $53,828,977.00  |  F 2022(929)  |  CONSTRUCT BRIDGE  |  629 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GRANITE CONSTRUCTION COMPANY
SER CONSTRUCTION PARTNERS, LLC
WEBBER, LLC
JAMES CONSTRUCTION GROUP, LLC
HARPER BROTHERS CONSTRUCTION LLC
PREPARING ROW
STA 107.000 $9,775.000 $14,000.000 $8,100.000 $34,500.000 $9,042.990 $10,000.000
REMOVING CONC (PAV)
SY 18,496.000 $5.800 $5.000 $7.500 $7.200 $3.770 $8.000
REMOVING CONC (RIPRAP)
SY 898.000 $9.200 $4.000 $7.000 $25.000 $6.960 $15.000
REMOVING STAB BASE AND ASPH PAV (2")
SY 43,294.000 $4.000 $1.000 $2.400 $0.950 $0.620 $1.000
REMOVING STAB BASE AND ASPH PAV (3")
SY 40,973.000 $4.600 $1.500 $2.500 $1.450 $1.500 $1.500
REMOVING STAB BASE & ASPH PAV (9")
SY 16,583.000 $9.200 $3.500 $4.100 $4.450 $2.990 $4.500
REMOVING STAB BASE AND ASPH PAV (7")
SY 5,894.000 $5.800 $3.750 $3.600 $3.950 $3.180 $4.000
REMOVING STAB BASE AND ASPH PAV (10")
SY 43,294.000 $11.500 $4.000 $4.700 $4.950 $3.850 $5.750
EXCAVATION (ROADWAY)
CY 70,164.000 $8.000 $4.500 $4.800 $5.000 $6.450 $2.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 342,231.000 $14.000 $13.000 $15.400 $12.000 $18.300 $2.000
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 67,151.000 $50.000 $43.500 $42.400 $50.000 $56.720 $40.000
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
CY 9,104.000 $57.500 $43.500 $42.400 $50.000 $50.990 $60.000
COMPOST MANUF TOPSOIL (4")
SY 516,460.000 $1.700 $0.820 $1.200 $1.350 $0.690 $0.500
BLOCK SODDING
SY 19,616.000 $3.600 $4.960 $4.700 $4.900 $5.200 $4.910
BROADCAST SEED (TEMP) (WARM)
SY 258,236.000 $0.300 $0.080 $0.100 $0.100 $0.160 $0.080
DRILL SEED (TEMP)(WARM OR COOL)
SY 258,236.000 $0.200 $0.090 $0.100 $0.100 $0.160 $0.090
BROADCAST SEED (PERM)(SPECIAL MIX)
SY 516,460.000 $0.200 $0.150 $0.200 $0.150 $0.280 $0.150
FERTILIZER
AC 110.750 $690.000 $694.810 $1,048.000 $688.000 $734.910 $687.860
VEGETATIVE WATERING
MG 13,291.000 $22.000 $34.060 $5.000 $37.750 $38.520 $20.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 14,160.000 $1.200 $1.340 $1.900 $1.350 $1.100 $1.330
LIME TRT (EXST MATL) (6")
SY 130,486.000 $4.000 $4.000 $3.800 $3.000 $2.740 $2.500
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 1,762.000 $230.000 $280.000 $288.700 $290.000 $289.050 $260.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 130,486.000 $12.500 $11.000 $9.300 $12.600 $12.560 $15.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 7,176.000 $120.000 $115.000 $152.000 $121.000 $119.440 $110.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 74,987.000 $77.000 $76.000 $75.000 $66.000 $91.730 $100.000
CONC PVMT (CONT REINF - CRCP) (12")
SY 45,868.000 $110.000 $87.000 $97.000 $76.000 $102.360 $115.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 889.000 $136.900 $160.000 $131.400 $135.000 $250.000 $150.000
STRUCT EXCAV
CY 9,104.000 $5.800 $3.050 $7.400 $15.000 $6.460 $12.500
CEM STABIL BKFL
CY 849.000 $57.500 $76.540 $41.900 $50.000 $58.130 $60.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 221.000 $57.500 $62.290 $21.000 $50.000 $58.130 $60.000
TRENCH EXCAVATION PROTECTION
LF 2,565.000 $4.600 $12.670 $0.100 $5.000 $1.070 $1.000
TEMPORARY SPL SHORING
SF 1,614.000 $11.500 $5.000 $26.400 $8.000 $10.990 $1.000
DRILL SHAFT (18 IN)
LF 206.000 $126.500 $80.000 $95.200 $69.000 $74.580 $110.000
DRILL SHAFT (30 IN)
LF 168.000 $149.500 $150.000 $190.100 $200.000 $222.570 $280.000
DRILL SHAFT (36 IN)
