PREPARING ROW
|
STA
|
79.890
|
$10,000.000
|
$14,505.970
|
$14,750.000
|
$43,504.620
|
$61,441.980
|
|
|
REMOVING CONC (PAV)
|
SY
|
38,662.000
|
$7.000
|
$3.840
|
$4.000
|
$5.770
|
$8.640
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
2,612.000
|
$10.000
|
$5.030
|
$3.500
|
$3.380
|
$11.790
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
115.000
|
$5.000
|
$9.780
|
$3.500
|
$6.900
|
$2.440
|
|
|
REMOVING CONC (CTB)
|
LF
|
117.000
|
$11.000
|
$18.590
|
$15.990
|
$19.060
|
$11.790
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
38,662.000
|
$4.000
|
$4.400
|
$0.500
|
$5.100
|
$5.120
|
|
|
REMOVE STAB BASE AND ASPH PAV (6"-20")
|
SY
|
51,582.000
|
$6.000
|
$5.390
|
$4.500
|
$4.980
|
$8.140
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
30,800.000
|
$8.000
|
$4.010
|
$5.000
|
$6.350
|
$5.890
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
16,084.000
|
$8.000
|
$7.210
|
$6.300
|
$8.180
|
$6.740
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
324,036.000
|
$8.000
|
$16.200
|
$17.000
|
$11.160
|
$22.250
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
21,052.000
|
$50.000
|
$44.100
|
$42.000
|
$49.690
|
$39.550
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
13,003.000
|
$50.000
|
$44.110
|
$44.000
|
$48.900
|
$43.470
|
|
|
BLOCK SODDING
|
SY
|
190,397.000
|
$3.000
|
$2.740
|
$2.770
|
$2.740
|
$2.900
|
|
|
STRAW OR HAY MULCH
|
SY
|
190,397.000
|
$0.150
|
$0.200
|
$0.200
|
$0.200
|
$0.360
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
190,397.000
|
$0.100
|
$0.250
|
$0.250
|
$0.250
|
$0.090
|
|
|
FERTILIZER
|
AC
|
39.460
|
$600.000
|
$500.000
|
$505.050
|
$500.000
|
$795.570
|
|
|
VEGETATIVE WATERING
|
MG
|
4,745.000
|
$12.000
|
$23.000
|
$27.230
|
$31.000
|
$5.270
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
144,515.000
|
$2.500
|
$2.680
|
$3.750
|
$2.860
|
$3.310
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
1,957.000
|
$190.000
|
$297.610
|
$280.000
|
$294.960
|
$166.620
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
146,001.000
|
$12.000
|
$14.460
|
$12.000
|
$12.600
|
$14.300
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
7,948.000
|
$72.000
|
$123.860
|
$118.090
|
$120.750
|
$140.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
34,750.000
|
$70.000
|
$80.990
|
$80.000
|
$75.430
|
$56.930
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
100,683.000
|
$75.000
|
$87.860
|
$95.000
|
$85.210
|
$66.480
|
|
|
STRUCT EXCAV
|
CY
|
13,003.000
|
$10.000
|
$4.500
|
$4.630
|
$13.080
|
$12.730
|
|
|
CEM STABIL BKFL
|
CY
|
5,210.000
|
$70.000
|
$46.700
|
$62.900
|
$45.320
|
$38.970
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
362.000
|
$80.000
|
$46.700
|
$111.100
|
$45.320
|
$38.970
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
7,802.000
|
$3.000
|
$1.060
|
$1.150
|
$0.500
|
$5.420
|
|
|
TEMPORARY SPL SHORING
|
SF
|
58,753.000
|
$10.000
|
$0.520
|
$5.000
|
$4.170
|
$4.550
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
120.000
|
$200.000
|
$153.480
|
$115.000
|
$153.480
|
$221.740
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
6,610.000
|
$200.000
|
$178.020
|
$140.000
|
$188.990
|
$177.390
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
45.000
|
$340.000
|
$345.320
|
$400.000
|
$345.320
|
$348.060
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
608.000
|
$1,000.000
|
$1,032.490
|
$850.000
|
$1,033.500
|
$1,023.540
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
21.000
|
$100.000
|
$69.060
|
$97.980
|
$110.130
|
$125.990
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
56.000
|
$550.000
|
$667.410
|
$394.130
|
$667.410
|
$672.690
|
|
|
CL C CONC (ABUT)
|
CY
|
210.900
|
$825.000
|
$888.060
|
$1,100.000
|
$1,159.470
|
$1,052.870
|
|
|
CL C CONC (COLUMN)
|
CY
|
128.900
|
$900.000
|
$1,800.360
|
$1,500.000
|
$1,595.270
|
$1,732.520
|
|
|
CL F CONC (CAP)
|
CY
|
312.800
|
$1,700.000
|
$846.710
|
$1,500.000
|
$1,173.080
|
$1,243.300
|
|
|
