REMOVING CONC (PAV)
|
SY
|
23,841.000
|
$5.400
|
$12.960
|
$12.700
|
$24.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
197.000
|
$15.000
|
$28.010
|
$13.000
|
$22.990
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
62.000
|
$17.000
|
$11.150
|
$10.700
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
461.500
|
$13.000
|
$20.030
|
$15.100
|
$15.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
42.000
|
$4.450
|
$6.310
|
$5.800
|
$5.950
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
26.000
|
$40.000
|
$15.210
|
$13.000
|
$20.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
20.000
|
$11.750
|
$21.490
|
$15.300
|
$31.250
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
390.000
|
$4.110
|
$23.990
|
$23.700
|
$38.290
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
24,181.000
|
$3.000
|
$4.130
|
$17.800
|
$18.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,094.000
|
$15.000
|
$22.480
|
$29.300
|
$16.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,545.000
|
$20.000
|
$28.790
|
$12.600
|
$23.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
36,185.000
|
$1.060
|
$1.600
|
$1.200
|
$0.860
|
|
|
BLOCK SODDING
|
SY
|
10,609.000
|
$3.000
|
$3.300
|
$3.000
|
$3.650
|
|
|
STRAW OR HAY MULCH
|
SY
|
30,694.000
|
$0.200
|
$0.130
|
$0.120
|
$0.540
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
5,118.000
|
$0.130
|
$0.280
|
$0.260
|
$0.290
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
25,576.000
|
$0.150
|
$0.330
|
$0.300
|
$0.210
|
|
|
FERTILIZER
|
AC
|
8.530
|
$655.000
|
$630.630
|
$580.000
|
$824.750
|
|
|
VEGETATIVE WATERING
|
MG
|
1,027.000
|
$13.000
|
$29.010
|
$18.000
|
$41.660
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
20,225.000
|
$1.820
|
$6.520
|
$6.000
|
$5.800
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
277.000
|
$179.000
|
$239.640
|
$240.000
|
$214.200
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
20,225.000
|
$14.860
|
$27.750
|
$25.800
|
$21.730
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
52.000
|
$78.000
|
$293.010
|
$290.000
|
$230.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
1,117.000
|
$84.000
|
$175.490
|
$160.000
|
$122.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (4 TO 6")
|
SY
|
21,016.000
|
$3.000
|
$3.100
|
$6.800
|
$6.420
|
|
|
SALV,HAUL & STKPL RCL APH PV (2" TO 3")
|
SY
|
2,308.000
|
$1.500
|
$5.800
|
$4.900
|
$7.800
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
18,768.000
|
$64.070
|
$103.060
|
$89.700
|
$93.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
6,865.000
|
$110.000
|
$140.620
|
$130.400
|
$140.000
|
|
|
CEM STABIL BKFL
|
CY
|
419.000
|
$60.000
|
$66.460
|
$109.000
|
$125.000
|
|
|
CUT & RESTORING PAV
|
SY
|
390.000
|
$233.340
|
$222.530
|
$149.000
|
$150.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
276.500
|
$53.000
|
$66.460
|
$109.000
|
$125.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
18.000
|
$60.000
|
$117.350
|
$125.000
|
$65.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
297.000
|
$3.110
|
$1.260
|
$0.600
|
$12.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
10.000
|
$315.000
|
$275.360
|
$400.000
|
$148.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
21.000
|
$420.000
|
$605.410
|
$774.000
|
$650.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
164.000
|
$98.000
|
$151.640
|
$150.000
|
$50.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
508.000
|
$87.000
|
$153.560
|
$151.000
|
$65.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
350.000
|
$65.000
|
$160.260
|
$173.000
|
$76.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
60.000
|
$77.000
|
$190.160
|
$174.000
|
$140.000
|
|
|
INLET (COMPL)(PSL)(RG)(3FTX3FT)
|
EA
|
1.000
|
$10,000.000
|
$4,348.710
|
$5,280.000
|
$4,500.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
1.000
|
$16,000.000
|
$10,883.880
|
$7,840.000
|
$8,500.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
1.000
|
$10,000.000
|
$5,230.180
|
$4,500.000
|
$5,500.000
|
|
|
INLET (COMPL)(TY AZ2G)
|
EA
|
1.000
|
$20,000.000
|
$7,940.370
|
$6,860.000
|
$7,500.000
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
1.000
|
$1,600.000
|
$1,009.010
|
$2,890.000
|
$1,500.000
|
|
|
INLET (COMPL) (TY C) (CIP)
|
EA
|
25.000
|
$10,000.000
|
$6,955.670
|
$3,930.000
|
$7,850.000
|
|
|
MANH (COMPL) (TY A) (CIP)
|
EA
|
15.000
|
$10,000.000
|
$9,302.640
|
$2,440.000
|
$8,650.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,200.000
|
$1,598.500
|
$2,200.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$2,011.710
|
$4,400.000
|
$1,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
21.000
|
$1,500.000
|
$500.490
|
$1,200.000
|