LF 2,647.000 $230.000 $170.000 $174.800 $181.000 $150.290 $375.000
DRILL SHAFT (60 IN)
LF 672.000 $690.000 $500.000 $502.600 $358.000 $436.160 $700.000
DRILL SHAFT (72 IN)
LF 848.000 $747.500 $750.000 $720.000 $851.000 $627.350 $900.000
DRILL SHAFT (78 IN)
LF 384.000 $805.000 $750.000 $813.100 $942.000 $736.120 $1,000.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 21.000 $103.500 $68.030 $123.100 $154.000 $65.000 $135.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 17.000 $138.000 $151.750 $165.600 $197.000 $186.060 $210.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 584.000 $300.000 $326.930 $540.800 $310.000 $310.000 $425.890
CL A CONC (FLUME)
CY 152.000 $690.000 $850.000 $508.000 $634.000 $475.510 $600.000
CL C CONC (ABUT)
CY 247.400 $1,200.000 $1,200.000 $1,174.500 $1,200.000 $837.320 $1,100.000
CL C CONC (COLUMN)
CY 413.400 $1,200.000 $1,300.000 $1,669.400 $1,600.000 $1,709.470 $1,500.000
CL C CONC (SIGN COLUMN)
CY 164.800 $977.500 $1,300.000 $1,244.200 $1,750.000 $1,447.150 $1,575.000
CL C CONC (COLLAR)
EA 4.000 $1,610.000 $350.000 $1,036.500 $5,000.000 $1,973.380 $1,750.000
CL F CONC (CAP)
CY 680.400 $1,200.000 $1,400.000 $916.900 $1,200.000 $888.370 $1,125.000
CL C CONC (SIGN FOOTING)
CY 58.800 $977.500 $1,000.000 $966.900 $1,000.000 $1,025.790 $1,425.000
REINF CONC SLAB
SF 103,275.000 $21.000 $22.000 $23.300 $15.000 $17.530 $25.000
RETAINING WALL (MSE) (WAVE SCHEME)
SF 60,609.000 $51.800 $33.000 $31.000 $51.000 $31.920 $70.000
PRESTR CONC U - BEAM (U54)
LF 10,023.320 $320.000 $335.000 $343.000 $375.000 $349.720 $385.000
RIPRAP (CONC)(5 IN)
CY 95.000 $540.500 $331.270 $452.200 $473.000 $376.460 $515.000
RIPRAP (CONC)(CL B)
CY 10.000 $460.000 $515.930 $759.400 $481.000 $510.470 $670.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 304.000 $517.500 $412.130 $444.700 $481.000 $399.490 $530.000
RIPRAP (CONC) (CL B) (4")
CY 6.000 $437.000 $499.840 $768.900 $481.000 $707.770 $900.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 295.000 $172.500 $100.460 $237.000 $189.000 $162.220 $175.000
RIPRAP (MOW STRIP)(4 IN)
CY 294.000 $575.000 $414.700 $492.400 $481.000 $506.350 $625.000
RAIL (TY SSTR)
LF 5,570.000 $52.300 $85.030 $53.000 $55.000 $50.800 $70.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 1,472.000 $46.000 $92.810 $56.200 $55.000 $52.880 $70.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 564.000 $143.800 $224.960 $167.400 $210.000 $176.840 $225.000
CONC BOX CULV (4 FT X 2 FT)
LF 499.000 $241.500 $312.400 $269.700 $275.000 $309.860 $325.000
RC PIPE (CL III)(18 IN)
LF 16.000 $103.500 $106.310 $96.200 $120.000 $179.590 $175.000
RC PIPE (CL III)(24 IN)
LF 981.000 $97.800 $79.610 $84.700 $117.000 $93.020 $175.000
RC PIPE (CL III)(30 IN)
LF 120.000 $126.500 $91.180 $102.600 $125.000 $108.890 $175.000
RC PIPE (CL III)(36 IN)
LF 414.000 $156.400 $143.870 $134.700 $160.000 $138.990 $200.000
RC PIPE (CL III)(42 IN)
LF 53.000 $187.500 $199.570 $176.900 $214.000 $229.140 $250.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $6,325.000 $5,747.430 $4,807.000 $6,500.000 $8,083.110 $8,000.000
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $5,750.000 $8,350.870 $7,411.300 $9,500.000 $8,083.100 $15,500.000
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $8,395.000 $11,719.830 $10,602.500 $14,000.000 $8,083.110 $17,500.000
INLET (COMPL)(TY AZR2G)