REINF CONC SLAB
|
SF
|
41,446.000
|
$22.000
|
$18.140
|
$22.000
|
$25.560
|
$19.050
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
3,644.000
|
$50.000
|
$56.120
|
$88.920
|
$67.660
|
$30.550
|
|
|
RETAINING WALL (MSE) (WAVE SCHEME)
|
SF
|
75,578.000
|
$40.000
|
$29.570
|
$31.440
|
$49.750
|
$23.890
|
|
|
PRESTR CONC U - BEAM (U54)
|
LF
|
4,006.960
|
$350.000
|
$337.960
|
$330.050
|
$356.490
|
$341.740
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,123.000
|
$403.000
|
$350.880
|
$375.000
|
$597.560
|
$310.120
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
758.000
|
$425.000
|
$350.880
|
$380.000
|
$619.050
|
$501.140
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
30.000
|
$133.000
|
$211.600
|
$187.450
|
$144.610
|
$128.490
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,027.000
|
$403.000
|
$514.230
|
$400.000
|
$627.560
|
$916.570
|
|
|
RAIL (TY SSTR)
|
LF
|
9,337.100
|
$50.000
|
$48.630
|
$36.060
|
$44.480
|
$52.640
|
|
|
RAIL (TY C223)
|
LF
|
552.000
|
$80.000
|
$105.370
|
$257.550
|
$153.540
|
$118.390
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
254.000
|
$110.000
|
$195.860
|
$220.930
|
$207.380
|
$346.880
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
1,051.000
|
$350.000
|
$265.460
|
$310.350
|
$254.160
|
$269.610
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
526.000
|
$260.000
|
$363.210
|
$398.280
|
$334.580
|
$389.640
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
1,739.000
|
$450.000
|
$375.510
|
$426.320
|
$352.260
|
$406.640
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
4,518.000
|
$70.000
|
$78.960
|
$73.790
|
$75.790
|
$68.940
|
|
|
RC PIPE (CL III)(27 IN)
|
LF
|
69.000
|
$80.000
|
$121.230
|
$91.200
|
$96.610
|
$133.300
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
786.000
|
$90.000
|
$99.140
|
$96.220
|
$98.200
|
$188.440
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
89.000
|
$125.000
|
$140.640
|
$128.830
|
$156.520
|
$260.060
|
|
|
RC PIPE (ARCH)(CL IV)(DES 3)
|
LF
|
334.000
|
$180.000
|
$189.720
|
$186.310
|
$186.780
|
$317.500
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
11.000
|
$4,500.000
|
$6,763.310
|
$8,149.590
|
$7,774.810
|
$5,848.960
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$9,600.000
|
$9,902.220
|
$10,695.770
|
$9,105.940
|
$9,245.270
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
4.000
|
$14,000.000
|
$12,591.330
|
$13,247.580
|
$11,608.860
|
$11,700.280
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
1.000
|
$5,800.000
|
$8,772.140
|
$9,483.310
|
$9,650.660
|
$8,088.030
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
10.000
|
$6,900.000
|
$8,948.440
|
$10,220.140
|
$9,404.830
|
$7,881.070
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
6.000
|
$9,000.000
|
$8,889.180
|
$8,762.140
|
$11,090.580
|
$8,600.310
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
3.000
|
$5,750.000
|
$5,514.480
|
$5,721.370
|
$8,437.780
|
$5,093.150
|
|
|
INLET (COMPL)(TY AZR)
|
EA
|
19.000
|
$7,600.000
|
$7,605.920
|
$6,389.600
|
$9,298.830
|
$5,415.190
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$18,300.000
|
$18,060.120
|
$20,042.050
|
$29,842.740
|
$35,802.010
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
8.000
|
$6,800.000
|
$6,989.070
|
$5,311.500
|
$9,314.900
|
$5,478.280
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (P)
|
EA
|
1.000
|
$10,000.000
|
$14,328.390
|
$11,018.990
|
$14,686.850
|
$12,126.390
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
1.000
|
$10,000.000
|
$11,299.140
|
$9,137.710
|
$18,382.990
|
$9,382.430
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$10,500.000
|
$9,577.220
|
$9,592.700
|
$20,247.620
|
$7,822.690
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
2.000
|
$10,500.000
|
$9,029.830
|
$16,536.480
|
$20,643.090
|
$9,180.830
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$1,632.210
|
$2,274.900
|
$2,045.080
|
$2,172.520
|
|
|
