Show Job Controls
Bid Cobra

BRAZORIA SH 332 (0586-01-066)

Items: 71

County: BRAZORIA
Length: N/A
Highway: SH 332
District: HOUSTON
Control Number: 0586-01-066
DBE Goal: N/A
Project: NH 2018(666)
Guaranty: N/A
Time: 95 WORKING DAYS
Engineer's Estimate: $3,226,590.95
Date: 03/06/2018 (8 years ago)
Contract Number: N/A
Type: SC, LEVEL UP, W/ LP DETRS & O/L
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$3,226,590.95
$2,395,790.47
Over/Under Est: -25.75% -$830,800.48
Over/Under Est: -14.69% -$473,987.23
Amt Left: 14.89% $356,813.25
Over/Under Est: -5.7% -$183,938.47
Amt Left: 27% $646,862.01
Delta: -10.54% -$290,048.76

Bid Items & Bid Tabulations

71 Total 0 of 71
BRAZORIA  |  SH 332  |  HOUSTON  |  0586-01-066  |  03/06/2018  |  $3,226,590.95  |  NH 2018(666)  |  SC, LEVEL UP, W/ LP DETRS & O/L  |  95 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
ANGEL BROTHERS HOLDINGS CORP.
JAMES CONSTRUCTION GROUP, L.L.C.
BACKFILL (TY A OR B)
STA 120.000 $150.000 $125.000 $240.000 $188.000
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 28,767.000 $1.200 $0.500 $2.300 $1.600
SALV,HAUL & STKPL RCL APH PV(3/4")
SY 960.000 $2.000 $3.000 $1.950 $8.000
ASPH (MULTI OPTION)
GAL 11,841.000 $2.300 $2.800 $2.900 $2.500
ASPH (A-R TYPE II OR III)
GAL 66,303.000 $5.000 $2.500 $2.000 $3.500
AGGR(TY-PB GR-4 SAC-B)
CY 1,203.000 $100.000 $98.500 $120.000 $125.000
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 2,453.000 $130.000 $72.000 $75.400 $85.000
D-GR HMA TY-D SAC-A PG70-22
TON 10,003.000 $80.000 $72.000 $85.000 $87.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 500.000 $65.000 $50.000 $50.000 $59.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 160.000 $65.000 $85.000 $72.000 $118.000
FULL - DEPTH REPAIR CRCP (10")
SY 300.000 $260.000 $225.000 $345.000 $475.000
CONC STR REPAIR (STANDARD)
SF 15.000 $270.000 $150.000 $100.000 $475.000
RIPRAP (MOW STRIP)(4 IN)
CY 26.000 $520.000 $600.000 $600.000 $1,050.000
MOBILIZATION
LS 1.000 $132,379.000 $30,000.000 $70,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $10,000.000 $1,500.000 $2,400.000 $2,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,075.000 $21.000 $22.000 $23.500 $19.500
SHORT RADIUS
LF 400.000 $50.000 $30.000 $28.500 $23.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $1,100.000 $1,000.000 $650.000 $450.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $1,400.000 $1,200.000 $1,010.000 $950.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 15.000 $1,870.000 $1,700.000 $1,570.000 $1,450.000
REMOVE METAL BEAM GUARD FENCE
LF 2,187.000 $5.000 $3.000 $2.150 $1.750
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,540.000 $2,300.000 $2,500.000 $1,990.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $250.000 $300.000 $320.000 $190.000
CONDT (PVC) (SCH 80) (2")
LF 1,545.000 $8.500 $9.500 $7.400 $9.450
CONDT (PVC) (SCH 80) (2") (BORE)
LF 705.000 $12.000 $13.250 $12.700 $13.150
ELEC CONDR (NO.6) BARE
LF 2,250.000 $1.100 $1.200 $1.700 $1.150
GROUND BOX TY D (162922)W/APRON
EA 24.000 $951.000 $700.000 $950.000 $635.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 28.000 $26.000 $20.000 $22.000 $18.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 48.000 $27.000 $28.000 $34.000 $20.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 45,190.000 $0.200 $0.150 $0.150 $0.170
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 78,270.000 $0.500 $0.200 $0.200 $0.210
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 78,270.000 $0.500 $0.200 $0.200 $0.210
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,841.000 $0.350 $0.250 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 690.000 $4.200 $1.500 $1.600 $2.200
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 162.000 $57.000 $40.000 $42.000 $66.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 6.000 $115.000 $150.000 $160.000 $79.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 33.000 $55.000 $40.000 $42.000 $70.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 36,546.000 $0.200 $0.150 $0.150 $0.170
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 45,190.000 $0.200 $0.150 $0.150 $0.170
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 78,270.000 $0.200 $0.200 $0.200 $0.210
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 78,270.000 $0.500 $0.200 $0.200 $0.210
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,137.000 $1.000 $1.200 $1.300 $0.660
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 268.000 $6.000 $6.000 $6.400 $7.800
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 55.000 $100.000 $100.000 $105.000 $110.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 13.000 $130.000 $120.000 $130.000 $110.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 2.000 $250.000 $250.000 $265.000 $470.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 16,504.000 $0.800 $0.300 $0.300 $0.280
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 28,548.000 $1.000 $0.350 $0.400 $0.360
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 28,548.000 $0.500 $0.350 $0.400 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 12,182.000 $0.300 $0.300 $0.300 $0.280
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 16,504.000 $0.800 $0.300 $0.300 $0.280
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 28,548.000 $0.500 $0.350 $0.400 $0.360
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 28,548.000 $0.500 $0.350 $0.400 $0.360
REFL PAV MRKR TY I-A
EA 55.000 $3.500 $3.950 $4.200 $3.200
REFL PAV MRKR TY II-A-A
EA 1,290.000 $4.000 $3.950 $4.200 $3.200
ELIM EXT PAV MRK & MRKS (4")
LF 13,460.000 $0.300 $0.250 $0.300 $0.320
ELIM EXT PAV MRK & MRKS (8")
LF 305.000 $0.500 $0.500 $0.500 $0.630
ELIM EXT PAV MRK & MRKS (24")
LF 63.000 $2.000 $2.000 $2.150 $1.600
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $35.000 $35.000 $37.000 $110.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $37.000 $35.000 $37.000 $110.000
PAV SURF PREP FOR MRK (4")
LF 4,292.000 $0.050 $0.010 $0.010 $0.010
PAV SURF PREP FOR MRK (6")
LF 1,140.000 $0.030 $0.020 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 115.000 $0.080 $0.030 $0.030 $0.040
PAV SURF PREP FOR MRK (24")
LF 25.000 $0.200 $0.050 $0.050 $0.100
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $6.200 $3.000 $3.200 $6.300
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $8.500 $5.000 $5.300 $6.300
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 5,820.000 $1.000 $1.200 $1.350 $1.100
VEH LP DETECT (SAWCUT)
LF 3,350.000 $9.500 $9.500 $9.500 $9.350
CAM (ASPHALT) PG(70-22)
TON 480.000 $130.000 $97.000 $108.000 $120.000
CAM (AGGREGATE)
TON 5,889.000 $114.000 $97.000 $108.000 $120.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 218.000 $40.000 $50.000 $60.000 $115.000
Totals: $3,226,590.950 $2,395,790.470 $2,752,603.720 $3,042,652.480