EA 14.000 $13,225.000 $9,757.930 $10,899.200 $9,000.000 $7,290.520 $15,000.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $12,075.000 $17,622.170 $13,993.300 $25,000.000 $17,499.720 $21,000.000
SET (TY I) (30 IN) (4: 1) (C)
EA 2.000 $3,795.000 $11,709.210 $2,140.000 $6,000.000 $2,042.210 $5,250.000
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (C)
EA 3.000 $8,050.000 $5,044.700 $8,545.300 $10,000.000 $7,295.550 $7,500.000
SET (TY I) (S= 4 FT) (HW= 2FT) (6: 1) C
EA 2.000 $8,395.000 $6,763.340 $12,857.300 $12,000.000 $4,251.660 $8,800.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 2.000 $11,730.000 $7,460.750 $19,198.200 $15,000.000 $8,887.230 $17,750.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,552.500 $1,802.740 $1,534.100 $2,000.000 $1,537.970 $1,450.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,610.000 $1,862.650 $1,372.700 $2,500.000 $1,694.260 $1,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 23.000 $1,725.000 $1,971.350 $1,853.700 $2,500.000 $1,557.520 $1,850.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 5.000 $1,840.000 $2,140.510 $2,146.300 $3,000.000 $1,712.010 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,840.000 $2,140.650 $2,146.300 $3,000.000 $2,123.560 $1,850.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 16.000 $5,175.000 $3,882.230 $5,303.100 $6,250.000 $5,308.500 $5,350.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 2.000 $8,395.000 $4,449.900 $6,410.000 $7,500.000 $5,473.380 $8,450.000
REMOV STR (INLET)
EA 8.000 $690.000 $390.630 $565.900 $2,500.000 $710.480 $1,450.000
REMOV STR (HEADWALL)
EA 5.000 $1,840.000 $1,530.400 $1,593.000 $2,500.000 $989.480 $1,550.000
REMOV STR (PIPE)
LF 1,282.000 $21.900 $15.210 $18.700 $33.500 $16.660 $45.000
MOBILIZATION
LS 1.000 $4,887,000.000 $4,800,000.000 $4,900,000.000 $5,000,000.000 $5,272,235.000 $5,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $9,200.000 $4,500.000 $4,317.800 $5,000.000 $7,217.250 $30,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 250.000 $47.200 $42.000 $89.100 $40.250 $182.000 $40.220
ROCK FILTER DAMS (REMOVE)
LF 250.000 $11.500 $10.060 $10.500 $9.950 $11.890 $9.960
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 780.000 $28.800 $40.000 $31.400 $37.750 $40.210 $37.830
CONSTRUCTION EXITS (REMOVE)
SY 780.000 $9.200 $8.390 $5.200 $8.300 $7.760 $8.310
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,953.000 $2.300 $5.000 $2.100 $4.650 $4.020 $4.660
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,953.000 $1.200 $0.920 $0.500 $0.900 $0.990 $0.910
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,190.000 $4.000 $4.680 $5.200 $4.650 $6.880 $4.630
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,115.000 $4.600 $5.310 $7.300 $5.250 $9.170 $5.260
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,305.000 $1.200 $0.920 $3.100 $0.900 $0.990 $0.910
CONSTRUCTING DETOURS
SY 33,436.000 $125.000 $125.000 $89.100 $94.000 $90.690 $85.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 12,420.000 $9.200 $6.000 $9.700 $9.000 $6.910 $15.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 7,740.000 $9.200 $5.000 $8.800 $9.000 $8.210 $15.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 420.000 $11.500 $4.000 $8.800 $9.000 $8.210 $15.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 34,500.000 $5.800 $2.500 $8.100 $2.000 $5.020 $8.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 13,120.000 $6.900 $1.500 $8.100 $6.000 $1.640 $8.