SET (TY II) (27 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,400.000
|
$1,856.910
|
$2,483.060
|
$2,255.080
|
$2,504.690
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,800.000
|
$1,856.910
|
$2,483.060
|
$2,255.080
|
$4,559.380
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$4,500.000
|
$4,577.930
|
$5,043.060
|
$6,607.300
|
$6,077.730
|
|
|
SET (TY II) (DES 3) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$5,500.000
|
$2,727.000
|
$3,304.900
|
$2,045.080
|
$3,765.100
|
|
|
REMOV STR (INLET)
|
EA
|
6.000
|
$700.000
|
$630.830
|
$387.100
|
$1,136.310
|
$751.890
|
|
|
REMOV STR (SET)
|
EA
|
14.000
|
$500.000
|
$369.310
|
$197.590
|
$979.340
|
$451.140
|
|
|
REMOV STR (PIPE)
|
LF
|
1,384.000
|
$15.000
|
$21.920
|
$7.280
|
$32.330
|
$15.030
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,500,000.000
|
$4,928,000.000
|
$5,100,000.000
|
$5,400,000.000
|
$4,900,027.340
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
28.000
|
$15,000.000
|
$5,226.140
|
$4,500.000
|
$984.320
|
$2,941.980
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,302.000
|
$28.000
|
$41.060
|
$60.000
|
$41.060
|
$133.330
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,302.000
|
$8.000
|
$13.850
|
$4.000
|
$13.850
|
$39.770
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
446.000
|
$20.000
|
$38.250
|
$17.000
|
$38.250
|
$38.550
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
446.000
|
$9.000
|
$9.400
|
$2.500
|
$9.400
|
$9.470
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,300.000
|
$2.200
|
$3.570
|
$4.000
|
$3.570
|
$3.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,300.000
|
$0.650
|
$0.950
|
$0.300
|
$0.950
|
$0.950
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,282.000
|
$4.000
|
$5.380
|
$15.000
|
$5.380
|
$5.420
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,282.000
|
$0.900
|
$0.830
|
$2.550
|
$0.830
|
$0.840
|
|
|
CONSTRUCTING DETOURS
|
SY
|
24,421.000
|
$80.000
|
$91.380
|
$100.000
|
$95.200
|
$72.470
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
15,330.000
|
$50.000
|
$109.070
|
$60.000
|
$29.390
|
$75.780
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
400.000
|
$45.000
|
$42.450
|
$40.000
|
$87.630
|
$9.590
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$55.000
|
$44.580
|
$40.000
|
$90.450
|
$5.850
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
33,960.000
|
$5.000
|
$3.970
|
$4.000
|
$4.800
|
$5.950
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
100.000
|
$5.000
|
$9.830
|
$4.000
|
$13.900
|
$0.300
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
15,330.000
|
$8.000
|
$7.280
|
$3.500
|
$7.560
|
$8.910
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
400.000
|
$8.000
|
$19.370
|
$3.500
|
$16.050
|
$8.190
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$19.370
|
$3.500
|
$18.870
|
$11.700
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
14,260.000
|
$75.000
|
$60.810
|
$40.000
|
$67.170
|
$55.340
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
18,228.000
|
$6.000
|
$3.540
|
$3.060
|
$4.360
|
$5.690
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,663.000
|
$25.000
|
$22.530
|
$7.350
|
$21.310
|
$21.520
|
|
|
CONC CURB (SLOTTED)
|
LF
|
1,748.000
|
$20.000
|
$3.460
|
$3.810
|
$9.000
|
$8.720
|
|
|
DRIVEWAYS (CONC)
|
SY
|
156.000
|
$70.000
|
$81.530
|
$309.750
|
$80.330
|
$80.570
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
625.000
|
$20.000
|
$27.700
|
$29.660
|
$26.850
|
$23.950
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,250.000
|
$1,347.290
|
$1,442.630
|
$1,306.000
|
$1,584.810
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
924.000
|
$2.700
|
$0.520
|
$0.550
|
$0.500
|
$1.420
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
6.000
|
$350.000
|
$142.360
|
$1,442.630
|
$138.000
|
$248.670
|
|
|
REMOVE CABLE BARRIER
|
LF
|
7,160.000
|
$4.000
|
$2.060
|
$2.210
|
$2.000
|
$1.420
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$270.000