$1,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
26.000
|
$584.000
|
$476.990
|
$760.000
|
$850.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
14.000
|
$629.000
|
$605.240
|
$920.000
|
$850.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,147.000
|
$19.000
|
$21.970
|
$23.400
|
$40.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$428,000.000
|
$300,000.000
|
$750,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$5,000.000
|
$7,522.200
|
$2,900.000
|
$50,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
20.000
|
$70.000
|
$201.800
|
$127.000
|
$109.540
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
20.000
|
$9.000
|
$63.060
|
$37.000
|
$31.890
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,118.000
|
$2.500
|
$2.520
|
$3.800
|
$3.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,118.000
|
$0.750
|
$0.950
|
$0.700
|
$0.620
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
192.000
|
$4.000
|
$7.570
|
$6.800
|
$5.830
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
192.000
|
$1.000
|
$1.260
|
$2.500
|
$2.140
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
120.000
|
$41.000
|
$92.940
|
$79.000
|
$75.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
560.000
|
$39.000
|
$84.740
|
$72.000
|
$68.500
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
4,760.000
|
$8.000
|
$16.630
|
$12.600
|
$25.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
560.000
|
$22.000
|
$17.480
|
$12.600
|
$25.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
5,920.000
|
$4.500
|
$9.000
|
$10.000
|
$12.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,240.000
|
$10.000
|
$9.450
|
$10.000
|
$12.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
5,320.000
|
$6.000
|
$17.050
|
$12.600
|
$25.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
1,160.000
|
$8.000
|
$17.050
|
$12.600
|
$25.000
|
|
|
CONC CURB (TY II)
|
LF
|
577.000
|
$10.000
|
$5.940
|
$12.000
|
$37.600
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
8,158.000
|
$8.000
|
$5.940
|
$4.400
|
$11.840
|
|
|
DRIVEWAYS (CONC)
|
SY
|
613.500
|
$71.000
|
$108.770
|
$103.000
|
$130.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
169.000
|
$40.000
|
$95.380
|
$125.000
|
$70.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
613.000
|
$21.000
|
$23.370
|
$80.500
|
$50.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
62.000
|
$62.000
|
$120.810
|
$105.000
|
$100.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
3.000
|
$2,500.000
|
$2,301.360
|
$1,820.000
|
$3,500.000
|
|
|
CONC MEDIAN
|
SY
|
334.000
|
$75.000
|
$84.960
|
$71.000
|
$150.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$3,000.000
|
$2,457.820
|
$1,500.000
|
$1,321.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
84.000
|
$9.000
|
$31.630
|
$19.700
|
$17.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
211.000
|
$1.150
|
$3.350
|
$2.100
|
$1.800
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
422.000
|
$1.500
|
$3.540
|
$2.200
|
$1.900
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,100.000
|
$1,680.100
|
$1,050.000
|
$903.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
21.000
|
$536.000
|
$672.480
|
$540.000
|
$529.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
17.000
|
$670.000
|
$983.310
|
$668.000
|
$609.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
5.000
|
$600.000
|
$844.740
|
$1,056.000
|
$883.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$787.000
|
$1,270.750
|
$940.000
|
$923.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$986.000
|
$1,289.950
|
$1,050.000
|
$946.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
54.000
|
$93.000
|
$123.600
|
$70.300
|
$48.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
31,086.000
|
$0.770
|
$1.260
|
$1.200
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
14,883.000
|
$0.790
|
$1.260
|
$1.200
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$249.000
|
$290.090
|
$302.000
|
$230.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
6.000
|
$368.000
|
$529.730
|
$360.000
|
$420.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$270.000
|
$327.930
|
$325.000
|
$260.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
8.000
|
$589.000
|
$882.890
|
$620.000
|
$700.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
99.000
|
$4.400
|
$6.310
|
$5.500
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
87.000
|
$4.500
|
$6.310
|
$5.500
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
9,344.000
|
$0.670
|
$0.630
|
$0.600
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
21,221.000
|
$0.100
|
$0.060
|
$0.170
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,025.000
|
$0.150
|