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 600.000 $10.400 $1.700 $8.100 $6.000 $4.750 $8.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 12,420.000 $9.200 $6.000 $9.500 $8.000 $8.070 $10.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 7,740.000 $9.200 $5.000 $8.600 $8.000 $7.620 $10.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 420.000 $13.200 $5.000 $8.800 $8.000 $17.750 $10.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 1,088.000 $95.500 $65.000 $74.200 $87.000 $64.170 $120.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,925.000 $28.800 $25.250 $30.000 $21.600 $26.220 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $2,300.000 $1,818.180 $2,578.100 $1,880.000 $1,887.490 $2,250.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $1,437.500 $909.090 $1,540.600 $1,340.000 $943.750 $1,650.000
REMOVE METAL BEAM GUARD FENCE
LF 1,250.000 $3.500 $0.510 $3.400 $1.850 $0.520 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $195.500 $151.520 $235.800 $269.000 $157.290 $500.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $287.500 $166.670 $340.600 $269.000 $173.020 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,565.000 $2,898.990 $3,647.000 $3,100.000 $3,009.500 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $345.000 $227.270 $235.800 $269.000 $235.940 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 18.000 $2,173.500 $1,551.960 $1,231.400 $2,500.000 $1,572.910 $3,900.000
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $977.500 $620.790 $1,231.400 $1,200.000 $629.160 $1,500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 4.000 $27,600.000 $25,555.650 $28,568.500 $10,380.000 $26,634.610 $25,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $10,350.000 $9,725.630 $10,385.700 $10,380.000 $9,012.770 $10,165.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 1.000 $195.500 $129.910 $314.400 $285.000 $335.000 $425.000
REMOVE RD IL ASM (TRANS-BASE)
EA 8.000 $690.000 $739.020 $766.700 $345.000 $343.000 $731.630
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 10.000 $1,725.000 $1,304.920 $1,353.900 $900.000 $900.000 $1,291.870
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 21.000 $3,795.000 $4,423.590 $4,589.600 $3,990.000 $3,987.000 $4,379.350
CONDT (PVC) (SCH 80) (2")
LF 5,640.000 $11.500 $10.590 $11.000 $16.300 $16.250 $10.480
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,420.000 $23.000 $13.740 $14.300 $24.000 $24.000 $13.600
CONDT (RM) (2")
LF 695.000 $38.000 $44.940 $46.600 $63.000 $63.000 $44.490
ELEC CONDR (NO.12) BARE
LF 1,305.000 $1.200 $1.070 $1.100 $1.200 $1.200 $1.060
ELEC CONDR (NO.12) INSULATED
LF 3,120.000 $1.400 $1.070 $1.100 $1.250 $1.250 $1.060
ELEC CONDR (NO.8) BARE
LF 7,440.000 $1.500 $1.110 $1.200 $1.800 $1.800 $1.100
ELEC CONDR (NO.8) INSULATED
LF 14,970.000 $1.700 $1.140 $1.200 $1.900 $1.900 $1.130
GROUND BOX TY D (162922)W/APRON
EA 22.000 $1,265.000 $1,112.090 $1,153.800 $1,150.000 $1,150.000 $1,100.970
ELC SRV TY A 240/480 060(SS)SS(E)GC(O)
EA 2.000 $8,050.000 $9,134.040 $9,476.700 $11,200.000 $11,200.000 $9,042.700
ALUMINUM SIGNS (TY G)
SF 158.000 $34.500 $30.610 $27.200 $37.750 $29.250 $31.500
ALUMINUM SIGNS (TY O)
SF 788.000 $32.200 $27.840 $33.500 $28.500 $26.600 $26.240