|
$226.960
|
$243.020
|
$220.000
|
$248.670
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY III)
|
EA
|
5.000
|
$2,750.000
|
$3,481.690
|
$3,728.070
|
$3,375.000
|
$2,358.980
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
20.000
|
$2,500.000
|
$1,031.610
|
$1,010.100
|
$1,000.000
|
$2,233.180
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
9.000
|
$800.000
|
$722.130
|
$707.070
|
$700.000
|
$595.230
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
13.000
|
$7,900.000
|
$13,462.540
|
$13,181.820
|
$13,050.000
|
$8,609.070
|
|
|
RELOCATE RD IL ASM (U/P)
|
EA
|
2.000
|
$1,600.000
|
$755.000
|
$645.720
|
$755.000
|
$706.410
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
11.000
|
$350.000
|
$100.000
|
$238.070
|
$100.000
|
$93.560
|
|
|
IN RD IL (U/P) (TY 1) (250W EQ) LED
|
EA
|
8.000
|
$1,200.000
|
$1,212.000
|
$1,248.500
|
$1,212.000
|
$1,134.000
|
|
|
IN RD IL (TY SA) 50S-8 (400W EQ) LED
|
EA
|
23.000
|
$1,500.000
|
$3,668.000
|
$5,482.370
|
$3,668.000
|
$3,431.950
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
15,260.000
|
$15.000
|
$13.870
|
$15.720
|
$13.870
|
$12.980
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
7,268.000
|
$8.810
|
$9.260
|
$9.190
|
$9.260
|
$8.660
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
683.000
|
$19.000
|
$13.390
|
$13.800
|
$13.390
|
$12.530
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
880.000
|
$11.640
|
$16.950
|
$18.060
|
$16.950
|
$15.860
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
3,760.000
|
$20.230
|
$29.950
|
$33.290
|
$29.950
|
$28.020
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
13.120
|
$13.130
|
$36.720
|
$36.440
|
$36.720
|
$34.360
|
|
|
CONDT (RM) (1")
|
LF
|
56.000
|
$20.000
|
$74.240
|
$44.260
|
$74.240
|
$69.470
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
76.000
|
$0.900
|
$1.220
|
$1.360
|
$1.220
|
$1.150
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
152.000
|
$1.000
|
$1.210
|
$1.200
|
$1.210
|
$1.140
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
3,946.000
|
$1.020
|
$1.540
|
$0.960
|
$1.540
|
$1.450
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
7,983.000
|
$1.080
|
$1.610
|
$1.090
|
$1.610
|
$1.510
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
150.000
|
$1.340
|
$1.880
|
$1.310
|
$1.880
|
$1.760
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
300.000
|
$1.300
|
$2.010
|
$1.500
|
$2.010
|
$1.880
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
380.000
|
$1.870
|
$4.120
|
$2.470
|
$4.120
|
$3.850
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
1,140.000
|
$2.010
|
$3.900
|
$3.130
|
$3.900
|
$3.650
|
|
|
GROUND BOX TY A (122311)
|
EA
|
16.000
|
$768.120
|
$690.000
|
$875.710
|
$690.000
|
$645.600
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
|
EA
|
1.000
|
$6,500.000
|
$7,285.000
|
$8,235.580
|
$7,285.000
|
$6,816.180
|
|
|
ELC SRV TY A 240/480 100(SS)SS(E)GC(U)
|
EA
|
1.000
|
$6,500.000
|
$7,560.000
|
$8,566.170
|
$7,560.000
|
$7,073.480
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
4.000
|
$4,310.490
|
$6,075.000
|
$6,705.660
|
$6,075.000
|
$5,684.050
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
33.750
|
$25.000
|
$18.840
|
$18.110
|
$18.840
|
$37.420
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
946.000
|
$28.000
|
$23.900
|
$25.030
|
$23.900
|
$37.420
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$500.000
|
$581.260
|
$537.940
|
$658.380
|
$1,010.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
4.000
|
$700.000
|
$667.580
|
$617.830
|
$686.920
|
$1,122.780
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
$600.000
|
$811.460
|
$750.980
|
$936.530
|
$1,075.990
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$700.000
|
$909.290
|
$841.520
|
$953.580
|
$1,169.560
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$650.000
|
$1,007.130
|
$932.070
|
$1,177.690
|
$1,216.340
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,000.000