$0.060
|
$0.300
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
128.000
|
$0.440
|
$0.320
|
$0.370
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
541.000
|
$1.050
|
$0.630
|
$0.600
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$24.000
|
$12.610
|
$11.600
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
6.000
|
$23.000
|
$12.610
|
$15.100
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$25.000
|
$12.610
|
$15.100
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
8.000
|
$149.000
|
$12.610
|
$37.150
|
$10.000
|
|
|
REMOVAL OF CONCRETE FOUNDATIONS
|
EA
|
2.000
|
$333.690
|
$860.140
|
$1,160.000
|
$550.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
681.000
|
$6.000
|
$15.920
|
$5.800
|
$12.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
675.000
|
$27.500
|
$6.740
|
$17.400
|
$6.000
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
59.000
|
$27.000
|
$7.540
|
$23.200
|
$6.000
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
366.000
|
$19.140
|
$10.250
|
$29.000
|
$9.000
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
360.000
|
$33.000
|
$12.360
|
$35.000
|
$9.000
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
587.000
|
$36.550
|
$14.610
|
$40.600
|
$12.000
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
634.000
|
$55.900
|
$18.040
|
$46.400
|
$12.000
|
|
|
STORM SEWER CLEANING (PIPE)(55"-74"DIA)
|
LF
|
886.000
|
$60.000
|
$25.210
|
$52.200
|
$14.000
|
|
|
TREE PROTECTION
|
EA
|
8.000
|
$500.000
|
$441.440
|
$870.000
|
$500.000
|
|
|
TACK COAT
|
GAL
|
39.000
|
$5.000
|
$4.780
|
$29.000
|
$3.750
|
|
|
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
|
TON
|
100.000
|
$205.000
|
$254.790
|
$174.000
|
$200.000
|
|
|
THERMO PIPE(18")(PP)(TY S)(TY II)
|
LF
|
40.000
|
$65.000
|
$108.600
|
$125.000
|
$45.520
|
|
|
ASBESTOS ABATEMENT (OTHER)
|
LF
|
2,232.000
|
$70.000
|
$11.140
|
$69.000
|
$65.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
70.000
|
$89.000
|
$100.900
|
$340.000
|
$75.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
8,338.000
|
$0.680
|
$0.950
|
$0.650
|
$0.750
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
1,830.000
|
$0.790
|
$0.950
|
$0.650
|
$0.750
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
1,025.000
|
$1.360
|
$1.890
|
$1.150
|
$1.500
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
128.000
|
$3.840
|
$7.570
|
$3.200
|
$6.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
541.000
|
$8.000
|
$15.140
|
$5.900
|
$12.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
9,223.000
|
$0.690
|
$0.950
|
$0.650
|
$0.750
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
1,830.000
|
$0.890
|
$1.260
|
$0.750
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
732.000
|
$175.000
|
$165.230
|
$165.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
66.000
|
$365.000
|
$503.820
|
$180.000
|
$280.000
|
|
|
WATER MAIN PIPE (PVC) (6IN) (C-900)
|
LF
|
32.000
|
$84.000
|
$166.070
|
$223.000
|
$321.100
|
|
|
WATER MAIN PIPE (PVC) (8IN) (C-900)
|
LF
|
637.000
|
$61.000
|
$124.670
|
$180.000
|
$290.700
|
|
|
WATER MAIN PIPE (PVC) (12IN) (C-900)
|
LF
|
55.000
|
$130.000
|
$255.870
|
$292.000
|
$399.950
|
|
|
WTR MAIN PIPE (PVC)(RESTRAINED JT) 8IN
|
LF
|
195.500
|
$74.000
|
$93.200
|
$143.000
|
$255.550
|
|
|
FIRE HYDRANT BRANCH (LEAD) (6IN)
|
LF
|
24.000
|
$83.000
|
$67.640
|
$52.000
|
$215.650
|
|
|
JCK TUN BOR OR AUG WTR MAIN (PVC) (8IN)
|
LF
|
258.000
|
$322.000
|
$104.270
|
$102.000
|
$532.000
|
|
|
JCK TUN BOR OR AUG CSG (STL) (12IN)
|
LF
|
97.000
|
$361.000
|
$186.710
|
$176.000
|
$598.500
|
|
|
JCK TUN BOR OR AUG CSG (STL) (16IN)
|
LF
|
195.500
|
$541.000
|
$217.890
|
$243.000
|
$798.000
|
|
|
SERVICE LINE (SHORT SIDE) (1-1/2"TO 2")
|
EA
|
1.000
|
$2,046.000
|
$2,535.830
|
$2,300.000
|
$4,998.900
|
|
|
SERVICE LINE (LONG SIDE) (1-1/2"TO 2")
|
EA
|
4.000
|
$4,000.000
|
$4,799.010
|
$4,200.000
|
$20,544.700
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
3.000
|
$5,650.000
|
$6,886.360
|
$6,600.000
|
$6,732.650
|
|
|
REMOVING FIRE HYDRANT
|
EA
|
2.000
|
$742.000
|
$234.440
|
$1,136.000
|
$4,269.300
|
|
|
REMOVING WATER VALVE AND BOX
|
EA
|
2.000
|
$618.000
|
$200.160
|
$600.000
|
$2,021.600
|
|
|
WET CONNECTION (6IN)
|
EA
|
1.000
|
$4,482.000
|
$2,239.210
|
$1,674.000
|
$5,630.650
|
|
|
WTR MAIN PIPE (PVC) (RESTRAINED JT) 6IN
|
LF
|
97.000
|
$100.000
|
$81.120
|
$157.000
|
$167.200
|
|
|
ASBESTOS ABATEMENT SUPT & COORDINATION
|
LS
|
1.000
|
$5,000.000
|
$8,677.500
|
$8,700.000
|
$7,500.000
|
|
|
REMOVE WATER LINE (ASBESTOS-CEMENT)
|
LF
|
2,232.000
|
$14.000
|
$19.850
|
$47.000
|
$30.000
|
|
Totals: |
$5,551,714.960
|
$7,143,864.159
|
$7,622,965.840
|
$9,541,638.222
|