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 74.000 $575.000 $523.270 $733.600 $484.000 $500.000 $475.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 12.000 $690.000 $622.690 $838.400 $554.000 $595.000 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 41.000 $690.000 $664.550 $917.000 $621.000 $635.000 $605.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $805.000 $837.230 $917.000 $792.000 $800.000 $735.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 12.000 $862.500 $941.890 $1,310.000 $877.000 $900.000 $825.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 9.000 $948.800 $915.720 $1,310.000 $846.000 $875.000 $820.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $1,150.000 $1,203.520 $1,572.000 $1,010.000 $1,150.000 $995.000
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
EA 4.000 $1,150.000 $1,046.540 $1,572.000 $981.000 $1,000.000 $1,000.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $1,955.000 $2,145.410 $1,729.200 $1,510.000 $2,050.000 $1,800.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $2,300.000 $1,920.410 $2,761.500 $2,070.000 $1,835.000 $3,500.000
REMOVE SM RD SN SUP&AM
EA 156.000 $103.500 $52.330 $131.000 $44.000 $50.000 $100.000
INSTALL LRSS (STRUCT STEEL)
LB 1,003.000 $5.800 $5.580 $11.400 $7.100 $4.980 $5.250
REMOVE LRSA
EA 5.000 $1,725.000 $732.580 $392.000 $1,340.000 $700.000 $2,500.000
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
EA 6.000 $17,250.000 $19,884.310 $23,144.300 $17,150.000 $17,150.000 $22,084.240
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 88.000 $23.000 $20.930 $36.700 $24.000 $25.000 $35.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 39.000 $23.000 $20.930 $36.700 $24.000 $25.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 67.000 $28.800 $36.630 $36.700 $27.000 $28.000 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 40.000 $17.300 $36.630 $41.900 $27.000 $41.000 $35.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 473.000 $3.500 $6.060 $5.800 $5.500 $5.500 $5.500
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 10,220.000 $1.200 $1.160 $1.200 $1.100 $1.100 $1.100
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 93,635.000 $0.900 $1.010 $1.000 $1.000 $1.000 $1.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 3,795.000 $1.800 $2.020 $2.100 $2.000 $2.000 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 343.000 $6.900 $8.080 $6.300 $6.000 $6.000 $6.000
WK ZN PAV MRK REMOV (W)(ENTR GORE)
EA 1.000 $575.000 $505.050 $817.400 $780.000 $780.000 $780.000
WK ZN PAV MRK REMOV (W)(EXIT GORE)
EA 1.000 $920.000 $505.050 $817.400 $780.000 $780.000 $780.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 95,188.000 $0.900 $1.010 $1.000 $1.000 $1.000 $1.000
PAVEMENT SEALER 6"
LF 180,095.000 $0.200 $0.100 $0.200 $0.150 $0.150 $0.150
PAVEMENT SEALER 8"
LF 11,226.000 $0.600 $0.150 $0.300 $0.300 $0.300 $0.300
PAVEMENT SEALER 12"
LF 4,235.000 $0.900 $0.200 $0.500 $0.500 $0.500 $0.500
PAVEMENT SEALER 24"
LF 480.000 $1.200 $0.400 $1.000 $1.000 $1.000 $1.000
PAVEMENT SEALER (ARROW)
EA 11.000 $28.800 $10.100 $5.200 $5.000 $5.000 $5.000
PAVEMENT SEALER (WORD)
EA 13.000 $34.500 $15.150 $8.400 $8.000 $8.000 $8.000
PAVEMENT SEALER (UTURN ARROW)
EA 4.000 $28.800 $25.250 $15.700 $15.000 $15.000 $15.000
PAVEMENT SEALER (LNDP ARROW)
EA 5.000 $57.500 $25.250 $10.500 $10.000 $10.000 $10.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 11.000 $230.000 $227.270 $193.900 $185.000 $185.000 $185.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 4.000 $402.500 $378.790 $366.800 $350.000 $350.000 $350.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 5.000 $431.300 $277.780 $366.800 $350.000 $350.000 $350.000