|
$2,071.800
|
$1,917.400
|
$1,721.450
|
$1,403.470
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
15.000
|
$80.000
|
$52.950
|
$49.000
|
$125.000
|
$140.350
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
5,098.000
|
$6.000
|
$5.180
|
$5.220
|
$5.180
|
$9.350
|
|
|
REMOVE LRSA
|
EA
|
5.000
|
$1,100.000
|
$150.000
|
$745.650
|
$150.000
|
$1,403.470
|
|
|
SIGN WALKWAY (36 IN) WITH HNDRL
|
LF
|
62.000
|
$305.660
|
$340.000
|
$4.630
|
$340.000
|
$42.100
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
56.000
|
$20.000
|
$28.780
|
$26.630
|
$25.000
|
$11.490
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
89,935.000
|
$0.700
|
$1.000
|
$0.910
|
$1.000
|
$0.940
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
40.000
|
$6.000
|
$3.000
|
$3.280
|
$3.000
|
$2.810
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
40,639.000
|
$0.900
|
$1.000
|
$0.730
|
$1.000
|
$0.940
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
63.000
|
$1.500
|
$1.250
|
$1.520
|
$1.250
|
$1.170
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
220.000
|
$1.400
|
$2.500
|
$1.520
|
$2.500
|
$2.340
|
|
|
WK ZN PAV MRK REMOV (W)12"(DOT)
|
LF
|
2,002.000
|
$6.000
|
$3.000
|
$3.280
|
$3.000
|
$2.810
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
28.000
|
$35.000
|
$30.000
|
$30.300
|
$30.000
|
$28.070
|
|
|
PAVEMENT SEALER 6"
|
LF
|
52,196.000
|
$0.200
|
$0.150
|
$0.150
|
$0.150
|
$0.140
|
|
|
PAVEMENT SEALER 8"
|
LF
|
6,920.000
|
$0.500
|
$0.250
|
$0.200
|
$0.250
|
$0.240
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,255.000
|
$1.000
|
$0.350
|
$0.250
|
$0.350
|
$0.330
|
|
|
PAVEMENT SEALER 24"
|
LF
|
426.000
|
$2.300
|
$0.600
|
$0.400
|
$0.600
|
$0.280
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
18.000
|
$35.000
|
$8.000
|
$10.100
|
$8.000
|
$7.480
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
13.000
|
$40.000
|
$10.000
|
$15.150
|
$10.000
|
$9.350
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
3.000
|
$50.000
|
$15.000
|
$20.200
|
$15.000
|
$14.030
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
749.000
|
$3.500
|
$5.000
|
$6.060
|
$5.000
|
$4.680
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
52,196.000
|
$0.040
|
$0.030
|
$0.040
|
$0.030
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
6,920.000
|
$0.100
|
$0.040
|
$0.060
|
$0.040
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,255.000
|
$0.400
|
$0.060
|
$0.080
|
$0.060
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
426.000
|
$1.000
|
$0.120
|
$0.150
|
$0.120
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
18.000
|
$15.000
|
$5.000
|
$15.150
|
$5.000
|
$4.680
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
3.000
|
$30.000
|
$10.000
|
$25.250
|
$10.000
|
$9.350
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
13.000
|
$20.000
|
$7.000
|
$20.200
|
$7.000
|
$6.550
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
1.000
|
$233.000
|
$220.000
|
$389.100
|
$221.890
|
$546.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
7.000
|
$2,500.000
|
$1,401.440
|
$2,743.850
|
$5,000.000
|
$2,679.070
|
|
|
LITTER REMOVAL
|
CYC
|
7.000
|
$2,500.000
|
$649.330
|
$1,000.000
|
$5,000.000
|
$2,851.940
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
7.000
|
$2,500.000
|
$1,515.210
|
$1,200.000
|
$5,000.000
|
$315.780
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
28.000
|
$2,500.000
|
$500.000
|
$1,800.000
|
$5,000.000
|
$7,837.340
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
0.090
|
$20,000.000
|
$16,835.670
|
$40,000.000
|
$50,000.000
|
$11,363.980
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
1,358.000
|
$10.000
|
$2.250
|
$0.700
|
$15.000
|
$8.500
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
232.000
|
$250.000
|
$490.110
|
$592.270
|
$635.320
|
$563.960
|
|
|
SOUND WALL (WAVE SCHEME)(16 FT)
|
LF
|
2,180.000
|
$50.000
|
$553.350
|
$522.020
|
$532.170
|
$664.820