PREFAB PAV MRK TY C (W) (WORD)
EA 13.000 $276.000 $202.020 $235.800 $225.000 $225.000 $225.000
REFL PAV MRKR TY I-C
EA 56.000 $4.600 $6.060 $5.800 $5.500 $5.500 $5.500
REFL PAV MRKR TY II-A-A
EA 768.000 $4.600 $6.060 $5.800 $5.500 $5.500 $5.500
REFL PAV MRKR TY II-C-R
EA 1,389.000 $5.200 $6.060 $5.200 $5.000 $5.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 81,767.000 $0.300 $0.150 $0.300 $0.250 $0.250 $0.250
ELIM EXT PAV MRK & MRKS (6")
LF 109,185.000 $0.600 $0.200 $0.400 $0.350 $0.350 $0.350
ELIM EXT PAV MRK & MRKS (12")
LF 96.000 $1.200 $0.350 $1.000 $1.000 $1.000 $1.000
PAV SURF PREP FOR MRK (6")
LF 180,095.000 $0.100 $0.040 $0.030 $0.050 $0.030 $0.030
PAV SURF PREP FOR MRK (8")
LF 11,226.000 $0.200 $0.060 $0.040 $0.050 $0.040 $0.040
PAV SURF PREP FOR MRK (12")
LF 4,235.000 $0.600 $0.080 $0.100 $0.050 $0.060 $0.060
PAV SURF PREP FOR MRK (24")
LF 480.000 $1.200 $0.150 $0.100 $0.100 $0.120 $0.120
PAV SURF PREP FOR MRK (ARROW)
EA 16.000 $11.500 $15.150 $5.200 $5.000 $5.000 $5.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 4.000 $17.300 $30.300 $10.500 $10.000 $10.000 $10.000
PAV SURF PREP FOR MRK (WORD)
EA 13.000 $17.300 $20.200 $8.400 $8.000 $8.000 $8.000
FULL - WIDTH MOWING
CYC 12.000 $3,000.000 $5,000.000 $4,192.000 $5,740.000 $6,487.540 $3,500.000
LITTER REMOVAL
CYC 12.000 $1,600.000 $1,200.000 $2,620.000 $7,520.000 $2,253.000 $3,750.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 12.000 $600.000 $1,800.000 $3,668.000 $1,270.000 $2,200.000 $2,500.000
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 12.000 $1,000.000 $2,200.000 $3,144.000 $1,920.000 $2,800.000 $2,500.000
WIDE FLANGE PAVEMENT TERMINALS
LF 368.000 $345.000 $583.720 $608.500 $634.000 $585.770 $800.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $86.300 $60.000 $73.400 $70.250 $61.560 $150.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 73,550.000 $0.800 $0.760 $0.700 $0.700 $0.700 $0.700
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 15,630.000 $0.900 $0.810 $0.800 $0.750 $0.750 $0.750
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 8,920.000 $1.500 $1.010 $1.600 $1.500 $1.500 $1.500
MULTIPOLYMER PAV MRK (W)(8")(DOT)
LF 270.000 $2.300 $1.160 $2.500 $2.400 $2.400 $2.400
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 2,077.000 $4.000 $2.020 $3.100 $3.000 $3.000 $3.000
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 825.000 $2.900 $2.270 $3.100 $3.000 $3.000 $3.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 480.000 $8.600 $6.060 $6.300 $6.000 $6.000 $6.000
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 75,285.000 $0.800 $0.760 $0.700 $0.700 $0.700 $0.700
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
LF 2,036.000 $1.500 $1.010 $1.600 $1.500 $1.500 $1.500
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
LF 1,333.000 $4.000 $2.020 $3.100 $3.000 $3.000 $3.000
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 15,630.000 $1.000 $0.760 $0.900 $0.850 $0.850 $0.850
TMA (STATIONARY)
DAY 60.000 $195.500 $230.000 $152.000 $250.000 $760.530 $275.000
TMA (MOBILE OPERATION)
HR 112.000 $80.500 $100.000 $152.000 $150.000 $1,077.470 $50.000
Totals: $53,828,977.000 $49,368,479.408 $49,438,565.450 $51,562,118.800 $52,590,585.739 $52,754,145.125