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
8.000
|
$7,000.000
|
$6,557.030
|
$7,500.000
|
$6,400.000
|
$7,709.280
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$10,000.000
|
$10,628.970
|
$20,000.000
|
$20,907.200
|
$25,283.320
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
|
LF
|
2,600.000
|
$1.070
|
$2.020
|
$2.910
|
$2.020
|
$1.890
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
14,930.000
|
$1.930
|
$2.580
|
$1.710
|
$2.580
|
$2.420
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
17,740.000
|
$3.000
|
$4.010
|
$3.820
|
$4.010
|
$3.750
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
5.000
|
$1,500.000
|
$2,150.000
|
$934.570
|
$2,150.000
|
$2,011.640
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
2.000
|
$3,600.000
|
$4,222.000
|
$4,497.810
|
$4,222.000
|
$3,950.300
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
288.000
|
$40.000
|
$80.450
|
$24.770
|
$80.450
|
$75.270
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
1.000
|
$7,500.000
|
$7,500.000
|
$8,451.660
|
$7,500.000
|
$7,017.340
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$1,000.000
|
$250.000
|
$533.950
|
$250.000
|
$233.910
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
15,260.000
|
$30.000
|
$18.980
|
$23.010
|
$18.980
|
$17.760
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
3,460.000
|
$28.500
|
$37.720
|
$38.390
|
$37.720
|
$35.300
|
|
|
CONDUIT (PREPARE)
|
LF
|
20,940.000
|
$1.400
|
$1.550
|
$1.190
|
$1.550
|
$1.450
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
2.000
|
$10,000.000
|
$11,055.000
|
$13,342.810
|
$11,055.000
|
$10,343.570
|
|
|
CTMS RELOCATION (CCTV)
|
EA
|
2.000
|
$5,000.000
|
$3,755.000
|
$6,821.010
|
$3,755.000
|
$3,513.350
|
|
|
FIBER OPTIC VIDEO DATA TRANSMITTER
|
EA
|
1.000
|
$1,300.000
|
$1,250.000
|
$1,899.760
|
$1,250.000
|
$1,169.560
|
|
|
FIBER OPTIC VIDEO DATA RECEIVER
|
EA
|
1.000
|
$1,300.000
|
$1,250.000
|
$1,899.760
|
$1,250.000
|
$1,169.560
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
23,394.000
|
$1.000
|
$0.700
|
$1.010
|
$0.700
|
$0.650
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
5,236.000
|
$1.000
|
$0.750
|
$1.160
|
$0.750
|
$0.700
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
37.000
|
$1.300
|
$1.500
|
$1.260
|
$1.500
|
$1.400
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
6,920.000
|
$1.500
|
$1.500
|
$1.520
|
$1.500
|
$1.400
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
1,149.000
|
$4.000
|
$3.000
|
$2.020
|
$3.000
|
$2.810
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
140.000
|
$4.000
|
$3.000
|
$2.170
|
$3.000
|
$2.810
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
426.000
|
$8.000
|
$6.000
|
$6.060
|
$6.000
|
$5.620
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
23,529.000
|
$1.000
|
$0.700
|
$1.010
|
$0.700
|
$0.650
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
18.000
|
$200.000
|
$150.000
|
$176.770
|
$150.000
|
$140.350
|
|
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
|
EA
|
3.000
|
$300.000
|
$200.000
|
$353.540
|
$200.000
|
$187.130
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
13.000
|
$200.000
|
$175.000
|
$202.020
|
$175.000
|
$163.740
|
|
|
ITS POLE (55 FT)(110 MPH)
|
EA
|
1.000
|
$13,500.000
|
$20,432.000
|
$26,301.100
|
$20,432.000
|
$19,117.120
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
1.000
|
$4,000.000
|
$4,945.000
|
$11,878.090
|
$4,945.000
|
$4,626.770
|
|
|
REMOVE EXISTING CABLES (POWER)
|
LF
|
1,846.000
|
$2.000
|
$1.000
|
$0.680
|
$1.000
|
$0.940
|
|
|
TMA (STATIONARY)
|
DAY
|
730.000
|
$175.000
|
$150.000
|
$50.000
|
$164.560
|
$258.050
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
730.000
|
$175.000
|
$192.490
|
$250.000
|
$253.910
|
$0.910
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
16.000
|
$3,000.000
|
$3,387.000
|
$7,157.870
|
$3,387.000
|
$3,413.810
|
|
Totals: |
$45,430,167.146
|
$50,829,745.561
|
$51,392,261.912
|
$53,991,083.747
|